Thank you for the insightful webinar on generator synchronization. I have a question regarding synchronizing multiple groups of already synchronized generators. Can we further synchronize separate groups of generators that have already been synchronized within their respective stations? For example, I have nine Diesel generators distributed across three locations, approximately 700 meters apart, with each station having three synchronized DGs. Can these three independent groups be synchronized together into a unified system?
Maraming salamat po. Nagkaroon kami ng panuntunan at dagdag kaalaman hango sa literature ng gender control module. Naniniwala ako na kayo po ay Filipina na eng'r sa larangan ng elektrisidad. Mabuhay po kayo.
I believe in your explanation regarding the 4 generators feeding the load. Though the 4th priority generator started in the intial start up, the priority 1 generator will start, sysnchronize and share the load. Gen 4 will shut down thats how the priority system in Deepsea 8610.
when synchronizing generators does the DSE8610 has built in compounding current transformers or these have to be provided by the customer for each unit
Thank you so much for sharing this video. I want to know if DSE 8610 MKII can be used to synchronize both DG and Grid power or solar power. Also what is the function of duty select configuration? Thank you
how to change the parameters on the panel 8610 to control one input in the absence of three phases, it turns on so that it turns on, and when three phases appear, it turns off.
Dear Sir, Please if I have a screen DSE 8610 MKII and replaced it with a screen of the same type or you made firmware update, how do I transfer the SCADA settings for the screen? Do I record it before replacing or before firmware update and then manually transfer it to the new screen? Best Regards
I have an interesting and intiguing question. Your answer will really help. How to combine two AC source for higher power output? I have 5kw inverter off-grid solar system which can't provide enough power to run a 5 kw motor machine. I also have 3 kw generator. How to combine 5kw solar system with 3kw generator, to get 8 kw system, for generating enough power to run 5 kw motor machine? The inverter specification and generator output is given below as shown in picture: Inverter Voltage =220. Generator voltage =230V±5% Inverter Hz = 50hz . Generator Hz= 60 Hz or 50 hz Inverter wave form= pure swine. generator wave form= not given.
من فضلك عندنا مجموعة مولدات مربوطة تزامن مع بعضها ...وعندنا في المعمل مصدر قدرة 513VD Link یعني نغذیها بثلاثة فیز 380فولت وتخرج 513VDC لتغذیة انفرترات تشغیل مجموعة من المحركات المشكلة عندما یتم فصل الحمل بالكامل مرة وحدة ترتفع الفولتیة من 513VDCالی تقریبا 600VDC
Can I have your e mail.will it be possible that you configure our 8610 controller base on our operation and charge me for setting out controller. In case may we know the cost
Thank you for the insightful webinar on generator synchronization. I have a question regarding synchronizing multiple groups of already synchronized generators. Can we further synchronize separate groups of generators that have already been synchronized within their respective stations? For example, I have nine Diesel generators distributed across three locations, approximately 700 meters apart, with each station having three synchronized DGs. Can these three independent groups be synchronized together into a unified system?
Maraming salamat po.
Nagkaroon kami ng panuntunan at dagdag kaalaman hango sa literature ng gender control module. Naniniwala ako na kayo po ay Filipina na eng'r sa larangan ng elektrisidad.
Mabuhay po kayo.
*genset
Thanks for the webinar
Informative video about Gensets synchronization...
Thanks jubili bros very useful vdo
It was very helpful!
Informative webinar, thank you.
Thank you very much for kind share of technical support
thank you to share about dse electronic.
Explanation very Clear, however some topic has not been covered such as masterless load demand
I believe in your explanation regarding the 4 generators feeding the load. Though the 4th priority generator started in the intial start up, the priority 1 generator will start, sysnchronize and share the load. Gen 4 will shut down thats how the priority system in Deepsea 8610.
Many thanks for sharing informative presentation. is the system needed to have synchronizing panel?
when synchronizing generators does the DSE8610 has built in compounding current transformers or these have to be provided by the customer for each unit
Thank you so much for sharing this video.
I want to know if DSE 8610 MKII can be used to synchronize both DG and Grid power or solar power.
Also what is the function of duty select configuration?
Thank you
hi,thanks for this video
Thank you so much for the educational info.Can i apply this into paralleling to grid and solar.
thanks so much .....
Thank you so much
how to change the parameters on the panel 8610 to control one input in the absence of three phases, it turns on so that it turns on, and when three phases appear, it turns off.
Very cute voice
Good😂
In case communication failure between Ecu and d.g controller how set it right and what are possible resons.
Thank you
Meron ba physical training o seminar nito?
Dear Sir,
Please if I have a screen
DSE 8610 MKII and replaced it with a screen of the same type or you made firmware update, how do I transfer the SCADA settings for the screen? Do I record it before replacing or before firmware update and then manually transfer it to the new screen?
Best Regards
perfect
Thanks
Hello ,i have follow the instructions 2Gen synchronize perfectly but there Circulation current very high wht is the cause
hi. Can we use dse8610 with out ECU connection? because our diesel engine doesn't have ECU.
yes you can
Hi, thanks for the video.
Do you know how to remove the pin fro DSE 7320?
When dse8610 MKII used for synchronization, is it compulsory for remote start signal connection on each generator? or msc link will perform that task?
Msc link will handle the start signals
On the same question, so we only need one starter remot on the engine priority number 1, is that right?
I have an interesting and intiguing question. Your answer will really help.
How to combine two AC source for higher power output?
I have 5kw inverter off-grid solar system which can't provide enough power to run a 5 kw motor machine. I also have 3 kw generator.
How to combine 5kw solar system with 3kw generator, to get 8 kw system, for generating enough power to run 5 kw motor machine?
The inverter specification and generator output is given below as shown in picture:
Inverter Voltage =220. Generator voltage =230V±5%
Inverter Hz = 50hz . Generator Hz= 60 Hz or 50 hz
Inverter wave form= pure swine. generator wave form= not given.
👍
Dear, what is the difference between 8610 LS and 8610mkii LS
could you please give information in GCP-1 CONTROLLER and 6000 series regarding synchronization please
Tienes videos en español?
can you drawing full diagram synchronize 2 genset with DSE 8610
من فضلك عندنا مجموعة مولدات مربوطة تزامن مع بعضها ...وعندنا في المعمل مصدر قدرة 513VD Link
یعني نغذیها بثلاثة فیز 380فولت وتخرج 513VDC
لتغذیة انفرترات تشغیل مجموعة من المحركات
المشكلة عندما یتم فصل الحمل بالكامل مرة وحدة ترتفع الفولتیة من 513VDCالی تقریبا 600VDC
Please reply 🙏🙏 it very important for me
How we can sync 8620
hola quiero aprender sincronismos. saludos
Tienen información en Español
How make English language ?
Can I have your e mail.will it be possible that you configure our 8610 controller base on our operation and charge me for setting out controller. In case may we know the cost