Project Scheduling - PERT/CPM | Finding Critical Path

แชร์
ฝัง
  • เผยแพร่เมื่อ 27 พ.ย. 2024

ความคิดเห็น • 929

  • @joshemman
    @joshemman  2 หลายเดือนก่อน

    Project Scheduling in Excel: th-cam.com/video/a1UFG1RFlFc/w-d-xo.html

  • @saptarshiboral576
    @saptarshiboral576 5 ปีที่แล้ว +478

    Mind blowing explanation. Such complex thing explained so easily in 7 mins. Thanks a lot. Saved a lot of my study time.

    • @EJA281
      @EJA281 ปีที่แล้ว

      Agree!! The video breaks things down so simple.

  • @floydheads
    @floydheads 2 ปีที่แล้ว +4

    I have watched so many videos in tears this was the only video that was able to explain this to someone like me who has no background in maths and freaks out at the sight of numbers. Thank you so much sir

  • @MrAccr0
    @MrAccr0 ปีที่แล้ว +16

    You're so clear, straight to the point, not fast talking and the graphic is very good. Thank you so much, awesome job!!!

  • @terrotech718
    @terrotech718 5 ปีที่แล้ว +134

    Damn! This is like one week of my lectures in just under 10 minutes. And guess what? I finally understand this stuff

  • @Biancalizzabeth
    @Biancalizzabeth 10 หลายเดือนก่อน +8

    This has got to be the clearest explanation on critical path ever... thank you!!!

    • @jeffballa4474
      @jeffballa4474 10 หลายเดือนก่อน

      What he said🙏🏽🙏🏽

  • @sithokozileviki3893
    @sithokozileviki3893 22 วันที่ผ่านมา +1

    I'm not even an engineer/ studying to be one but as someone who works at a COnstruction company and sometimes needs to understand all this jargon to better perform work, this video is so simplistic yet helpful! Thanks!

  • @troysgoodman7159
    @troysgoodman7159 ปีที่แล้ว +5

    I have never done project management a day in my life but now I completely understand how to determine the critical path and duration... amazingly well done! Wow!

  • @jimmymemon
    @jimmymemon 3 ปีที่แล้ว +69

    You are born to teach. So freaking concise and to the point. God Bless you Brother!!

  • @RyfernzOfficial
    @RyfernzOfficial ปีที่แล้ว +16

    Man, I hunted throughout youtube for a video that could explain this. You did it beautifully.

    • @joshemman
      @joshemman  ปีที่แล้ว +2

      Thank for dropping a note, my friend.

    • @Plookiss
      @Plookiss 7 หลายเดือนก่อน +2

      me too :D

  • @HabibiSaify
    @HabibiSaify ปีที่แล้ว +3

    Hello and courtesy was great for me
    I studied with the teacher for 3 days, but I didn't learn anything, even though I don't have good English skills, all my problems were solved by watching your video once. Thanks a Million

  • @AlixBRoy
    @AlixBRoy 9 หลายเดือนก่อน +6

    Mind blown by how clear this explanation was. Thanks!

  • @PowerBook_life
    @PowerBook_life 2 ปีที่แล้ว +3

    Really shocking seeing such a major concept explained in such a short time. Thanks a lot for the clarity.💯💯💯💯

  • @ht5_
    @ht5_ 5 ปีที่แล้ว +8

    I thought this topic was super complex but you made it very easy to understand. Wish every text book made this so easy to comprehend. Thank you!

  • @christophermensah9242
    @christophermensah9242 6 ปีที่แล้ว +11

    Great video. I am doing improvement work with my organization and you by far have the best video to help teach this topic online. Professional, detailed, and visual. Thank you.

  • @jinanb3625
    @jinanb3625 5 ปีที่แล้ว +8

    Only if you know how many times you've saved my life and gave me good marks on my finals and midterms " statistics, project, and many other classes" i've always dependent on you THANK YOU.

  • @Edeadly
    @Edeadly 4 หลายเดือนก่อน

    The amount of knowledge, in such a short time, this has is incredible 👏🏿👏🏿👏🏿

  • @impromptugenius9060
    @impromptugenius9060 4 ปีที่แล้ว +5

    Bro this may be one of the BEST videos on TH-cam. I’m starting a PM job and this just gave me a boost of confidence. THANK YOU

    • @yushaq2434
      @yushaq2434 4 ปีที่แล้ว

      God give you success in your new career. This guy is a life saver.

  • @KIANOUSHSEDDIGHPOUR-x2d
    @KIANOUSHSEDDIGHPOUR-x2d 9 หลายเดือนก่อน +1

    Such a simple concept, yet some of our so-called "Educators" fail to explain it correctly...
    You just earned a subscriber bravo!

    • @joshemman
      @joshemman  9 หลายเดือนก่อน +1

      Welcome aboard!

  • @uvuvwevwevweonyetenyevweug5116
    @uvuvwevwevweonyetenyevweug5116 2 ปีที่แล้ว +15

    Thank god I landed here in very short span of time to know what is PERT and CPM looks like. This video is so useful, informative and so easy to understand such an uneasy subject. Great work Joshua, Kudos to you

  • @victorenshorts2522
    @victorenshorts2522 3 ปีที่แล้ว

    You saved my life 2 hours before my exam today. God bless you.

  • @nadira1472
    @nadira1472 4 ปีที่แล้ว +3

    you explain this WAY better than my management lecturers. i finally understood. thank you!

  • @jowaliiwumbwe6699
    @jowaliiwumbwe6699 2 ปีที่แล้ว +1

    Am from Uganda, going for my project management assessment this week and browsed through for an explanation of this thing, u did it best dear, I can't thank you enough sir

  • @oforiwaa1
    @oforiwaa1 5 ปีที่แล้ว +8

    This is by far the most understandable explanation I have seen👌. Thank you so much!

  • @mickeywebb6850
    @mickeywebb6850 3 ปีที่แล้ว

    By far, the best tutorial on TH-cam for Critical Path. And it's only 6 mins.

  • @kofiasamoah9796
    @kofiasamoah9796 2 ปีที่แล้ว +5

    We need more of such videos. Detailed and thorough. Thank you once again.

    • @MathHandsOnwithPython
      @MathHandsOnwithPython ปีที่แล้ว

      Also, find Python solution for CPM th-cam.com/video/I6MLKMirZ2E/w-d-xo.html

  • @student90520
    @student90520 9 หลายเดือนก่อน +2

    Amazingly explained! I didnt understand my professor, even chat gpt failed to explain it and other bunch of videos were useless. But you made it so comprehensible for a person with no prior knowledge of project management. Thnk you so much

    • @joshemman
      @joshemman  9 หลายเดือนก่อน

      Glad it was helpful!

  • @samirafsan4985
    @samirafsan4985 3 ปีที่แล้ว +13

    That was the easiest yet the most effective explanation. Thank you. Truly helpful.

  • @Plookiss
    @Plookiss 7 หลายเดือนก่อน +1

    I'm studying for an exam, makes so much sense then the reading material, thank you

  • @Dumptruckxx
    @Dumptruckxx 7 ปีที่แล้ว +11

    Mr Emmanuel, your videos are fantastic. Thank you so much for putting them out.

  • @tf1266
    @tf1266 2 ปีที่แล้ว +1

    Absolutely superb. Said everything simplistically and in bite-sized portions to help us understand. Easily the best video I've seen on this topic

    • @joshemman
      @joshemman  2 ปีที่แล้ว +1

      Glad it was helpful!

  • @hadytannir9248
    @hadytannir9248 7 หลายเดือนก่อน +240

    Guess who's passing their exam tomorrow because of this video.

    • @joshemman
      @joshemman  7 หลายเดือนก่อน +14

      All the best on your exam, Hady.

    • @smoothlesst1981
      @smoothlesst1981 7 หลายเดือนก่อน +3

      I am writing today😂 hopefully 6 min is all I need to pass

    • @kadianvangogh3435
      @kadianvangogh3435 7 หลายเดือนก่อน +1

      How was it? Mine is tomorrow

    • @essieokereke6594
      @essieokereke6594 7 หลายเดือนก่อน +1

      Mine is next week.😩

    • @hadytannir9248
      @hadytannir9248 7 หลายเดือนก่อน

      @@essieokereke6594 best of luck 💜

  • @texculp67
    @texculp67 3 ปีที่แล้ว +2

    WOW!!! I've been studying Project Management forever...Joshua Emmanuel you are phenomenally well spoken and articulated this subject matter to the pinnacle of perfection, thank you so much, you have a nee subscriber for sure!!

  • @ahmprince
    @ahmprince 6 ปีที่แล้ว +62

    Thank you! Now it's time to have my midterm in an hour :D

  • @jinright695
    @jinright695 3 ปีที่แล้ว

    PROF! U JUST TEACHED ME SOME ENTIRE LECTURE IN LESS THAN 7 MINUTES
    NOW THIS IS SOME GOOD OJ MINIMIZATION

  • @arvichesterancheta8664
    @arvichesterancheta8664 4 ปีที่แล้ว +8

    I got a perfect score on my exams because of this, thanks!

  • @rudeboyrg
    @rudeboyrg ปีที่แล้ว +2

    Best explanation I've heard. Taking Udemy course and couldn't get crtitical pathways. Looked it up and had hard time until I saw this video. You are amazing.

  • @Overlord277
    @Overlord277 ปีที่แล้ว +3

    You're the man, Joshua! Thank you for helping us with another class.

  • @celinabravo8184
    @celinabravo8184 2 ปีที่แล้ว

    I was so confused in how to obtain the critical path before watching this video. Thank you very much, your explanation was extremely helpful!

  • @OlenaOlesandra
    @OlenaOlesandra 6 ปีที่แล้ว +231

    Thanx a lot for this video. It's really the best explanation on TH-cam - I wish our prof could be as good as you in teaching PM))

  • @joelguychabata2327
    @joelguychabata2327 7 หลายเดือนก่อน

    I am an old dog trying to learn new tricks. Often I get it on the second take. But your easy way of explaining had me get it right away. Thank you!

    • @joshemman
      @joshemman  7 หลายเดือนก่อน

      You're welcome, Joel. Thanks for dropping a note.

  • @syamimamani4562
    @syamimamani4562 5 ปีที่แล้ว +14

    Thank you soooo much for this!!! I have my finals starting tomorrow, and this one's coming out as my first paper 😭 the best explanation i could ever find in youtube, God bless your soul 😩🙏🙏

  • @ibrahime4925
    @ibrahime4925 3 ปีที่แล้ว

    Wow just Wow, best and most simple explanation....I have just finished half a year in construction planning and couldnt get my head around moving forward and then back to calculate slack time. After watching this I will be ready for my exam next week...Thank You!

  • @anandv21
    @anandv21 6 ปีที่แล้ว +9

    Thanks Joshua!
    This is one the shortest and the best explanation I have seen so far on youtube or anywhere else! You are a rare breed of best teachers!!

  • @alexisfryer9307
    @alexisfryer9307 2 ปีที่แล้ว +1

    Just got out of class confussed landed this first video for a better understanding..... You could not explain any better. THANK YOU!

    • @joshemman
      @joshemman  2 ปีที่แล้ว

      Great to hear! Thanks.

  • @petchx9843
    @petchx9843 3 หลายเดือนก่อน +3

    THE GOAT OUT HERE SAVING LIVES

  • @the_allucinator
    @the_allucinator 5 ปีที่แล้ว +1

    I didn't need any subtitles; your voice is clear. I didn't need any additional reading in the midst of the playback; your elaboration is clear.

  • @haydenhenderson5954
    @haydenhenderson5954 4 ปีที่แล้ว +4

    For all 3 of my supply chain tests this year you have consistently been THE best at explaining material. Can’t thank you enough.

  • @kwaaigot789
    @kwaaigot789 ปีที่แล้ว +2

    better than my lecturers Honestly.. Thank you. I understand this so much better now

  • @thangtran145
    @thangtran145 3 ปีที่แล้ว +4

    OMG, thanks a bunch. Once again, Joshua to our rescue!

  • @mokhinurmuzaffarova3453
    @mokhinurmuzaffarova3453 4 ปีที่แล้ว +1

    Thank you soo much you explained it in 7mins and everything is clear whereas my prof explained it 3 or 4 lectures without any result

  • @Zaire82
    @Zaire82 4 ปีที่แล้ว +2

    The explanation I got for this was incomprehensible, so this helps a lot.

  • @madlybs
    @madlybs ปีที่แล้ว +1

    I pulled my hair out (almost) from frustration trying to get this concept, and you explained it so well! Thank you so much!

  • @renendekwe343
    @renendekwe343 3 ปีที่แล้ว +6

    Skipping 2 weeks class for this, hoping to learn this in 7 mins from you was my best decision 😂😂😂. Thanks man!

  • @pardonfox331
    @pardonfox331 3 ปีที่แล้ว

    "I tip my hat to you Josh, you are a wizard" you made it look so easy Bro.. Thanks.

  • @hansfredericksayno8035
    @hansfredericksayno8035 2 ปีที่แล้ว +5

    You're so good at explaining these concepts. Thank you so much!

  • @arafatbaunto4068
    @arafatbaunto4068 2 ปีที่แล้ว +1

    Lucky for this new generation. Studying for them is very easy with so much free information with variety of examples and explanations in the youtube or google. Unlike before the advent of internet where students relies on the book with minimum information.

  • @asaserge9089
    @asaserge9089 3 ปีที่แล้ว +8

    Simple and straight forward, you have a thumbs up from me and I'm sharing your link to my whole class

  • @adeomotosho342
    @adeomotosho342 ปีที่แล้ว

    Watching this for a presentation this morning after 7days+ procrastination, we win again! 🎉

  • @harshradadiya3705
    @harshradadiya3705 6 ปีที่แล้ว +5

    Extremely helpful video Sir, it made the PERT look so easy and interesting. Keep making this kind of stuff...

  • @amm2900
    @amm2900 ปีที่แล้ว

    Thank you SO much for this visually aided explanation - it made so much more sense and the info sink in faster than most other videos.

  • @jennifersullivan3611
    @jennifersullivan3611 ปีที่แล้ว +3

    Very grateful for your explanation. I too was overwhelmed and lost when covering the material in class but your explanation put me on the right track. Thank Joshua!

  • @kriskaa1840
    @kriskaa1840 5 หลายเดือนก่อน +1

    Although, it doesn't seem complex anymore after watching your video I almost went crazy yesterday, because I couldn't figure it out. Thank you so much for your great explanation, I feel very confident in solving a task on this topic now!

    • @joshemman
      @joshemman  5 หลายเดือนก่อน

      Great to hear!

  • @DarrylBodkin
    @DarrylBodkin 6 ปีที่แล้ว +9

    This has been the best explanation on the topic. Thank you.

  • @meshio3060
    @meshio3060 ปีที่แล้ว +1

    Brilliant explanation, didnt think i could understand all of this in less than 7 minutes

  • @jilljoestar5925
    @jilljoestar5925 4 ปีที่แล้ว +4

    Thank you so much, sir! Really hard to understand this with only relying on modules. You're such a good news.

  • @hanarryali5793
    @hanarryali5793 2 ปีที่แล้ว

    I'm very glad that I found you. Everytime I watched your videos, it helped me to easily understand my subjects. Thank you so much!

  • @TheInnovatrixAI
    @TheInnovatrixAI 7 ปีที่แล้ว +3

    Now, I can finish my homework. Thank you so much!!!!

  • @CJR33
    @CJR33 ปีที่แล้ว +1

    most efficient explanation than any of my uni tutors, thank you

    • @joshemman
      @joshemman  ปีที่แล้ว

      Glad it helped!

  • @susmapradhan6061
    @susmapradhan6061 4 ปีที่แล้ว +8

    You just saved me from reading 40 pages and pulling my hair out. Thank you!

  • @samgicheru5805
    @samgicheru5805 5 ปีที่แล้ว +2

    I owe you a cup of tea,,,,,,cant get any better explanation than this

  • @Mabryova
    @Mabryova 5 ปีที่แล้ว +4

    Thank you so much for this extremely helpful, simple and clear explanatory video. If I could I would give you a hug!

  • @upperna1978
    @upperna1978 18 วันที่ผ่านมา

    By far the best video for understanding CPM clearly!

  • @jksbeautician4607
    @jksbeautician4607 2 ปีที่แล้ว +2

    My professor played this is my Business informatics class today.

  • @jamesrenfro3852
    @jamesrenfro3852 11 หลายเดือนก่อน +1

    Hey Josh man I really want to thank you for this explanation I mean dude I have been trying to understand this concept for oh my God years and it seems as though in less than seven minutes, you clearly showed me how to do this in a simplistic way and I got it on the first chance. Boy you are amazing. Keep it up dude.

    • @joshemman
      @joshemman  11 หลายเดือนก่อน

      You're very welcome, James.

  • @ecoman003
    @ecoman003 4 หลายเดือนก่อน +10

    Exam in one hour guys😂

    • @mambwemusonda7427
      @mambwemusonda7427 8 วันที่ผ่านมา

      How tf did you know?😂😂😂😂

  • @Shahid4real
    @Shahid4real ปีที่แล้ว +1

    Really well explained. I was stressing about how will I understand CPM calculations but this video cleared my concept. Thank You.

  • @bhuvan-cc9fq
    @bhuvan-cc9fq หลายเดือนก่อน +3

    5 mins before exam 💀

  • @kevinboghani272
    @kevinboghani272 2 ปีที่แล้ว

    Made it way too simple, literally the best explanation I found on YT

  • @noobmaster4986
    @noobmaster4986 11 หลายเดือนก่อน +3

    no trash, on point

  • @mxolisizwane9072
    @mxolisizwane9072 ปีที่แล้ว +2

    Beautiful one my brother .... wish I had this some 30 years ago doing Applied Maths at University. Nice and quick revision for my PMP. Thanks!

  • @ryanlimes1499
    @ryanlimes1499 6 ปีที่แล้ว +3

    Jesus Christ this is greek to me, it feels like learning c omputer language

  • @karabomohlala7257
    @karabomohlala7257 3 ปีที่แล้ว +1

    This guy is a legend no ways all the videos of him have been nothing buh helpful I stan

  • @belguithzied3857
    @belguithzied3857 5 ปีที่แล้ว +2

    thank you for this video, i have lost one hour in reading the course and i don't undersatnd anything

  • @kablanamon8601
    @kablanamon8601 4 ปีที่แล้ว

    Little note to anyone. Even if you start on day/week 1 instead of 0, it still works. thanks Josh!

  • @abisolaadekunle2837
    @abisolaadekunle2837 ปีที่แล้ว +1

    This is so good
    Watching it in 2023, and it really helped my assignment
    Thank you Emmanuel

    • @joshemman
      @joshemman  ปีที่แล้ว

      My pleasure, Abisola.

  • @nahjaenunes6863
    @nahjaenunes6863 5 ปีที่แล้ว +2

    Stellar video! Remarkably helpful. I don't usually comment on videos, but for this, I had to make a deserving exception. Keep up the good work!

  • @DacePixels
    @DacePixels 5 หลายเดือนก่อน

    Thank you very much, this is the best CPM video I have ever watched. God bless you!

  • @Patrick-wd9xi
    @Patrick-wd9xi ปีที่แล้ว

    Thank you very much my awesome lecturer!Your videos help me a lot as forest engineer student because often I face with complicated modules while due to your explanations I understand it easily.

    • @joshemman
      @joshemman  ปีที่แล้ว

      My pleasure, Patrick. Thank you!

  • @sahinsarrafi1459
    @sahinsarrafi1459 4 ปีที่แล้ว +1

    It is the best explanation without any suspicion!

  • @emj0301
    @emj0301 3 ปีที่แล้ว

    I have been asking so many questions with our instructor about this, but only your video explain very well, in a manner were it is just like, 1+1=2! Kudos to you bro!!

  • @EM-wg6vw
    @EM-wg6vw 6 ปีที่แล้ว

    Joshua's explanation is simple and easy to follow.

  • @mabilmajokmajok9481
    @mabilmajokmajok9481 4 ปีที่แล้ว +1

    The best explanation for constructing a project network. Very helpful. Thank you so very much.

  • @zinhtet7172
    @zinhtet7172 3 ปีที่แล้ว +1

    Thanks, Joshua! I was struggling to understand the Critical path, your video is straightforward, I appreciate it.

    • @khurmiview
      @khurmiview 3 ปีที่แล้ว

      Same here. Under 10 mins I could understand what was taught for three weeks.... Where are you from?

  • @ragas2845
    @ragas2845 2 ปีที่แล้ว +2

    Amazing explanation bro! If only professors taught like you in the university. You have an excellent prospect to be an amazing teacher. Believe you me!

    • @joshemman
      @joshemman  2 ปีที่แล้ว +1

      I appreciate that!

    • @HRnotary
      @HRnotary 2 ปีที่แล้ว

      Yes, they rush things in University.

  • @alialfifi2884
    @alialfifi2884 2 ปีที่แล้ว

    Best and easiest way to explain such complicated subject,thank you brother . Wish that professors see this Vedio before they explain this subject to students.

  • @shepherdruzive4070
    @shepherdruzive4070 3 ปีที่แล้ว

    What an explicit video. You are an academic hero

  • @stephaniem8532
    @stephaniem8532 7 หลายเดือนก่อน +1

    This was a great video! Fast and easy way to understand this. I take my test Sunday and k know this will be why I get the question right! Thank u

  • @vaguelyelena
    @vaguelyelena หลายเดือนก่อน +2

    Thank youuuuuuuuu. I literally was getting so lost in class. It just wasn't making sense. I finally get it.

    • @joshemman
      @joshemman  หลายเดือนก่อน

      Glad it helped. 🙏

  • @AryanFelix
    @AryanFelix 4 ปีที่แล้ว +1

    You taught in 7 minutes what my Professor couldn't in 7 days. You're a god send. Keep up the good work!