Thank For Watching the Video , Glad that this video has reached till your Suggestions , Sir kindly share your opinion about editing and videography what improvements can be made , Kindly share this video at your level Thank U 😊
Great Capture Bro for given information between Daund - Solapur line section. And Bro, I hope Wadi - Daund (Via. Solapur) line section Doubling and Electrification work constructions get complete in March - April 2021. After that when electrification routes get completed then so many trains hauled with Electric loco in this route.
Bro after that Wadi - Daund (Via. Solapur) line section doubling and electrification get completed. And I want to see specially these trains like:- 1) 11301/11302 Udyan Express runs with Electric loco of WAP-7 Kalyan shed. 2) 11013/11014 Ltt Kurla - Coimbatore Express (this train from Ltt Mumbai to KSR Bengaluru City runs with Electric Loco like WAP-7 KYN/RPM/ED sheds either WAP-4 then this train loco change upto electric to diesel from KSR Bengaluru City to Coimbatore runs with Diesel Loco of WDP-4D KJM/GOC/ED sheds). 3) 12115/12116 Siddheshwar Express runs with Electric Loco likes WCAM-2, WCAM-3 and WAP-7 from Kalyan shed (But specially WCAM-2 and WCAM-3 from Kalyan shed both Electric Locos runs upto Solapur). Bro I want to see these express trains should be runs with Electric Loco in this route soon.
From Chennai. We used to travel to Valsad via Gulbarga, Solapur and Daund. We are waiting for doubling and electrification of this line. The distance of 338 kilometres slows down our journey.
सेंट्रल रेल्वे ही भारतातील एकमेव दर्जेदार वं सर्व सोयीसुविधा देणारी एकमेव झोन आहे? नाही तर आमची साऊथ सेंट्रल रेल्वे भंगार नांदेड डिव्हिजन पण सेंट्रल रेल्वे ला कधी जोडण्यात येईल देव जानो
doubling is almost done in some areas it's remaining btw jeur to washimbe , that I exactly don't know is completed or not . But electrification is at good pace actually ,it slowed down due to lack of workers . Thank you for watching ,Do Subscribe and share
When I Saw Few Months ago Kurduvadi to Mohol Was Done , Kwv To Jeur was Done Pune - Solapur Would Be Electricfied till March 2021 as per current work us going . Do Share and Subscribe the channel . thank u for Watching !
@@DesiAvgeek Ha bhai Diesel ki baat hi alag hai ,alag hi maza hota diesel power me ,jo e-loco me nahi ata . Kuch saal me diesel sirf shunting me dikhenge lag raha
Awesome video nice edited bro
Superb....kurduwadi to Latur electrification video please
No trains available in day time to shoot
I am also कुर्डूवाडी
Well done
Thank u !
Bhai ek dum kadak...information.. plz continue bro.....
Ho Nakki , Thank You .😊
Awesome Alco Sounds and those rare rail machines!
Those rare machines are rare to see
01301 udyan express announcement has been done there before its arrival
Yes, That Was Regarding the Changed Number and Composition of General to Reserved Second Sitting Coaches .
Thanks for sharing
Thank For Watching the Video , Glad that this video has reached till your Suggestions , Sir kindly share your opinion about editing and videography what improvements can be made , Kindly share this video at your level
Thank U 😊
Thank u bro from latur
Thank you for watching !
Very good
Thank u 😊👍
Great Capture Bro for given information between Daund - Solapur line section. And Bro, I hope Wadi - Daund (Via. Solapur) line section Doubling and Electrification work constructions get complete in March - April 2021. After that when electrification routes get completed then so many trains hauled with Electric loco in this route.
Bro after that Wadi - Daund (Via. Solapur) line section doubling and electrification get completed. And I want to see specially these trains like:-
1) 11301/11302 Udyan Express runs with Electric loco of WAP-7 Kalyan shed.
2) 11013/11014 Ltt Kurla - Coimbatore Express (this train from Ltt Mumbai to KSR Bengaluru City runs with Electric Loco like WAP-7 KYN/RPM/ED sheds either WAP-4 then this train loco change upto electric to diesel from KSR Bengaluru City to Coimbatore runs with Diesel Loco of WDP-4D KJM/GOC/ED sheds).
3) 12115/12116 Siddheshwar Express runs with Electric Loco likes WCAM-2, WCAM-3 and WAP-7 from Kalyan shed (But specially WCAM-2 and WCAM-3 from Kalyan shed both Electric Locos runs upto Solapur).
Bro I want to see these express trains should be runs with Electric Loco in this route soon.
Hope So Till March 2021 Electrification and Doubling is completed .👍
Bsl wap will be hauling most of trains,
Rather One E Loco shed Should be there btw Daund To Wadi at Bhigwan or Kurduvadi as there is a lot of space .
All good details friends
@@mosinshaikh2596 thank u 😊
Nice 👌 jobs
Thank u 😊
NEED audio
Yes , I Realized that after watching on TH-cam , In Further Videos there will be no Silence 😊thank u for watching !
good information.
Thank U For Watching , Do Share the video and subscribe the channel
Nice one 👍
Thank U @immanuel Rail Fans
Nice update brother, with good information.
Thanks for sharing this video
Thank u Brother ..😊
Thanks for sharing...
Thank U For Watching , Do Share and Subscribe the channel
Nice.
Thank U 😊
From Chennai.
We used to travel to Valsad via Gulbarga, Solapur and Daund. We are waiting for doubling and electrification of this line. The distance of 338 kilometres slows down our journey.
Great 👌👌
सेंट्रल रेल्वे ही भारतातील एकमेव दर्जेदार वं सर्व सोयीसुविधा देणारी एकमेव झोन आहे?
नाही तर आमची साऊथ सेंट्रल रेल्वे भंगार
नांदेड डिव्हिजन पण सेंट्रल रेल्वे ला कधी जोडण्यात येईल देव जानो
Sir solapur la electriction line kadhi purn honar
Approximately March 2021 paryant
सर भिगवन सोलापुर डबलिंग कधी होनार पूर्ण
नदी चा भाग डबलिंग राहिला आहे फक्र ,बाकी पूर्ण जालं आहे. सब्सक्राइब कारा चैनल ला ,अपडेट मिळत राहेल , जसे समजेल तसं . धनयवाद
Electrification going on at a hectic pace.Hope doubling is also being done ,parallely.
doubling is almost done in some areas it's remaining btw jeur to washimbe , that I exactly don't know is completed or not .
But electrification is at good pace actually ,it slowed down due to lack of workers .
Thank you for watching ,Do Subscribe and share
व्हिडिओ बद्दल धन्यवाद
Nice video
Still the works of electricfication is going on.
Yes But In Full Swing
@@AdityaKumbhar update about electricfication after madha
No I dont have any update about that
@@AdityaKumbhar ok
Still how much electrification work is pending? When will Pune SUP electrified.
When I Saw Few Months ago Kurduvadi to Mohol Was Done , Kwv To Jeur was Done
Pune - Solapur Would Be Electricfied till March 2021 as per current work us going .
Do Share and Subscribe the channel . thank u for Watching !
@@AdityaKumbhar electricfication works has completed till mohol
@@AdityaKumbhar completed till mohol
Pleased to hear Alco sound
Yes Alco Sound Was Great to hear ,it was There throughout the shoot ..😊
Do Share the video and Subscribe the channel
yes same here
Outstanding speedy development by modi govt.
Yes , The Work is in full pace
Aditya is it true electrification works completed till pakni?
Yes , I Have also heard about it from local peoples
This looks like American train engine
You must be talking about WDS ?
@@AdityaKumbhar ha👍
@@krishnakolhe.4994 Yes Smaller Version of American Locomotives
Miraj latur electriftion
😭😭😭😭😭😭😭😭😭😭😭😭😭
???
@@AdityaKumbhar arey bro mera fav route hai ye abhi electrified hora, will miss diesel haulers ❤️
@@DesiAvgeek Ha bhai Diesel ki baat hi alag hai ,alag hi maza hota diesel power me ,jo e-loco me nahi ata .
Kuch saal me diesel sirf shunting me dikhenge lag raha
Naveen video Patwa lavkar
nice video brother, good stable shooting and great information of all elements, hats off to your work
Thank U brother !😊
Is this in lockdown
Yes Shoot on 29 August 2020
Ohk