hi, in this septic tank you have not provided projection at the base slab as shown in the video of design of water tank. also, when the tank depth is more than the length it does not behave as retaining wall then how to analyze the tank.
Why free board is 300mm... What should be the minimum free board for a septic tank...due to drainage I have to minimise the free board.. please suggest
hi, in this septic tank you have not provided projection at the base slab as shown in the video of design of water tank.
also, when the tank depth is more than the length it does not behave as retaining wall then how to analyze the tank.
Very well and patiently explained, quoted the IS code as well
Beautifully explained thanks 😊
Can I see a link where you designed for those structures
How do you size a dosing chamber/lift station?
Why free board is 300mm... What should be the minimum free board for a septic tank...due to drainage I have to minimise the free board.. please suggest
300 mm is mandatory as per IS code
@@pankajnagalia8685 sir mene to bana liya aap itne din baad bol rhe hain
Should we need to fill water on both partitions before use.???
Its get filled from sanitary waste of the house. After some level gets filled, it automatically moves to other compartment due to opening in between.
hi............ what sould be opening levels if septic tank has 3 partitions
@@SaleemaPanda1990
Mam, Which pen tab did you use here?