Model Railway Construction: Laying track across the lift-out bridge

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 มิ.ย. 2024
  • A New Year update from Dongits Model Railway, showing the progress of construction over the Christmas period. The four track mainline is laid from the south side of the room across to the north side via the lift out bridge.
    Table of Contents:
    00:00 - Intro and Review of current situation
    00:27 - Detail design, marking out
    03:29 - Laying the rest of the hidden track
    05:39 - Laying track on both sides of the bridge
    07:30 - Soldering rail to PCB sleepers
    10:16 - "Gluing" plastic chairs to wooden baulks with MEK
    13:50 - Cutting the lift-out bridge back out
    15:56 - Completed bridge
  • วิทยาศาสตร์และเทคโนโลยี

ความคิดเห็น • 15

  • @JamesPetts
    @JamesPetts ปีที่แล้ว +2

    Audio massively better than previous videos.

  • @ModelRailwayShed
    @ModelRailwayShed ปีที่แล้ว +1

    Very impressive bridge great work.

  • @howardpomfret2950
    @howardpomfret2950 ปีที่แล้ว

    Bridge is fantastic. Sound very good

  • @TimsBitsnPieces
    @TimsBitsnPieces 7 หลายเดือนก่อน

    You are definitely making headway.... and it is showing.

  • @James-ih4gz
    @James-ih4gz ปีที่แล้ว

    came over from Jennifer's channel this is awesome layout

  • @chrissouthgate4554
    @chrissouthgate4554 ปีที่แล้ว +1

    Good Audio, Thanks

  • @dundasjunctionmodelr.r-jam8267
    @dundasjunctionmodelr.r-jam8267 ปีที่แล้ว

    Very impressive bridge build , going to subscribe to your channel, excellent details on the build

  • @pedros270
    @pedros270 ปีที่แล้ว

    *Congratulations, explanations and perfect development,
    A query from Spain, where did you get the base grill for the bridge?*

    • @DongitsModelRailway
      @DongitsModelRailway  ปีที่แล้ว

      It's part of the kit. The bridge is two of these, side by side:
      laser-model.store/product/00-gauge-28-711mm-twin-arched-girder-railway-bridge/

    • @pedros270
      @pedros270 ปีที่แล้ว

      @@DongitsModelRailway Grateful for the information and contact.

  • @samuelmcshane6669
    @samuelmcshane6669 ปีที่แล้ว

    I am considering having a 2 lane track above my original 3 lanes. What height would you suggest is a suitable height to allow access if anything went wrong on the bottom rails

    • @DongitsModelRailway
      @DongitsModelRailway  ปีที่แล้ว +1

      Assuming the lower three tracks are effectively hidden loops/sidings/tunnel, you want enough height to stick your arm in above the stock and below the baseboard supports above. You can get away with less if the distance is short.

  • @samuelmcshane6669
    @samuelmcshane6669 ปีที่แล้ว

    Sorry small spelling mistake

  • @Andries1963
    @Andries1963 ปีที่แล้ว +1

    Your vocal audio is excellent one of the best I’ve heard however if you don’t mind me saying the dead bits of total silence are not so good I personally like a gentle bit of incidental music in the background to fill in as for the context of your video I found it very good , quite informative 👍

    • @DongitsModelRailway
      @DongitsModelRailway  ปีที่แล้ว +1

      Thanks. Sounds like I made a good technical decision then, even if not necessarily a good financial one...