  • @sembhi.91
    @sembhi.91 4 ปีที่แล้ว +1

    Thanx bro for LA positioning
    Ma apne rooftop pe 5 kW k setup LGA reha hu to iske poora dheyan rakhuga , apki doom wali bat pehli bar pta lgi .
    Thanx bro apki hr vedio bahut informative hoti hai
    Prmatma tenu chardi kallah ch rakhe .

  • @manthanthakkar3951
    @manthanthakkar3951 4 ปีที่แล้ว +8

    Can you mention LA cable sizing with this video than it would be more Informative Video. Thank for your efforts. Doing great job.

  • @ask1889
    @ask1889 4 ปีที่แล้ว +3

    Thank you... Very knowledgeable video..you are doing great great towards sustainable world..Keep it up .

  • @nikhilkasar6320
    @nikhilkasar6320 4 ปีที่แล้ว +2

    Thank you bhai for this valuable info also as i said how to calculated earthings for solar pv plant and how meany earthing electrodea need to use which guage and size earthing strip use all about this make one vedio it will very helpfull
    Thank you 🙏

  • @nageshk9100
    @nageshk9100 4 ปีที่แล้ว +4

    Nice information BRO...keep om going regarding every aspect of solar power plant ....

  • @Solarismypassion
    @Solarismypassion 4 ปีที่แล้ว +1

    Very good 👍

  • @imtiazali4777
    @imtiazali4777 7 หลายเดือนก่อน

    Excellent ❤❤❤ Zinda bad

  • @chetankumarsingh1721
    @chetankumarsingh1721 3 ปีที่แล้ว

    Best explanation bhai Maja Aa Gaya

  • @PremSingh-wx3te
    @PremSingh-wx3te 4 ปีที่แล้ว +1

    Highly knowledgeable video.great work

  • @SumitVerma-vq6xs
    @SumitVerma-vq6xs 4 ปีที่แล้ว +1

    So informative video. Thank u so much for providing valuable knowledge.

  • @vikasgajjar4077
    @vikasgajjar4077 4 ปีที่แล้ว

    Really good one sir!! you will be new clone for technology and natural resources-engineering for renewable energy & resources.

  • @factsabout3037
    @factsabout3037 3 ปีที่แล้ว +1

    Thanks sir

  • @nitinbonakruti7204
    @nitinbonakruti7204 4 ปีที่แล้ว +1

    Good going sir very informative video

  • @RahulKumar-xh6kn
    @RahulKumar-xh6kn 4 ปีที่แล้ว +2

    @ 17.25 sorry to interrupt you sir but LA height should be 5m from the highest point(min 2 m to product specifications) of installed system not just only from ground.
    Height is taken from the highest installed system, it may be module over MMS.

  • @digitalplatform7911
    @digitalplatform7911 4 ปีที่แล้ว +1

    Thanks for posting this video
    @mithun

  • @css1658
    @css1658 3 ปีที่แล้ว +1

    Thank u so much sir

  • @mohamedsafwan6198
    @mohamedsafwan6198 2 ปีที่แล้ว

    Thanks......

  • @najmuddin123456
    @najmuddin123456 4 ปีที่แล้ว +1

    Very nice

  • @gautamshere8029
    @gautamshere8029 4 ปีที่แล้ว

    Very thanks sir for important information

  • @asadseraj503
    @asadseraj503 3 ปีที่แล้ว

    Too good that’s great keep it app ❤️❤️👍

  • @DebjitDas93
    @DebjitDas93 4 ปีที่แล้ว +1

    Excellent content.

  • @surajgusain7042
    @surajgusain7042 4 ปีที่แล้ว +1

    Thanku sir ji
    Nice video

  • @solarandwindenergy
    @solarandwindenergy 4 ปีที่แล้ว +1

    Very nice sir

  • @zeshanyounis4212
    @zeshanyounis4212 4 ปีที่แล้ว +1

    good information. brother please make a video on how to create new .ond or pan file in pvsyst software.

  • @Rajpalpooja
    @Rajpalpooja 4 ปีที่แล้ว +1

    Nice information 👍

  • @ask1889
    @ask1889 4 ปีที่แล้ว +2

    Please also make videos on ACDB, DCDB & Protection devices like MCCB, SPD, Fuses, Busbar etc.
    Thanks in Advance

  • @adeelqaiser8071
    @adeelqaiser8071 3 ปีที่แล้ว

    Good information dear keep it up...!

  • @Minute-cj2pv
    @Minute-cj2pv 4 ปีที่แล้ว +1

    NICE 👍

  • @mknewsnation
    @mknewsnation 4 ปีที่แล้ว

    THANKS FOR SHARING SIR 🙏🙏

  • @neerajagarwal5471
    @neerajagarwal5471 4 ปีที่แล้ว +1

    Nice😊

  • @senilramani
    @senilramani 4 ปีที่แล้ว +1

    As per NFC code No protection
    provided against fire, electronic failure, Step Voltage, touch Voltage and EMC with ESE.
    As per IEC 62305 above all requirement are comfirm with Conventional Type air Termination Rod.

    • @SustainableEveryDay
      @SustainableEveryDay  4 ปีที่แล้ว +1

      Thanks for the valuable input Senil

    • @itsmywindow
      @itsmywindow 4 ปีที่แล้ว

      What is the relevant code for LA?

    • @itsmywindow
      @itsmywindow 4 ปีที่แล้ว

      Especially, What is the code for selection of LA?

  • @charantejavss
    @charantejavss 4 ปีที่แล้ว

    bro, please make a video on how to select ACDB, DCDB, selection of MCB in ACDB. and plase provide any material for complete knowledge on design ofSOLAR ENERGY

  • @rajendrapagare4948
    @rajendrapagare4948 2 ปีที่แล้ว

    Sir 50kw me LA kon sa lagana chahiye

  • @shankarbasavaiah6776
    @shankarbasavaiah6776 3 ปีที่แล้ว

    How much it cost for 4 storied building, is it necessary to keep LA rod in the centre of the building if solar panels are present, because top of the building is at the other end ( staircase room)

  • @dineshmehta3688
    @dineshmehta3688 2 ปีที่แล้ว

    LA cu,Road size L 1.5 mtr, × thicnes 25 mm, & L A connected to 25×3 mm G.I. strip up to la to earthing pit

  • @Anwarali-zj1qh
    @Anwarali-zj1qh 4 ปีที่แล้ว +1

    Solar panel ke pass LA rod lagaye baadme jo bizli hai vo niche giregi ya kidar giregi ..please information diyo sir

  • @batistafrose6009
    @batistafrose6009 3 ปีที่แล้ว

    Sir Nice video which( L A) is Better sir for Rcc Building.

  • @baljeet9892
    @baljeet9892 4 ปีที่แล้ว

    LA Strip 25×3 MM Insulate With Wall Mandatory or Not.Minimum Conductor(Flexible) size in sq mm for Structure & Inverter Earthing.Please Reply Both Questions.

  • @parmeshwarkokate957
    @parmeshwarkokate957 3 ปีที่แล้ว

    Please send me LA redious protection selection formula.
    And calculation discription.

  • @EngrJawwadSadiq
    @EngrJawwadSadiq 4 ปีที่แล้ว +1

    Do you have video how to install SPD for small system at home like 5kw ?if had please share link.

  • @tusharbhakare2396
    @tusharbhakare2396 4 ปีที่แล้ว +1

    LA cable pe video banao sir tnx

  • @vishal-ln5xe
    @vishal-ln5xe 4 ปีที่แล้ว

    Sir,how type of shape protection provde An ESE LA,which means its cover a Cone type shape or cylendrical shape or Egg type shape.

    • @SustainableEveryDay
      @SustainableEveryDay  4 ปีที่แล้ว +1

      Any shape is ok , just check the catalogue for its protection range based on its design

  • @infosolartechindia1498
    @infosolartechindia1498 3 ปีที่แล้ว +1

    If my solar panel is of 4m height , having 10m radius of roof then can I use 2m height LA

  • @abuzarbanderkar5190
    @abuzarbanderkar5190 4 ปีที่แล้ว

    Himanshu,which app u have usedrwriting?
    And did u used graphics tablet for writing on scree?

  • @digvijaysingh124
    @digvijaysingh124 3 ปีที่แล้ว

    Sir, as you told, if the lightning falls, then we can save our solar system by light arrester, but there is one more problem that how to save the solar system from hailstone

  • @jspreet_j5481
    @jspreet_j5481 3 ปีที่แล้ว +1

    Sir, from where i cn get these type of lightning arresters

  • @Ashishyadav-iv6un
    @Ashishyadav-iv6un 4 ปีที่แล้ว

    Is it necessary to install a lightning arrestor if we are surrounded by more taller buildings and mobile tower than us?

    • @SustainableEveryDay
      @SustainableEveryDay  4 ปีที่แล้ว

      No not necessary if tall buildings are there in 50m dia

  • @mukeshnishad1272
    @mukeshnishad1272 3 ปีที่แล้ว

    Does Sir Lighting Arrester Attract Lighting?
    Please sir answer me

    • @SustainableEveryDay
      @SustainableEveryDay  3 ปีที่แล้ว

      No it doesn't attract light , it offers low resistance path for lighting strike

  • @roshanaykhan3337
    @roshanaykhan3337 ปีที่แล้ว

    Description mn ye document nhn mil ra download krny k lye

  • @SuperJohnelton
    @SuperJohnelton 4 ปีที่แล้ว

    As per national building code (NBC) they have banded ESE type LA.
    We are using angle terminal rods nowadays.
    www.dehn-international.com/store/p/en-DE/F14661/angled-air-termination-tips

  • @dineshmehta3688
    @dineshmehta3688 2 ปีที่แล้ว

    Two three day lifhtining strik heppen near my building on solar plant L A. Strik gon down to earth by LA but sum electric instolation fail why this is heppen i have strik video, dinesh mehta mumbai borivali( i cheq in thet building but i cant.haw to buent sum thing)

    • @SustainableEveryDay
      @SustainableEveryDay  2 ปีที่แล้ว

      I sir unable to understand your case can you share some more data on ly linkdin

  • @paragairtel
    @paragairtel 4 ปีที่แล้ว

    Nfc17-102 1995 is old standard now it has been revised and this brand of LA is not proper tested as per nfc17-102 2011

  • @baljeet9892
    @baljeet9892 4 ปีที่แล้ว

    Minimum Size Of Down Conductor In Sq MM (Flexible Green Cable) For Conventional Ligtening Arrester Spike Type.Please Reply Fast.

    • @SustainableEveryDay
      @SustainableEveryDay  4 ปีที่แล้ว +1

      16sqmm but still not recommended , always use GI strip 25x3 mm

    • @baljeet9892
      @baljeet9892 4 ปีที่แล้ว

      @@SustainableEveryDay And Also Below 10 Kw & 10KW LA Is Mandatory or Not In India.

  • @ask1889
    @ask1889 4 ปีที่แล้ว +1

    What about earthing conductor size and no of earthing pits for LA ??

    • @SustainableEveryDay
      @SustainableEveryDay  4 ปีที่แล้ว

      Hi Ajay , regarding different types of earthing techniques I am making separate videos

    • @ask1889
      @ask1889 4 ปีที่แล้ว +1

      What will be the earthing wire or strip size for LA

    • @SustainableEveryDay
      @SustainableEveryDay  4 ปีที่แล้ว

      It will depend on the fault current value of the system , already I have made a video on it th-cam.com/video/bIe9KNiG7X4/w-d-xo.html

  • @abbasranala
    @abbasranala 4 ปีที่แล้ว

    namaste.sir.med.in.india.top.1o.penal.konse.he.sir?

  • @sembhi.91
    @sembhi.91 4 ปีที่แล้ว +1

    CK

  • @sunilteli6268
    @sunilteli6268 4 ปีที่แล้ว +1

    thanks sir ji