Thanks for posting another video of the GNRR. I appreciate you showing all the switching work at Tate. The drone shots give me lots of modeling ideas for my layout. The shot at the end of the video with the locomotives passing by the restored Tate Depot was excellent. -Tom
Confused as to how this train had enough tracks at Tate to break it down, move the power to the other (south) end and make up another train? Just checked out the yard and there does not appear to be to be enough room?
and 421 has a great horn
Thanks for posting another video of the GNRR. I appreciate you showing all the switching work at Tate. The drone shots give me lots of modeling ideas for my layout. The shot at the end of the video with the locomotives passing by the restored Tate Depot was excellent. -Tom
I've been posting more GNRR videos.
So the white factory shown at around 7:30 is a poultry processor ? Nice filming, and really love your aerial footage.
The white factory cuts marble.
Loved the switching.
Great video. Where did the mty flats end up?
Excellent Video
🌼🌼🇮🇳🌼🌼
Confused as to how this train had enough tracks at Tate to break it down, move the power to the other (south) end and make up another train? Just checked out the yard and there does not appear to be to be enough room?
6:22 train simulator 2050 lmfao
Most enjoyable, as per.
How often does the Northeastern run
i live in the city of ball ground, GA
What did 421 used to be
Was the Tate depot moved??
Yep they moved it a couple years ago.
Horrid horn