Renovation of the Green Monster-1997 Georgie Boy Cruise Master
ฝัง
- เผยแพร่เมื่อ 7 ก.พ. 2025
- watch the recovery of a graveyard-bound nineties era 38 foot Georgie Boy Cruise Master. This shows that its possible and profitable to find those coaches with cosmetic and even structural issues and put them back on the road. Watch RV Shop and Chef work through the interior and exterior with smart designs and cost saving solutions!
#GeorgieBoy #ChevyP30 #RVrestore
I have this same RV that I’m trying to work on and would like to talk to you. How can I reach out to yuu?
Man this was awesome! There is one of the same year and model that I am trying to pick up (it’s free)… only issue is it doesn’t Run … 42k miles “ran before it sat…” any ideas on where to begin getting the motor running?
yes! Apologies for the delay responding we have been two months in Wyoming, Utah and Colorado. Start with your fuel pump and pickup in the gas tank. Drain the tank and fill partial with new fuel and check fuel pressure up on the engine by removing the fuel line from the tank up at the engine. It has a filter in the tank itself (I think) and then an inline filter about halfway down the drivers frame rail. I think this pump has fairly high pressure, like 80 PSI, so if you are not getting pressure it won't start. We had to go through a number of other parts up on the engine--like the mass air flow sensor and others. I will try to find any references if you are still working this project.
Does your dash air work? Do you know where the relays are for the compressor and the fan? Great video!
We sold the rig quite awhile back- the dash air was good, but I can't remember locations for the compressor and fan- much of the electronics and fusing was under the front cowl and we had access in through the bottom of the frame where a panel was removed so it was easy to work on.