SMRT C151 [021/022]: Jurong East - Marina South Pier
ฝัง
- เผยแพร่เมื่อ 5 พ.ย. 2020
- [North South Line - 33rd anniversary, Full Journey]
Train: Kawasaki Heavy Industries C151
Trainset: 021/022
Line: SMRT North South Line
Stretch: (4) NS1EW24 Jurong East to NS28 Marina South Pier (5)
Terminus: (5) NS28 Marina South Pier
To all train enthusiasts and Singaporeans watching this special video:
The Kawasaki Heavy Industries C151 trains , started operation on 07 November 1987 with 66 trains being procured for the North South and East West Lines. It was carried out with mid-life refurbishment between 2004 [the year I was born] and 2008 [the year where the fleet was fully refurbished while 075/076 was the last to be refurbished and went into service in January 2009] and continued operations for more than a decade and about two to four years. Currently there are six of these trains that equipped with the PMSM traction motor by Tosbiha and started operations in July 2015 , it was scheduled to be equipped on the second generation - the Siemens C651 trains during their refurbishment [started in 2015] which was scheduled to complete in 2018 but refurbishment for the C651 trains was cancelled in September 2018. Two years after the cancellation of C651 refurbishment , on 22 June 2020 , decommission of the first generation C151 trains has started beginning with - set 045/046. The fleet of 66 first generation trains will be progreesively retired and replaced by a new fleet of Bombardier Movia CR151 trains which will also replace the second generation C651 [which also started decommisioning on 06 September 2020 beginning with set 203/204] and the third generation C751B [which the fleet has currently serveral trainsets seems to be taken out of service] trains. Happy 33rd anniversary to the C151 trains , may these trains hopes to continue serving the North South / East West and Changi Airport Extension Lines daily until their retirement.
I prefer the c151 on both ewl and nsl
53:20 Arroating Ang MO Kio-Bishan-Braddell-Toa Payoh-Novena
Is the train passby look like c151b?
Seriously,no door closing announcement?
Nice video :) why sometimes the train moving slow?
👍
can u do a circle line From Harbourfront to Dhoby Ghaut full journey taking C830C? without the tunnel view?
Choa Chu Kang: Change at this station from the Bukit Panjang LRT
Woodlands: Change at this station for the Thomson East Coast Line
Bishan: Change at this station for the Circle Line
Newton: Change at this station for the Downtown Line
Dhoby Ghaut: CHange at this station for the Circle Line or North East Line
City Hall: Cross over to Platform D for Eastbound train service towards Bugis, Pasir Ris and Changi Airport
Raffles Place: Cross over to Platform C for Westbound train service towards Tanjong Pagar, Jurong East and Tuas Link
Marina Bay: Change at this station for the Circle Line
Marina South Pier: This train service ends here, all passengers please alight, thank you for travelling with SMRT
hmm you miss
yew tee, kranji, marsiling, admiralty, sembawang, canberra, yishun, khatib, yio chu kang, ang mo kio, toa payos, novena, orchard, somerset, that all you miss
53:20 Ground Level→Underground
Its morning now?
Why c151 door sticker have a wrong side
What wrong side
C151 noise at 1:31
C151 happy birthday but 2022 retire