FRI-40-010_Toy R US: Truck Edition_Education Toys (Factory Layout Example Using Sketchup Software)
มุมมอง 805 ปีที่แล้ว
This is an example of a factory layout which was made by FRI-010 .
SIKOM_Kelompok 1_TI-40-01_TSM
มุมมอง 496 ปีที่แล้ว
Kelompok 1 : Anindhita Dewi Artanti_1201164201 Arrivan Dika Santosa_1201164284 Firman Setia Nugraha_1201164010
Assembly Line Balancing largest production time heuristic
มุมมอง 1.6K6 ปีที่แล้ว
Assembly Line Balancing largest production time heuristic
Second English Assignment (1201164010)
มุมมอง 508 ปีที่แล้ว
To fulfill my english task.. Don't forget to like & subscribe..
Great job
Thanks, boss.
Does processing time means the time needed to produce an intermediate product or time needed to produce a finished goods, acounting recovery and losses?
Thank you dude
120 units in a 40 hour - week How to calculate this?
Thanks🎗
crystal clear❤
Thank you so much for the video it helped me a lot ❤ kudos to you keep it up!!!!❤
Amazing!
bang..mw tanya dari contoh di vidio, total proses time nya 390 sec per unit sepatu artinya dalam 10 jam (36000sec) waktu tersedia, PT Adidas hanya bisa menghasilkan 92 unit sepatu. Bagaimana bisa memenuhi pesanan 360 unit per 10 jam??
open na noor
I understood this very well after watching your video,,,thank u very much
daghang salamat = terimah kasih many thanks from philippines, professor! you helped me out with my thesis. you're awesome, sir!!!
are you getting it what are you saying... plzz do try something else i m sure this is not your area of interest.
great video. thank you
God bless you greatly
thank you
great teaching bro
Txn sir
thank you brother
Why u were cutting the 90 sec of idle time ?and how did u get 30 idle time for F?
36000? bukan 3600?
Hi this video helped me a lot I just want to ask questions Is it necessary to start letter "A" as ther first task by the first station or is it dependent on what letter has the longest process time? Thank you
First you have to start with the processes who doesn't have predecessor (here it is A and B), if there are multiple such processes, then choose the one with the highest process time ( here we have selected A) and then keep going.
Can I ask let think in reality. The first product will need 400 seconds cuz each station needed waiting for the precedent ones to start working. From the 2nd product, every 100 seconds there will be a product go out of the assembly line. Therefore, we cannot meet the desired output per day (Cuz 400 seconds instead of 100 seconds for the first product each day). Am I wrong?
Sangat membantu, thanks a lot!
Nice , I need ur social media accounts?
Good explanation
nice explanation
Hi, this video helped me a lot. Question, is there anytime when none of them are eligible? like say for instance, B was not eligible in station 2? is this possible?
do you mean, "is that possible that non of the processes that doesn't have any Predecessor?" In short, there will be one or two or even more processes that shouldn't have any predecessor while the rest of them are had it. It all depends on the case
@@AdiTV-r5o Thanks for your reply. I actually meant, if its possible to have a process that does have a predecessor to not have any "proses ready" or in other words a "feasible task". You know how you list the proses ready in station 2 for C. C has a proses ready of B and the only feasible task is B, what if B was not possible? Does this ever occur that there is no feasible task? I hope i explained myself good enough. Thanks for your help.
@@alin8387 If there are no feasible task, then if you learnt from "Project Management" course, that particular task/stasion (or whatever you want to call it) which has no feasible task, may occur on some condition. But in term of production planning and inventory control (PPIC), such case is rarely happened because what we try to find out here is the assembly line which is consider as the main process. so if theres any process/step which has no feasible task, wouldn't be count in this term. it depends on what are you going to do from such case. Well I'll make it easy.. the case that you've been asking, are happening in real situation, but depends on what are you trying to observe, it may be count or not.
if a process is having both machine and man time combined for example process A is having man time 5 sec and machine time 15 sec in total 20 secs , man will be waiting for the 15 sec for next process
yes, because the man could only waits when he/she are idle or not operated
Why workstation is total have taken 4
it's on the 3rd step, you must determine it by dividing the process time with cycle time. its on 05:36
3.9 is decimal number workstation can't be fraction that is why 4 is written
goooooood
very informative. thank you :)
Subs me back
done sister