LRT 1 Full Ride from Baclaran to Fernando Poe Jr Station , Manila Philippiines [4k] LRT line 1

แชร์
ฝัง
  • เผยแพร่เมื่อ 29 พ.ย. 2024

ความคิดเห็น • 2

  • @fairykaye
    @fairykaye 6 หลายเดือนก่อน +3

    I used to work there. It was operated by Meralco Transit Org., then. Oh! How i missed working there..That was 1985 when i was hired.my first station assignment was in 5th Ave. station northwest bound. So many happy and sad memories I left there.

  • @louminamilana5272
    @louminamilana5272 6 หลายเดือนก่อน +2

    LRTA CLASS 14000 CRRC SIEMENS 5TH GENERATION TRAIN
    Doors: 5
    Articulated Cars: 3 Similar To 1000 Class
    LED Destination Boards: 3
    Air Conditioning Units: 3
    LRV Fleets: 168
    Trainsets: 56
    Traction: IGBT-VVVF (SIEMENS EMU-BLE)
    Speed: 60Kph
    Bogies: 2
    Jacob Bogies: 2
    Gangways: 2
    Pantograph: 1
    Cars: 3
    Axle: 8
    Seats: 13
    Wheel Chair Sign: 2
    Handrails Doors: 16
    Handrail Ceilings: 18
    Handrail Handles: 108
    Interior Route Maps: 2
    Car Body: Stainless Steel
    Exterior Rectangle Red Lights: 10
    Interior Circle Yellow Lights: 10
    DOTR & LRTA Logos Exteriors: 4
    DOTR & LRTA Logos Front & Rear: 2
    Border Lines Color: Red
    Build At China
    Manufacturer: CRRC Siemens