Mumbai Metro Letest Update/ Yellow Line 2b New Update OCTOBER 2024 (📍 MUMBAI)

แชร์
ฝัง
  • เผยแพร่เมื่อ 24 ธ.ค. 2024

ความคิดเห็น • 28

  • @devamjani8041
    @devamjani8041 2 หลายเดือนก่อน +12

    UP builds 2-3 metros in the same time frame as we build one. We really need to pick up pace.

    • @Adi-oc2hd
      @Adi-oc2hd 2 หลายเดือนก่อน +2

      Give the authority to UPMRC for future rail corridors..they are much more efficient than even DMRC

    • @ayushgarg7033
      @ayushgarg7033 2 หลายเดือนก่อน +4

      UP cant be compared with mumbai

    • @AnandSingh-tf8zc
      @AnandSingh-tf8zc หลายเดือนก่อน

      Yes, Uttar Pradesh is so fast in building Metro in their famous city like
      Lucknow Metro
      Kanpur Metro
      Agra Metro
      Noida Metro
      Bareily Metro...
      etc in full speed...

    • @ayushgarg7033
      @ayushgarg7033 หลายเดือนก่อน

      @ all are useless, just see what happened to Jaipur metro

    • @devamjani8041
      @devamjani8041 หลายเดือนก่อน

      @ayushgarg7033 Jaipur is in Rajasthan. And is one of only very few which have struggled to make a profit.

  • @AmolNaik-mm7uw
    @AmolNaik-mm7uw 2 หลายเดือนก่อน +5

    Nice work. Please update entire 2B metro line.

  • @satishkumarnair9781
    @satishkumarnair9781 2 หลายเดือนก่อน +17

    There is not a serious construction happening in2B line. Not a single station will be ready in 2 years. So slow work.

    • @vedantsingh6624
      @vedantsingh6624 2 หลายเดือนก่อน +6

      Dost , Covid and Uddhav fucked up the completely fucked the timeline. During Eknath Shinde’s tenure I have seen that a lot of construction took place for this Metro as I live nearby. But yes , I agree it feels this taking forever. I hope finish it soon .

    • @saaamaak
      @saaamaak 2 หลายเดือนก่อน +1

      Funds must be over

    • @jamesgeorge777
      @jamesgeorge777 2 หลายเดือนก่อน +2

      Sharing this for your information:
      This coverage of Mumbai Metro Line 2B is towards the opposite end of the line. Major work is happening on the other side (Chembur to Mandale Depot). Mandale Depot is a giant double decker depot that will hold and store metro coaches of Line 2A, Line 2B, Line 4 and Line 6 (until Line 4 and Line 6 depots are constructed). Mandale Depot is one of the largest metro 🚇 depots where metro trains will be parked and serviced on two levels - ground floor and first floor. Massive construction is happening at the double decker depot since 2 years. The Mandale Depot will be ready by March to April 2025.
      The Metro Line 2B section from Diamond Garden (Diamond Nagar) in Chembur to Mankhurd Metro station and Mandale metro station will be the first Phase of Line 2B to be inaugurated in 2025. This means trains will start from Mandale Depot and travel to Diamond Metro and return back to the Depot in Phase 1. 5 stations are being finished for the Phase 1 (Diamond Garden to Mandale Depot).
      Phase 2 will be Chembur Metro Station to MTNL (shown above in this video). Phase 2 was delayed because shops and buildings in Kurla that were supposed to be demolished got delayed in court matters for several years. The shops and buildings have now been demolished. So work has proceeded for Phase 2 of Line 2B. Phase 2 will be ready by beginning of 2026.
      Phase 3 will be MTNL metro station to D.N. Nagar metro station (Line 2A). Phase 3 will be ready by end of 2026.
      If you want to know the progress of Mumbai Metro Line 2B, go and visit the section from Diamond Garden Metro in Chembur to the Mankhurd Metro station and Mandale Depot. They are setting up station roofs and electric pole lines for that entire section. Internal work and finishing work contracts of all the 5 metro stations of Phase 1 has been given and work is happening at high speed there along with work inside the 2B Mandale Depot. Station escalators are being ordered, yellow 🟡 colour roofing sheets are being trucked and they are constructing the connectors to the staircases and elevators on both sides of the road for these 5 metro stations. These 5 stations from Diamond Garden to Mandale Depot were to be inaugurated by November 2024 but it was postponed to May 2025 because of tendering issues earlier in 2023 and contractors who were replaced in 2023 for delaying work across Line 2B. New contractors were assigned to complete the unfinished and all incomplete works of Line 2B since the end of 2023.

    • @SshivamKhopkar
      @SshivamKhopkar หลายเดือนก่อน

      Dude! Go check news. They have imposed fine 1.5 crore​ on the contractor! Dont give covid and political reasons! Both of them are over long time back! come to the present stop living in the past! @@vedantsingh6624

    • @l.k.editzzz6164
      @l.k.editzzz6164 หลายเดือนก่อน

      Thank you so much bro for this info. I would like to know more about this?? ​@@jamesgeorge777

  • @indianscience5858
    @indianscience5858 2 หลายเดือนก่อน +3

    Voh last wala station Garodia Nagar station hai on line 4. Voh Bandra nahi hai

  • @ARVINDJAISWAL10
    @ARVINDJAISWAL10 2 หลายเดือนก่อน +4

    Ugliest thing will be overhead mesh of wires. They should have used third rail instead of overhead catenary.😮

  • @anillattu5090
    @anillattu5090 2 หลายเดือนก่อน +2

    Nice information.
    But give information of all 23 km line.

  • @rahulp7313
    @rahulp7313 2 หลายเดือนก่อน +2

    Abhi se pillars paint karne ki kkya zarurat hain line ko shuru hone me 2026-27 chala jayega 😂

  • @ExploreOnFootpathYoutube
    @ExploreOnFootpathYoutube 2 หลายเดือนก่อน +1

    Thank you for 48 subscribers 🫶✨🌻

  • @prasadjoshi7373
    @prasadjoshi7373 2 หลายเดือนก่อน +1

    Thank you

  • @darsheelpatel872
    @darsheelpatel872 2 หลายเดือนก่อน +1

    last clip Chembur West ka hain not Bandra ka

  • @rohitparab464
    @rohitparab464 2 หลายเดือนก่อน +2

    2050 tak ye line chalu nahi hogi. Bandra west to east, sclr, kurla west to east, thakkar bappa, swastik park
    Ye sab cross over baki hai.
    2018 me kam chalu hua.
    Par bahut hi jyada slow hai

  • @tejassoni4619
    @tejassoni4619 2 หลายเดือนก่อน +1

    Kab chalu hogi

  • @chandreshchhaya6229
    @chandreshchhaya6229 2 หลายเดือนก่อน +2

    5 saal aur lagenge

  • @AllInOne-bv1ti
    @AllInOne-bv1ti 2 หลายเดือนก่อน +2

    The construction of metro is too costly and time consuming. Mumbai metro ka kam pichle 10 saal se chal raha hai still only 20 percent complete

  • @Deepak1233-c3t
    @Deepak1233-c3t 2 หลายเดือนก่อน +1

    Agar yellow line hai toh pillar ke colour yellow hoge kya..........?