Installing Transmission Line Poles

แชร์
ฝัง
  • เผยแพร่เมื่อ 15 เม.ย. 2024
  • A construction firm was tasked with erecting four 250-foot-tall high-voltage power line poles near a highway and train tracks. They used a heavy-duty crane and Alpha Platforms to lift and bolt together three tower sections, while ensuring the safety of the installation crew. The project was particularly time-sensitive due to the work done close to the train tracks. The process required precise coordination and a meticulous approach to ensure stability and safety while working with the crane.
    Learn more about how two professionals working in unison allowed the project to be completed in just 3 days.