How does pressure fit into this? If you're a diver having to go down there, you'd have to slowly drop down over a long period of time, to pressurize, and then do same coming back up. Does the oil need to be kept under certain pressures or depressurized to offset it the pressure already down there? And if so, how does that work with the fact that one end of the pipe will be above sea level where it connects with the rig, and another end will be at sea level, when it gets to land?
The job I really like I am as a welder for crc evans P625 Pipe line project in congo micoperi company seminole ship to join in One team and how can I get the address of the job please let me know Thanks regards one anchor
مرحبا انا صاحب الاختراع الأحدث والاسراع في العالم في مجال بناء خطوط النفط والغاز البحري النظام الجديد يستطيع بناء خط بطول 80 --------100كيلو متر في اليوم الواحد وقابل للتطوير اكثر
Rare video sharing is very good, thank you very much
absolutely fascinating. the time and efort it must take for 500-800+km pipelines. jeez!
Was there 1970,71, M211, M232. Early days of lay barges by Brown & Root. Tough pioneers in the day.
I'm Gorakala Kapil pipe fitter nice video
How does pressure fit into this? If you're a diver having to go down there, you'd have to slowly drop down over a long period of time, to pressurize, and then do same coming back up. Does the oil need to be kept under certain pressures or depressurized to offset it the pressure already down there? And if so, how does that work with the fact that one end of the pipe will be above sea level where it connects with the rig, and another end will be at sea level, when it gets to land?
Wow amazing, I'm fitter , I want to learn or work in this offshore or onshore, how can i? How to apply for it? Any course I have to do it for this?
If you want underwater welding training try ocean corporation in Houston texas
@@ibanrooster can't possible, because I live in India, 😅
@@ankitjoshi5101 lol tf
What are the RT procedure
Not one coded welder amongst them...
The job I really like
I am as a welder for crc evans P625 Pipe line project in congo micoperi company seminole ship to join in One team and how can I get the address of the job please let me know Thanks regards one anchor
I wouldnt work with red dots....they smell...fck that
مرحبا انا صاحب الاختراع الأحدث والاسراع في العالم في مجال بناء خطوط النفط والغاز البحري النظام الجديد يستطيع بناء خط بطول 80 --------100كيلو متر في اليوم الواحد وقابل للتطوير اكثر
that music was absolutely awful.