Awesome Heavy Construction Mining Equipment in Action Building Road for Haul Trucks With Bulldozer

แชร์
ฝัง
  • เผยแพร่เมื่อ 1 ธ.ค. 2024

ความคิดเห็น •

  • @HeavyMiningEquipment
    @HeavyMiningEquipment  หลายเดือนก่อน +3

    If you love big construction machines, feel free to check out this mega 3-hour video: th-cam.com/video/4erXMtRaw_8/w-d-xo.html

  • @tonchettv4201
    @tonchettv4201 26 วันที่ผ่านมา +2

    Wow ❤ Nice video💪💪🤗

  • @RoboticMachinery
    @RoboticMachinery 14 วันที่ผ่านมา

    From the robust design to the precision performance, each piece of equipment is a testament to the highest level of technology.

  • @Timbertimetv
    @Timbertimetv หลายเดือนก่อน +2

    Wow, the precision and power of that bulldozer is incredible! It’s fascinating to see heavy machinery in action like this - makes you appreciate all the work that goes into building roads for these massive haul trucks. Anyone else blown away by the coordination here?

    • @HeavyMiningEquipment
      @HeavyMiningEquipment  หลายเดือนก่อน +1

      I must say, the guy in the bulldozer is a professional, and the guy in the grader is a master class operator!

    • @mireillechauvin
      @mireillechauvin 29 วันที่ผ่านมา

      😅😊

  • @ivankojicic5882
    @ivankojicic5882 หลายเดือนก่อน +2

    Alal vera majstori nema bolji od vas.

  • @channel-ge7gs
    @channel-ge7gs หลายเดือนก่อน +1

    เป็นงานที่ดีนะครับ

  • @johnnymurff4137
    @johnnymurff4137 หลายเดือนก่อน +2

    Awesome video awesome more please and Longer

    • @HeavyMiningEquipment
      @HeavyMiningEquipment  หลายเดือนก่อน +1

      Thanks, Johny! It’ll be up in the coming days.

    • @miningequipment64
      @miningequipment64 หลายเดือนก่อน

      ​@@HeavyMiningEquipment How long duration does he need? 🤷🏽‍♂️

  • @lewiemcneely9143
    @lewiemcneely9143 หลายเดือนก่อน +1

    There goes the poor old guy on the dozer and there you sit with a grader. When I got used to that 8 I could blade a haul road like the old Cat 12 could. Just the tracks were different. Got to do it every evening at quitting time bringing everything in to fuel up. But at the quarry the only thing the 6 hi-trak did was push the o.s. pile. I did the rest with the 980, the 115 or the 120 grader but mostly the 980. Cleaning out settling ponds and smoothing up. So help that poor old guy and CHEERS!

    • @HeavyMiningEquipment
      @HeavyMiningEquipment  หลายเดือนก่อน

      Haha, cheers to you Lewie!

    • @lewiemcneely9143
      @lewiemcneely9143 หลายเดือนก่อน +1

      @@HeavyMiningEquipment Now smooth it all out but the dozer guy is doing a good job. Be careful he don't start doing yours!

    • @HeavyMiningEquipment
      @HeavyMiningEquipment  หลายเดือนก่อน

      @lewiemcneely9143 That's what I'm afraid of; he's slowly taking my job.

    • @lewiemcneely9143
      @lewiemcneely9143 หลายเดือนก่อน

      @@HeavyMiningEquipment Well, he's right good at it! He'll get back to rooting boulders before too long and it'll be your deal again. Graders always have their own spot eventually.

  • @slavisavelickovic1170
    @slavisavelickovic1170 หลายเดือนก่อน +4

    Lepo😂

  • @Nick-nw6zg
    @Nick-nw6zg หลายเดือนก่อน +2

    Hey, tell that dozer operator to leave some work for you 😂😂 that guy has skills

    • @HeavyMiningEquipment
      @HeavyMiningEquipment  หลายเดือนก่อน

      He mostly does the whole work; all that's left for me is to do the final touch. 😀