  • Good day mga Boss. In this video pag usapan natin kug pano ba tayo mag size ng capacity at circuit breaker ng transformer. Sana makatulong sa inyo.
    Thank you for watching!
    Don't forget to like, comment and subscribe. God Bless

ความคิดเห็น • 85

  • @arniemahinay9136
    @arniemahinay9136 3 ปีที่แล้ว +1

    Thanks engr. sa topic mo

  • @bbbbbbbb1507
    @bbbbbbbb1507 3 ปีที่แล้ว +1

    thank you sir noel!! the best info out here in youtube.

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Thank you🙂🙂

  • @huskyvoicetutorial2455
    @huskyvoicetutorial2455 3 ปีที่แล้ว +1

    Thanks sir additional info

  • @jaysonpipogudasen5178
    @jaysonpipogudasen5178 3 ปีที่แล้ว +1

    Good Day Sir. Maraming salamt po sa video. Request ko lang din po sana, generator sizing, capacitor bank sizing at yung mga protective device nila, saka busbar sizing at kung kailan gagamit ng busbar. Salamt po

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว +2

      Cge boss noted po..hehehe..dami ah

    • @jaysona1489
      @jaysona1489 3 ปีที่แล้ว +1

      Yes sir maganda to sir

    • @jaysonpipogudasen5178
      @jaysonpipogudasen5178 3 ปีที่แล้ว +1

      @@NoelLaude maraming salamat sir. Maganda po kasi mga turo niyo. Next topic din po sir parrallel transformer design at ano po gamit ng bus coupler. Salamat po ulit ng marami Sir hehehe.

  • @jhuzcelclear1887
    @jhuzcelclear1887 3 หลายเดือนก่อน

    Boss pwede ka mag discuss about fault calculation

  • @lielandlonzaga947
    @lielandlonzaga947 3 ปีที่แล้ว

    Maraming salamat sir bossing marami akung natutunan sa inyu po.

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Salamat din po. Masaya po ako at nakakatulong sa inyo

  • @engr.bladstv1025
    @engr.bladstv1025 3 ปีที่แล้ว

    Thank you for sharing sir, dami ko natutunan. God bless you and to your YT Channel

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Thank you din Boss

  • @christiancuerdo2194
    @christiancuerdo2194 3 ปีที่แล้ว

    Salamat po addition sa knowledge po

  • @jeanj7154
    @jeanj7154 3 ปีที่แล้ว +2

    Sir, pwede po magrequest? Time Current Curve po para sa relay coordination. Salamat po in advance.

  • @sirdenstv9747
    @sirdenstv9747 ปีที่แล้ว +1

    sir sa schedule ng load .. san po nyo binase yung demand factor per ckt? yung 0.75, 0.98, 1.0, 0.94 ... ano po ba basis neto para iassign per ckt ?

  • @arielbayo3703
    @arielbayo3703 6 หลายเดือนก่อน +1

    Magandang araw/ gabi sayo sir...dati din po ako sa saudi ngayon lokal na ako nagtatrabaho bilang maintenance...may tanong lang sana ako sir...sana ma bigyan nyo po nang linaw...ilang kilowatts na load ba ang kaya nang 3 single phase 75 kva each transformer na naka bank ng wye- delta...at kung pwede sir..paano i compute o ano yung formula....sana inyong mapansin ...para maliwanagan ang isip ko.haha...ingat sir GOD BLESS..

  • @amorcabalar8167
    @amorcabalar8167 2 ปีที่แล้ว

    Salamat po Sir

  • @kaiser830
    @kaiser830 3 ปีที่แล้ว

    Quality CONTENT! keep it up Engr!

  • @edwardnoora7026
    @edwardnoora7026 3 ปีที่แล้ว +1

    Sir kaka subscribed ko lang po dito thanks po sa mga videos nyo ask ko lng din po if mabasa nyo to computation lng po ng transformer losses natin. thank you

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Cge boss try natin gawa yn.. salamat and God bless

  • @RandyAmorchannel
    @RandyAmorchannel 3 ปีที่แล้ว

    ayos na ayos boss

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Salamat boss

  • @GoryuChannel
    @GoryuChannel 3 ปีที่แล้ว

    Salamat po sa video mo. Ano po ang upside at downside ng paggamit ng dry type transformer single to three phase?

  • @leusmaximusx
    @leusmaximusx หลายเดือนก่อน

    @ 26:10, Code provides that CB or Fuse Rating is at 125% of "Transformer Rated Current" , if the Tx you had selected is rated at 2MVA, then its Rated Current is = 2000KVA/1.732/0.4kV = 2886.8A . Why then did you use the demand load 1867.1KVA (2695A) A as basis for Secondary CB rating , are you applying other rules when it specifically states "Rated Current as basis?
    Tx Secondary Conductors are sized base on TX current rating , not bassed on load rating because the Tx sec. conductor ampacity cannot be less than the OCPD sized under 4.50.1.3B considering the 800A rule for Conductor protection.
    an exeption to this may be small dry type transformer with specific load installed, but for a main distribution Tx, Rated Current should be the basis ie. 1.25 * 2887A = 3608.8A and not the maximum demand load, which the ACB can anyway be set to trip at 2695A or less.
    regards

  • @ambisyosongofw2187
    @ambisyosongofw2187 2 ปีที่แล้ว

    Sir Noel gud pm, bka may computation kayo ng short circuit for kaic pa share nman di ksi ako sure ng calculation ko. Tnx in advance

  • @eduardocastillo5027
    @eduardocastillo5027 3 ปีที่แล้ว +1

    sir sana pinakita mo din yung table ng circuit breaker

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Usually boss available yn sa mga manufacturer. Depende n lng Kung anong brand ung approved ng client. As long na alam mo size ng ocpd madali ng mag select.

  • @yuji1919
    @yuji1919 2 ปีที่แล้ว +1

    Newly subsciber sir , Tanong ko lng po pano po isolve yung total load po ng isang facility kung nka3 phase po sya tsaka pano rin po malalaman kung anong size ng generator ang ilalagay dun , di po ba nka KW po pag sinolve yung total load eh nka KVa nman po yung generator po???

    • @NoelLaude
      @NoelLaude  2 ปีที่แล้ว

      Kung wla syang as built drawing need m talagang isaisahin lahat Ng connected loads. Tapos gawan m Ng load schedule. As per naman s generator. Identify mo Kung anoanong load Ang susuplyan Ng generator mo. Depende din yn sa type Ng facility. Pero normally ilaw, outlet, communication at fire alarm system. Kung may BMS at access control minsan sinasama din yn Kung meron ung facility nyo. Kung kw ung loads divide m lng s power factor para maconvert s kva.

    • @yuji1919
      @yuji1919 2 ปีที่แล้ว

      @@NoelLaude Thank you poo sir

  • @dhardstv9818
    @dhardstv9818 2 ปีที่แล้ว

    sir idol..sample computation ka ng panel board loaded with accu outdoor unit?

  • @sinigangnabangus8053
    @sinigangnabangus8053 ปีที่แล้ว

    Good day po,,,paano po ba i-compute total wattage Ng stepdown transformer na gagamitin?
    Bale po kasi may dalawang Aircon dito na 120V, 1800 watts at 1560 watts.Balak ko sa Isang stepdown transformer lang sila Nakasaksak.
    Ilang watts po ba Ng stepdown transformer Ang dapat Kong bilhin? Salamat po,Sana po masagot

  • @benjamenclemenal.5523
    @benjamenclemenal.5523 ปีที่แล้ว

    Gud day engr. If the source of 240volts is 10 kva syncronous single phase alternator drive by 24hp diesel engine and my total load is 17kw. What type of transformer to buy???

  • @aldamilwahid1959
    @aldamilwahid1959 2 ปีที่แล้ว

    Tama ba Sir pg , Single phase . Yun Maximum LOAd ng (Pole-mounted transformer ) = (KVA)(1000)/V

  • @aaahhitlogwithegg447
    @aaahhitlogwithegg447 3 ปีที่แล้ว

    Good day sir. Meron din po bang Maximum Load (MDL) ng Transformer na nasa PEC katulad nang nabanggit mo sa 9:42? Kung meron, anong specific Article and section. Salamat

  • @paulmontanes7155
    @paulmontanes7155 2 ปีที่แล้ว

    Gud day Sir Noel! Ask ko po kung anung way pra mlaman ang capacity ng trasformer kung wala ng plate n nklagay s transformer?

    • @NoelLaude
      @NoelLaude  2 ปีที่แล้ว

      Good day sir.. as per my experience ibaiba Ang frame at orientation Ng terminals Ng transformer depende s manufacturer Kaya mahirap malaman ung rating Ng transformer Kung wlang nameplate. I suggest n s as-built drawings n lng ( SLD or plan layout). Kung may operation and maintenance manual kayo pwede din dun.

  • @HAPPYandFUNNY12
    @HAPPYandFUNNY12 2 ปีที่แล้ว

    Sir. Can you do design a three phase explaining everything while doing the design mejo struggle ako because i am newly registered electrical engineer. I love your content sir hope you notice my request.

    • @NoelLaude
      @NoelLaude  ปีที่แล้ว

      Good day po sir. Meron po akong video Ng 3phase design. Check nyo Po s videos ko ung Lighting loads, motor loads calculation

  • @skyangelo45
    @skyangelo45 2 ปีที่แล้ว +1

    how about dry type power transformer what percentage of total rating to be use? TIA

    • @NoelLaude
      @NoelLaude  2 ปีที่แล้ว +1

      Up to 90% Ng rating Ng transformer.

  • @Frnciss287
    @Frnciss287 3 ปีที่แล้ว

    Hi sir noel! May I just ask, what do you usually use in design for basis of equipment rating capacity? Is it the total connected load (cl)? Or the max demand load? Is it not the CL? as you risk the transformer being overloaded because it was designed on the assumption that it won't exceed the max demand load.
    Thank you

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      We size our transformer on max demand loads, normally up to 80% only of xformer rating. Also, I mentioned on the video, that we consider the diversity factor. Meaning all connected loads are not running simultaneously.
      As long as we follow the correct sizing of ocpd and breaker settings, overload will not be an issue.

  • @camchannel17
    @camchannel17 ปีที่แล้ว

    Sir ilang meters po ba kaya ng isang singe phase transformer?

  • @jerardparato114
    @jerardparato114 3 ปีที่แล้ว

    Need po talaga Sir na malaki working space para sa maintenence,

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Oo tama.. kc tyong mga electrical nahihirapan.

  • @jerardparato114
    @jerardparato114 3 ปีที่แล้ว +1

    Sir noel last question po, bakit di po yung mismong rating ng transformer ang ginamit sa computation, bakit di po yung 2500 kva na transformer?

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว +1

      Nabanggit ko yn sa bandang dulo Ng video. May ibang Engr n ganyan ang practice pero Wla akong reference standard n nabasa n ganun dapat ang gagawin. Pero jn sa sample n ginamit ko.. the same size p rin ng ocpd gagamitin mo Kung calculated loads ang basis mo.

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว +1

      Sa pagsize kc ng transformer, as much as possible ung need lng ng building.. d pwede din ung malaki allowance mo kc medyo Mahal ung transformer

    • @jerardparato114
      @jerardparato114 3 ปีที่แล้ว

      Maraming salamat engr. Noel

  • @nathanieltorre2
    @nathanieltorre2 3 ปีที่แล้ว +1

    Sir, ung 600% po ba is para na yan sa inrush current ng transformer pag mag energize?

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Yes boss, para sa inrush current sya.

  • @Sargeblog.0607
    @Sargeblog.0607 2 ปีที่แล้ว

    Good pm anu ang malaking wire sa transpormer primary or secondary pareho lng ba stepdouwn or step up.

    • @NoelLaude
      @NoelLaude  2 ปีที่แล้ว +1

      Magiging magkaiba size Ng cable mo s primary at secondary kc magkaiba voltage nila. Mas malaki cable s mababang voltage

  • @jeffreycarnate2049
    @jeffreycarnate2049 ปีที่แล้ว

    Saang table makikita ang diversity factor?

  • @edmarmaravilla1369
    @edmarmaravilla1369 3 ปีที่แล้ว

    boss pashout out naman po...want ko rin po na malaman kung yun pong submersible pump na 5hp ay kya ang transformer na 10kb yung control nya po may setup na line 1 line 2 ang circuit breaker po 60 amperes bigla po me pumutok sa breker nung bigla ko po itinaas ang breker para mabuhay ang makina...umandar lang po nang konti ung pump tas namatay napo ano po kaya problema nun...? di kaya po naapektuhan ang pump?

  • @ronnelgaston8933
    @ronnelgaston8933 3 ปีที่แล้ว +1

    sir sa secondary ocpd nakasaad sa nec na up to 125% of transformer rated current..bakit yung maximum demand kva ang gamit sa pag size?

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      I think nabanggit ko n may ibang designers n ganyan ang practice, automatic 125% ng rated current ng transformer ang ginawa s pag size ng ocpd. Wla nman problem dun.. kc pag nagcompute k ng loadsyan p rin ang basis m s pag size ng ocpd

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Every project ibaiba condition/situations minsan Hindi pa identify ung total loads. Kaya ung iba, kinoconsider n ung max size ng ocpd

    • @ronnelgaston8933
      @ronnelgaston8933 3 ปีที่แล้ว

      okay po sir..salamat po sa pagsagot ng tanong ko..

  • @pesachristiandensonngo5155
    @pesachristiandensonngo5155 3 หลายเดือนก่อน

    Sir, di ko lang gets dun sa Primary OCPD niyo. Nakalagay ay for transformer with secondary voltage greater than 600 volts. Hindi ba ang secondary voltage niyo dun at 400 volts? and and Primary voltage ay 13.8 KV?

    • @NoelLaude
      @NoelLaude  2 หลายเดือนก่อน

      Yes po, ung 13.8kV ung primary and 400V ung secondary

    • @pesachristiandensonngo5155
      @pesachristiandensonngo5155 2 หลายเดือนก่อน

      @@NoelLaude Then kung 400 volts secondary, di siya applicable sa provision na transformer with secondary voltage greater than 600 volts. Hindi po ba?

  • @hybridmars
    @hybridmars 3 ปีที่แล้ว +1

    boss bakit ACB ang nasa secondary protection mo at VCB ang nasa Primary protection? pwede ba ako gumamit ng MCB para sa secondary?

  • @cesardeveraturda257
    @cesardeveraturda257 2 ปีที่แล้ว

    hindi ba rating ng transformer ang gagamitin or load calculation sirbakit hindi 2500kva sir

  • @aaroncervania1984
    @aaroncervania1984 3 ปีที่แล้ว

    Hi Engr. Ano reference mo for Demand factor how you compute DF .79, .98, .94 or Meron ba Tayo table for demand factor.

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Good day boss. Ung DF n .79, .98,,. Nakuha yn sa Calculated df Ng mga panels n connected s MDB TR1.
      About s DF table, maron article na nabanggit sa pec Kung anong DF Ang gagamitin natin, for lighting, outlets.

  • @johnrendellcampos9704
    @johnrendellcampos9704 3 ปีที่แล้ว

    Sir ok lang po ba gumamit ng tie breaker instead of RMU, since switching operation lang din naman para sa two sources yung role nya. Muka kasing secondary selective arrangement lang din yung nasa sample nyo sir

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว +1

      Pwede naman depende sa design mo at s type Ng building. Dto samin Ang main MV switchgear namin may tie breaker, meron din kming mga building n may MV switchgear merong tie breaker. Pero karamihan gamit nmin rmu lng Lalo n Kung d nman essential ung buildings. Para continues p rin ung mv ring network namin.

  • @jerardparato114
    @jerardparato114 3 ปีที่แล้ว

    Sir Noel, paano po cable sizing ng transformer? Salamat po

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Sa primary atleast 125%. Sa secondary depends sa type ng MDB mo.

  • @malikshehran4978
    @malikshehran4978 3 ปีที่แล้ว

    Hello sir pls give us lecture in english language.

  • @amirpunzalan7773
    @amirpunzalan7773 3 ปีที่แล้ว

    Engr. Usually ba RMU ginagamit if you have two power source? Sa Saudi ba dalawa ba lagi power sources nila? unlike sa atin na ung generator ung back up.

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Yes boss common dto two power sources. Bukod dun may genset din s facility. Depends s type Ng building, minsan whole capacity, minsan fire fighting and security lng ung may genset.

    • @amirpunzalan7773
      @amirpunzalan7773 3 ปีที่แล้ว +1

      @@NoelLaude salamat engr. Pashare nmn po ng NEC at PEC nyong gamit. Sa email ko po
      engr.armelovargas@yahoo.com

    • @amirpunzalan7773
      @amirpunzalan7773 3 ปีที่แล้ว

      @@NoelLaude engr. Pashare nmn po ng NEC at PEC. Maraming salamat po

  • @manuellastrollo2168
    @manuellastrollo2168 3 ปีที่แล้ว

    Sir ano po yung Ring Main Unit sa electrical system?

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      switching device boss, pero ginagamit ntin sya electrical distribution, loop system particularly sa MV network. Bale two source ung supply natin. Incase magkaroon ng power failure ung isang source, may isa p tyong supply n mag distribute faciity natin.

  • @donvincentsahagun7054
    @donvincentsahagun7054 3 ปีที่แล้ว

    Sir 13.8kv ung primary natin pero san po nyo nakuha ung 17.5 kv sir?

  • @MrRonniemagalang
    @MrRonniemagalang 3 ปีที่แล้ว

    ur transformer capacity is 2,500 kVA, why not it's rating in the selection of OCPD ? Besides, in the calculation of kAIC rating of equipment the rated FLA or based current Ib of transformer is used.

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Yes Boss, I think I've mentioned that in this video, that there are some designers that follows that method.

  • @christiancuerdo2194
    @christiancuerdo2194 3 ปีที่แล้ว

    Sir ano po yong RMU?

    • @NoelLaude
      @NoelLaude  3 ปีที่แล้ว

      Switching equipment sya, particularly ginagamit sya sa medium voltage power supply loop network na may 2 independent power source. In case mawlan Ng supply ung feeder 1, magoopen circuit sya then ung feeder 2 naman magsupply sa network

  • @abdulasiskalid2357
    @abdulasiskalid2357 ปีที่แล้ว

    Sir pano naman pag generator