    @Mhike7 7 ปีที่แล้ว

    We are trying to conduct a qualification for our freezer unit, however, IQ and PQ were already conducted and the results were passed base on our requirements.
    But we have not yet conducted the OQ as it is still have some items inside. Is it possible to perform the OQ in different date once the freezer empty without redoing the PQ if the result of OQ is passed?