Pipeline Drillers - Horizontal Directional Drilling (HDD) Pull Back

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 ม.ค. 2025

ความคิดเห็น • 34

  • @100PercentOS2
    @100PercentOS2 5 ปีที่แล้ว +3

    Watching these machines in action is awesome.

    • @conradjohnathan7236
      @conradjohnathan7236 3 ปีที่แล้ว

      Sorry to be so offtopic but does anyone know a method to get back into an Instagram account..?
      I was dumb lost the password. I love any tricks you can give me!

    • @issacbentley7396
      @issacbentley7396 3 ปีที่แล้ว

      @Conrad Johnathan Instablaster ;)

  • @MrEsatria
    @MrEsatria 4 ปีที่แล้ว +2

    I really like the work that uses theology.

  • @darkpithagoras88
    @darkpithagoras88 2 ปีที่แล้ว

    I will foloow this work about 1 year..so amazing

  • @sanjaykumar-sn6ze
    @sanjaykumar-sn6ze 3 ปีที่แล้ว

    So nicely made this

  • @olegderkach
    @olegderkach 5 ปีที่แล้ว +3

    Where do I go to learn how to operate these things

  • @Hollywwwtjruilikecom
    @Hollywwwtjruilikecom ปีที่แล้ว

    Good the drilling rig. What formation there and did it use the HDD mud motor?

  • @RajeshCD
    @RajeshCD 2 ปีที่แล้ว

    Dear Pipe line Drillers, Is possible the HDD method in gravity line. example 250 m length, 1000mm dia HDPE pipe.

  • @yaqoobmagsi5486
    @yaqoobmagsi5486 2 ปีที่แล้ว

    How to copy data from 24*40 Vermeer in USB ? Just like torque , mud pressure, angle etc ?

  • @donooetomo5213
    @donooetomo5213 3 ปีที่แล้ว

    A. M. A. Z. I. N. G
    ORANG RAMBUT PIRANG
    ORANG MATA BIRU
    MEREKA SANGAT JENIUS DAN PANDAI .. MEREKA ADALAH PENEMU DAN PENCIPTA
    TERIMA-KASIH INOVASI
    TERIMA-KASIH TEKNOLOGI
    THE BEST

  • @yaqoobmagsi5486
    @yaqoobmagsi5486 2 ปีที่แล้ว

    What's is checklist of drilling ?

  • @reybornales4992
    @reybornales4992 7 ปีที่แล้ว +1

    Sir,
    Good day, I would like to ask for your help regarding of how can i design bundle pipe pulling of 3x225mm, 2x125mm and 1x32mm total of 6 pipes with a length of 200m in a depth of 20 meters. I am new in this industry and as I study the design in a book of McGraw-Hill it is only single pipe. Sir, what consideration I will do first in order to design 6 pipes in a bundle so that the design is correct and safe. Thank you so much, your help and response is most appreciated.
    Regards,
    Rey Bornales

    • @pipelinedrillers7900
      @pipelinedrillers7900  7 ปีที่แล้ว

      Thanks Rey for your enquiry regarding bundle conduit installation via HDD. This type and size is common place conduit bundle for HV cabling.
      Considerations as follows.
      1. Ground conditions:- A full Geo-Tech investigation of the site will be required. If you’re looking at a maximum depth of 20m, geo-tech bore holes should be undertaken to a depth of at least 10m below bore profile, at multiple points along the alignment, 4-5 boreholes with full report including rock cores for inspection if encountered.
      2. Bore Profile:- this will be dependent on a range of factors including; what is the reason for the crossing; Road/Creek, River, services? Also the achievable bend radius in the known ground conditions (Geo-Tech) is a major factor. If hard rock is to be encountered a 200m crossing with a maxim depth of 20m will not be achievable. You will exceed a safe working radius of the drill tooling to be applied in rock ground conditions. The depth and length might need to be considered.
      3. Conduit HDPE:- there is no problem installing bundle conduit configuration via a HDD method, however your client might have specific requirements for their cabling. I.e. (1. Bend Radius) (2. total haul ability, of cable into Bored crossing) (3. thermal resistivity) the HDPE conduit will need to be PN16 at minimum, also the 32mm should be upgraded to 90mm at minimum to ensure it can handle the install load.

  • @ATMscooters
    @ATMscooters ปีที่แล้ว

    Does anybody know the typical drill mud wastage rate? How much bentonite/mud I should need per LF of drilling? or day of operation?

    • @lb4899
      @lb4899 ปีที่แล้ว

      dry mix is ass if im honest man. go with a chemical mix they bond so much better

  • @kilayko167
    @kilayko167 4 ปีที่แล้ว +1

    Is there a hiring for driller/operator for HDD,i have a experience in drilling exploration,,soil penetration test,,water well.

  • @chino7035983285
    @chino7035983285 5 ปีที่แล้ว +1

    Como me gustaría trabajar con estas máquinas grandes yo trabajo pero con drilles pequeños

    • @100PercentOS2
      @100PercentOS2 5 ปีที่แล้ว

      ¿Vives en México?

    • @chino7035983285
      @chino7035983285 5 ปีที่แล้ว

      100PercentOS2 vivo en Virginia Beach, Virginia y trabajamos con dril pequeño una 20 20 de ditch witch

    • @marcelo6093
      @marcelo6093 5 ปีที่แล้ว

      Donde trabajas usted? Jo trabajo com uma jt25

  • @madagascar1950
    @madagascar1950 5 ปีที่แล้ว

    we are selling HHD 150 mm for fiber optic cable and have interest in above machine for future prospect...with diameter of .500 mm for utility

  • @kkengineeringtechnology
    @kkengineeringtechnology 4 ปีที่แล้ว

    Super...

  • @HariSingh-jn7th
    @HariSingh-jn7th 2 ปีที่แล้ว

    Beuteful

  • @sangwarok1862
    @sangwarok1862 3 ปีที่แล้ว +1

    our content is the same

  • @PralhadThombre-s4z
    @PralhadThombre-s4z 9 หลายเดือนก่อน

    Sir mashin chahiy please no

  • @swaminathyadav9844
    @swaminathyadav9844 ปีที่แล้ว

    Hii sir