ABB Positioner TZIDC Complete Components Configuration setting and Calibration Procedure

แชร์
ฝัง
  • เผยแพร่เมื่อ 2 ต.ค. 2024
  • Configuring and calibrating the ABB TZIDC positioner involves several steps. Here's a general outline of the process:
    #Configuration: Faisal Ahmed I&C
    Mounting: Attach the TZIDC positioner to the valve actuator according to the manufacturer's guidelines.
    Electrical Connections: Ensure proper wiring of power supply, control signals, and communication interfaces.
    #Communication: If applicable, configure communication protocols (such as HART or Profibus) between the positioner and the control system.
    Basic Settings: Set parameters such as supply voltage, fail action, and units of measurement.
    #Calibration:
    Zero Point Calibration: Adjust the positioner to the valve's #closed position (fully shut). Initiate a zero calibration to establish the closed position reference.
    Span Calibration: Adjust the positioner to the valve's fully open position. Initiate a span calibration to define the open position reference.
    Travel Calibration: Command the valve to several intermediate #positions (e.g., 25%, 50%, 75%) and verify that the positioner's feedback matches the actual valve position.
    #ABBPositioner
    #TZIDCCalibration
    #ValveConfiguration
    #ActuatorCalibration
    #PositionerSetup
    #CalibrationProcess
    #ValveControl
    #Instrumentation
    #ProcessAutomation
    #ABBIndustrialSolutions
    Linearity Check: Confirm that the positioner responds linearly to input #signals over the valve's operating range #TZIDC
    Hysteresis Check: Test the positioner's ability to consistently return to the same position when approached from different directions.
    Please note that these are general steps and the actual procedure may vary depending on the valve, actuator, and communication protocols used. Always refer to the official ABB TZIDC documentation or user manual for precise instructions tailored to your specific setup. It's also recommended to involve qualified personnel for installation, configuration, and calibration to ensure safety and accuracy

ความคิดเห็น • 14

  • @mdakbarkhan956
    @mdakbarkhan956 ปีที่แล้ว +1

    Masha Allah ...
    Faisal sir i had good knowledge

  • @ZackKhan-nj7tk
    @ZackKhan-nj7tk ปีที่แล้ว +1

    Mujhe apka video bahut pasand hai too good for and all person
    Mujhe instrument field bahut pasand mai job kar bhi raha hu
    Lekin mera degree mechanical engineering phir maine higher education M. Tech thermal engineering kiya isse koi problem hoga
    Kyuki mai instrument field mai abhi kam kar raha hu

  • @tasharufhussain1867
    @tasharufhussain1867 ปีที่แล้ว +1

    Good 👍

  • @Jawatricks0
    @Jawatricks0 ปีที่แล้ว +1

    ❤❤

  • @bilalijaz-q9e
    @bilalijaz-q9e ปีที่แล้ว

    Sir i have hart field communication module
    model ..boost MHO 0302 please sir guide how it works

  • @ZackKhan-nj7tk
    @ZackKhan-nj7tk ปีที่แล้ว +1

    Sir mechanical engineering or m. Tech thermal engineering ke student instrument field kam kar sakta hai Gulf ja sakta hai please reply
    Plc dcs hmi pid hazop inter lock p&id uld loop drawing layout calibration orientation drawing sab dekhta karta bhi phir doubt hai gulf me koi problem to nhi hoga commissioning bhi

  • @SurajSingh-wk1tk
    @SurajSingh-wk1tk ปีที่แล้ว

    Sir please make a video pneumatic and electro penumatic positioner

  • @mdakbarkhan956
    @mdakbarkhan956 ปีที่แล้ว

    Thanks sir.. You are great...

  • @chmohsinraza4749
    @chmohsinraza4749 ปีที่แล้ว

    Informative

  • @mohsinraza9944
    @mohsinraza9944 ปีที่แล้ว

    Good

  • @prabhakartiwari1111
    @prabhakartiwari1111 3 หลายเดือนก่อน

    4 -20 amp ke according control ka direction change karana to ky kare