Verdigris Installer Training

แชร์
ฝัง
  • เผยแพร่เมื่อ 10 ก.ย. 2024
  • Learn how to install the Verdigris energy data gateway and complete setup and configuration using the Verdigris mobile app.
    0:20 - 1. Overview of the equipment
    5:25 - 2. Installation of the equipment
    5:28 - 2a. Mounting the gateway
    7:29 - 2b. Configuration of each type of panel
    9:15 - 2c. Installation of the Hinged CTs
    10:35 - 2d. Installation of the Smart CTs
    12:03 - 2e. Connecting the gateway to the CTs
    13:05 - 2f. Summary and last checks
    14:28 - 3. Setup and configuration (Verdigris Mobile App)

ความคิดเห็น • 2

  • @sebastianusami
    @sebastianusami หลายเดือนก่อน

    I thought you couldnt carry the low voltage sensor wire between boxes within the same conduit as high voltage?

    • @Jarl111
      @Jarl111 หลายเดือนก่อน

      Ideally you'll have separate conduit run for the ethernet. I've seen them run together and it worked, but the proper way to do it is to run comm wires separately.