First Drive on New Silk Board Double Decker Flyover | All you need to know about this elevated road

แชร์
ฝัง
  • เผยแพร่เมื่อ 5 ก.ค. 2024
  • Double decker flyover Bangalore | Silk board flyover | Silk board flyover plan | Silk board flyover opening date | yellow line metro | Ragigudda to Silk board flyover Silk Board junction traffic | Silk Board flyover | Double decker flyover | Yellow line metro | Ragigudda metro station | Silk Board to Electronic city | HSR Layout traffic | Namma Metro
    The long awaited metro cum elevated road which aims to cut down traffic jams at the Silk Board junction in Bengaluru is finally ready for inauguration.
    DH gets exclusive access to drive from Ragigudda to Silk Board, before the flyover is open to the public.
    Will this new double decker flyover make the commute to Electronic City easier? Will it reduce the traffic snarls?
    DH’s Udbhavi has all the details. Watch the video to find out more about this new flyover.
    #silkboard #nammametro #flyover #traffic #trafficjam #yellowline #electronicity #hsrlayout #btmlayout
    ------------
    Liked the video? Tell us how we are doing in the comments section and don't forget to subscribe to our channel.
    Hit the Bell icon & never miss a video from Deccan Herald.
    For latest news, views & analysis log on to www.deccanherald.com/
    Subscribe to our Telegram notifications: t.me/DeccanHeraldNews
    Facebook: / deccanherald

ความคิดเห็น • 1.1K

  • @owl_tradigrade
    @owl_tradigrade 16 วันที่ผ่านมา +621

    woahh!!! soo excited for this 😂 Can't believe my life now revolves around the dream of the opening of this flyover ✌😅👀

    • @priyabratadash1833
      @priyabratadash1833 15 วันที่ผ่านมา +4

      So true even for me

    • @krishnankuppaswamy7553
      @krishnankuppaswamy7553 15 วันที่ผ่านมา +13

      This flyover will soon take the traffic congestion to HSR and all the way till Marathahalli and further. The situation today is already worse with even the slow moving traffic in the Silk board junction (entire stretch - even before ragigudda metro). It's going to be a nightmare once silkboard to ragigudda flyover is open - while the situation today is already worst.
      In my view all A, B and C ramps will hold vehicles on flyovers (like any other flyovers)
      Issues are bad road conditions and worst conditions on flyovers after HSR.
      Road humps must be removed, minimizing the deviations that can be taken by vehicles competing for service lanes.
      Bus and any other vehicles stopping to be regulated on either side of the flyover (all flyovers).
      Route buses must be regulated - not to ply on these busy areas, waiting for one to five passengers causing issues for thousands on the road. Instead private bus association may arrange one bus to pickup all passengers to a common point instead of each private bus owner plying individual buses waiting for passengers - while all participating in traffic and no one moving.
      Request DH to review these comments carefully and publish so that the authorities take appropriate action.
      We are commuting to work regularly - irony is commuting itself has become a big work.
      Why there is a race between BMTC? Who is setting race as a goal between buses while their goal must be to carry passengers only. Why all bus stops are in a spot causing other vehicles to wait causing jam?
      Note: Straight roads will help move the traffic easily. If uneven roads are built and left for usage, each vehicle takes turns in a degree that causes problems for traffic movement. Better to tie a rope, make the narrow road available for a long distance instead of allowing 45 to 90 degree deviations! Simple engineering that many are not trying to solve - though easy instead of building infrastructure which causes more and more issues all the time.

    • @im_gunari
      @im_gunari 15 วันที่ผ่านมา

      🤣🤣

    • @djay6543
      @djay6543 14 วันที่ผ่านมา +3

      As if silk board doesn't already have flyovers. Hebbal traffic is not even 20% of what silk board traffic is. Bullshit comparison.

    • @SupreethDT
      @SupreethDT 14 วันที่ผ่านมา

      😅

  • @ameyhinge5352
    @ameyhinge5352 15 วันที่ผ่านมา +416

    Unpopular opinion: I have faced worse traffic at Hebbal even with all the flyovers then at the Silk board junction.

    • @sabarisk2005
      @sabarisk2005 15 วันที่ผ่านมา +68

      Now imagine if that fly over wasn't there at hebbal

    • @owl_tradigrade
      @owl_tradigrade 15 วันที่ผ่านมา +15

      not an unpopular opinion at all. Both are equally infamous 🥲

    • @neelj5155
      @neelj5155 15 วันที่ผ่านมา +9

      Id rather be in silk board than hebbal 😊

    • @krishnankuppaswamy7553
      @krishnankuppaswamy7553 15 วันที่ผ่านมา +15

      This flyover will soon take the traffic congestion to HSR and all the way till Marathahalli and further. The situation today is already worse with even the slow moving traffic in the Silk board junction (entire stretch - even before ragigudda metro). It's going to be a nightmare once silkboard to ragigudda flyover is open - while the situation today is already worst.
      In my view all A, B and C ramps will hold vehicles on flyovers (like any other flyovers)
      Issues are bad road conditions and worst conditions on flyovers after HSR.
      Road humps must be removed, minimizing the deviations that can be taken by vehicles competing for service lanes.
      Bus and any other vehicles stopping to be regulated on either side of the flyover (all flyovers).
      Route buses must be regulated - not to ply on these busy areas, waiting for one to five passengers causing issues for thousands on the road. Instead private bus association may arrange one bus to pickup all passengers to a common point instead of each private bus owner plying individual buses waiting for passengers - while all participating in traffic and no one moving.
      Request DH to review these comments carefully and publish so that the authorities take appropriate action.
      We are commuting to work regularly - irony is commuting itself has become a big work.
      Why there is a race between BMTC? Who is setting race as a goal between buses while their goal must be to carry passengers only. Why all bus stops are in a spot causing other vehicles to wait causing jam?
      Note: Straight roads will help move the traffic easily. If uneven roads are built and left for usage, each vehicle takes turns in a degree that causes problems for traffic movement. Better to tie a rope, make the narrow road available for a long distance instead of allowing 45 to 90 degree deviations! Simple engineering that many are not trying to solve - though easy instead of building infrastructure which causes more and more issues all the time.

    • @madhukeshnp
      @madhukeshnp 15 วันที่ผ่านมา +2

      100% Agreed. Your points are valid. But none from Deccan herald have replied to your comment... i hope someone relays your message to authorities.

  • @SharathRamachandra
    @SharathRamachandra 16 วันที่ผ่านมา +339

    Honestly speaking Silk board junction is improved from what it was few years ago.
    Government/BBMP and media as well should now focus on Madivala to Nexus/Forum Mall signal, as this is notorious during peak time and takes around 40mins to cross. Also Hebbal flyover as well (from airport to City). During peak times, takes around 1hour or more to just cross the flyover.

    • @mohammedishaq6238
      @mohammedishaq6238 15 วันที่ผ่านมา +8

      Very good observation Dear
      Very Madival and St jhansi hospital Siglnal it's very bad stretch

    • @kishan5481
      @kishan5481 15 วันที่ผ่านมา +3

      ​@@mohammedishaq6238Honestly Koramangala is ignored to the fullest..

    • @mysterious_billionaire
      @mysterious_billionaire 15 วันที่ผ่านมา +3

      Learn from Chennai. There are hardly any signals there, all junctions have flyovers

    • @krishnankuppaswamy7553
      @krishnankuppaswamy7553 15 วันที่ผ่านมา +2

      This flyover will soon take the traffic congestion to HSR and all the way till Marathahalli and further. The situation today is already worse with even the slow moving traffic in the Silk board junction (entire stretch - even before ragigudda metro). It's going to be a nightmare once silkboard to ragigudda flyover is open - while the situation today is already worst.
      In my view all A, B and C ramps will hold vehicles on flyovers (like any other flyovers)
      Issues are bad road conditions and worst conditions on flyovers after HSR.
      Road humps must be removed, minimizing the deviations that can be taken by vehicles competing for service lanes.
      Bus and any other vehicles stopping to be regulated on either side of the flyover (all flyovers).
      Route buses must be regulated - not to ply on these busy areas, waiting for one to five passengers causing issues for thousands on the road. Instead private bus association may arrange one bus to pickup all passengers to a common point instead of each private bus owner plying individual buses waiting for passengers - while all participating in traffic and no one moving.
      Request DH to review these comments carefully and publish so that the authorities take appropriate action.
      We are commuting to work regularly - irony is commuting itself has become a big work.
      Why there is a race between BMTC? Who is setting race as a goal between buses while their goal must be to carry passengers only. Why all bus stops are in a spot causing other vehicles to wait causing jam?
      Note: Straight roads will help move the traffic easily. If uneven roads are built and left for usage, each vehicle takes turns in a degree that causes problems for traffic movement. Better to tie a rope, make the narrow road available for a long distance instead of allowing 45 to 90 degree deviations! Simple engineering that many are not trying to solve - though easy instead of building infrastructure which causes more and more issues all the time.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +3

      Completely half information.
      Mostly old information as well.
      Nothing details. TH-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

  • @raghavendrasunkollu3198
    @raghavendrasunkollu3198 16 วันที่ผ่านมา +297

    Ragigudda exit will become next silk-board trust me

    • @TheOneCity1
      @TheOneCity1 16 วันที่ผ่านมา +24

      Yes it will stupid people don't know how to design!

    • @anandpokale2755
      @anandpokale2755 16 วันที่ผ่านมา +40

      @@TheOneCity1 no problem, they design one more flyover there. maybe after 10 .. 20 years

    • @TheOneCity1
      @TheOneCity1 15 วันที่ผ่านมา +5

      @@anandpokale2755 🤣🤣

    • @prasannacs5358
      @prasannacs5358 15 วันที่ผ่านมา +8

      One day they will make flying cars. Wait for it till then😅

    • @TheOneCity1
      @TheOneCity1 15 วันที่ผ่านมา

      @@prasannacs5358 we already have flying cars but there are may problems

  • @bagrisapna
    @bagrisapna 15 วันที่ผ่านมา +42

    I spend 3 hours everyday to reach veerasandra from Banashankari 2nd stage. Eagerly waiting for the inauguration, it will ease my life and I will be with more energy to play with my son on return.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา

      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

  • @ashu0895
    @ashu0895 16 วันที่ผ่านมา +207

    By the time it is inaugrated, the numbers for which it is designed will become 1.5 times and then there will be traffic above as well as below

    • @Sam-rl5hs
      @Sam-rl5hs 15 วันที่ผ่านมา +31

      Why are you crying instead of appreciating what is being done. There is metro also coming up on that road which should further help reducing the traffic.

    • @bonmec101
      @bonmec101 15 วันที่ผ่านมา +3

      People are using 2w to commute instead of 4w even though they can afford unlike west. That reduces lot of traffic. The main problem with this junction is it obstructs free flow of traffic which this flyover aims to solve. Hopefully, people use metro for commute when ready. Last mile connectivity should be included in metro ticket.

    • @whykoks
      @whykoks 15 วันที่ผ่านมา

      100% correct, capacity planning is poor

    • @tejasm5324
      @tejasm5324 15 วันที่ผ่านมา

      You're right the problem is that this will encourage people more to use this and people will get stuck up and down aswell

    • @bhabanibehera5737
      @bhabanibehera5737 15 วันที่ผ่านมา +4

      If u r not a civil engineer pls remember that while designing they do the traffic surveys and consider a factor to cater the future traffic..so no need to worry

  • @ShreyasBharadwaj
    @ShreyasBharadwaj 14 วันที่ผ่านมา +21

    Everyone is excited about the flyover, I'm excited about a journalist with accurate Kannada diction 🙏

    • @ptj1ptj172
      @ptj1ptj172 11 วันที่ผ่านมา +3

      Which is why they are journalists

    • @ashokp9260
      @ashokp9260 8 วันที่ผ่านมา +1

      Ok u are excited about the kannada.. not the news!!.. en guro idhu!😂

  • @Sandeep-sg8dk
    @Sandeep-sg8dk 16 วันที่ผ่านมา +66

    biggest flyover traffic in the world opening shortly :-)

    • @krishnankuppaswamy7553
      @krishnankuppaswamy7553 15 วันที่ผ่านมา

      I read this as - traffic on flyover opening shortly.
      See my comments below.

    • @krishnankuppaswamy7553
      @krishnankuppaswamy7553 15 วันที่ผ่านมา +4

      This flyover will soon take the traffic congestion to HSR and all the way till Marathahalli and further. The situation today is already worse with even the slow moving traffic in the Silk board junction (entire stretch - even before ragigudda metro). It's going to be a nightmare once silkboard to ragigudda flyover is open - while the situation today is already worst.
      In my view all A, B and C ramps will hold vehicles on flyovers (like any other flyovers)
      Issues are bad road conditions and worst conditions on flyovers after HSR.
      Road humps must be removed, minimizing the deviations that can be taken by vehicles competing for service lanes.
      Bus and any other vehicles stopping to be regulated on either side of the flyover (all flyovers).
      Route buses must be regulated - not to ply on these busy areas, waiting for one to five passengers causing issues for thousands on the road. Instead private bus association may arrange one bus to pickup all passengers to a common point instead of each private bus owner plying individual buses waiting for passengers - while all participating in traffic and no one moving.
      Request DH to review these comments carefully and publish so that the authorities take appropriate action.
      We are commuting to work regularly - irony is commuting itself has become a big work.
      Why there is a race between BMTC? Who is setting race as a goal between buses while their goal must be to carry passengers only. Why all bus stops are in a spot causing other vehicles to wait causing jam?
      Note: Straight roads will help move the traffic easily. If uneven roads are built and left for usage, each vehicle takes turns in a degree that causes problems for traffic movement. Better to tie a rope, make the narrow road available for a long distance instead of allowing 45 to 90 degree deviations! Simple engineering that many are not trying to solve - though easy instead of building infrastructure which causes more and more issues all the time.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา

      ​@@krishnankuppaswamy7553Exactly

    • @chaluvadigowtham7573
      @chaluvadigowtham7573 14 วันที่ผ่านมา

      ​@@krishnankuppaswamy7553😢😢😢😢 true

  • @mgspec
    @mgspec 16 วันที่ผ่านมา +10

    This is definitely a good bypass surgery for namma silk board traffic problem!! Hope the up ramp and down ramps don't get blocked with piled up traffic.. Important to maintain the uniform traffic flow.
    Some traffic cops manually allow one side 10 minutes and this results in cascading of traffic for all other sides. Very important to maintain traffic flow in all directions!

    • @sowmyaacharya8618
      @sowmyaacharya8618 13 วันที่ผ่านมา

      @@mgspec bommanahalli HSR new nightmare in the making

  • @deepakkudalkar3006
    @deepakkudalkar3006 15 วันที่ผ่านมา +12

    Awaiting for the opening of this flyovers. Thanks for making such a detailed video on this

  • @MrVSMANI
    @MrVSMANI 15 วันที่ผ่านมา +29

    Good news! Hopefully the quality of construction will meet the standards.
    True colours will come out after six months.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @KaaruMYA
      @KaaruMYA 15 วันที่ผ่านมา +1

      Karnataka construction is better than BJP supported Nitish Kumar's Bihar construction. 😂
      Hopefully, it is better than Ram Mandir newly constructed roads 😅

  • @akshayleo3
    @akshayleo3 16 วันที่ผ่านมา +107

    Excellent video as always!
    Thanks for the update 👏
    Nobody covers Namma B'gluru like DH.

    • @siddharthtiwari4546
      @siddharthtiwari4546 15 วันที่ผ่านมา +3

      @@akshayleo3 DH is the best media ever

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      Completely half information.
      Mostly old information as well.
      Nothing details. TH-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      ​@@siddharthtiwari4546Completely half information.
      Mostly old information as well.
      Nothing details. TH-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @DeccanHerald
      @DeccanHerald  14 วันที่ผ่านมา +3

      Much appreciated!

    • @movieteamkannada7669
      @movieteamkannada7669 14 วันที่ผ่านมา

      Namma bengaluru is only for kannadigas not for outsiders.

  • @sugunrajiv5404
    @sugunrajiv5404 14 วันที่ผ่านมา +3

    More than the new flyover constructed ,I really appreciate the way you, Madam, explained the details!! GREAT AND CLEAR !!
    👌👌👌👌👌👏

  • @priyabratadash1833
    @priyabratadash1833 15 วันที่ผ่านมา +6

    This is my 2nd home in Bangalore silk board junction is like the most historic place in my heart all is going to change am emotional.

  • @adyar78
    @adyar78 15 วันที่ผ่านมา +8

    Very well presented Udbhavi. You have a beautiful smile and may that smile reflect on the public, once the flyover is open.

    • @udbhavibalakrishna3416
      @udbhavibalakrishna3416 13 วันที่ผ่านมา

      Thank you so much!

    • @mathewrajan8514
      @mathewrajan8514 11 วันที่ผ่านมา

      Probably she suffers from the csb traffic every day. This is a dream come true moment,but I really hope this is enough

  • @soumyaranjan4333
    @soumyaranjan4333 18 ชั่วโมงที่ผ่านมา

    I used to travel through this junction on every weekdays when I was taking java training. It really made me patient and now I don't loose my calm in Mumbai traffic.

  • @chowdarypothula4233
    @chowdarypothula4233 16 วันที่ผ่านมา +11

    We are just moving trafic jam problem from silk board to Ragi guda. After making ORR signal free, we just made some places worst. All the traffic comes to those bottleneck areas. All the traffic comes to these areas and we don't find anything useful. The complete circle should be signal free.

    • @prismaticindia9046
      @prismaticindia9046 15 วันที่ผ่านมา +1

      Next Banashankari area on the oiter ring road needs to be made traffic jam free. It is too messed up.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      Completely half information.
      Mostly old information as well.
      Nothing details. TH-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      ​@@prismaticindia9046Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @shamikbera9617
      @shamikbera9617 14 วันที่ผ่านมา

      We can conclude that building more roads doesn’t solve traffic problems. It will only make it worse due to induced demand.

    • @prismaticindia9046
      @prismaticindia9046 14 วันที่ผ่านมา

      @@chowdarypothula4233 those coming from agara lake should have signal free ride at the silk board. And from silk board to banashankari the entire route needs to be made signal free. For all the crossings and signals in that route there should be option to use fly over or to get down from the fly over. Without this comprehensive solution even if one signal is blocking on the route then it can cause bottle necks from the banashankari busstand to agara. At banashankari the flyover/underpass should be constructed for those who want to go to banashankari nagar or padmanabhanagar.

  • @Divyanavin
    @Divyanavin 16 วันที่ผ่านมา +56

    Silk board signal is an emotion

    • @gawdpromaxultra703
      @gawdpromaxultra703 15 วันที่ผ่านมา +11

      That emotion is sadness and anxiety

    • @MO-fg2cm
      @MO-fg2cm 15 วันที่ผ่านมา +1

      Why ? are you a chakka clapping for money at silk board signal ?

    • @vizdrom
      @vizdrom 14 วันที่ผ่านมา +4

      Because for traffic there is no motion

    • @KResu-nc8bk
      @KResu-nc8bk 10 วันที่ผ่านมา

      Road infrastructure has been completely chaos and messed up by Congress.
      Congress ideas are worse .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      About CONGRESS projects which are senseless.
      1. FYI, Metro tunnel connect to entire city.
      So Tunnel roads are not conducive for entire city.
      whereas entire city road infrastructure is worst of worst.
      2. Tunnels roads are meant to use only a few for certain smaller areas .
      3. Metro tunnel doesn't not create bottleneck in the corner, unlike tunnels.
      Tunnel roads creates messy in the tunnel road corners.
      complete traffic jam in
      the Tunnel corners.
      4. there are many more issues of feasibility
      Best SOLUTION are:
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      Utter nonsense n newsense ideas of Congress

  • @PRAKASHKULKARNI-pq5jy
    @PRAKASHKULKARNI-pq5jy 11 วันที่ผ่านมา

    It will certainly make life of the silk board signal users much more easier. Congratulations!!!

  • @stephendsouza7969
    @stephendsouza7969 16 วันที่ผ่านมา +23

    Finally some relief for commuters. Hope it will ease the traffic congestion. urge people to use more public transport and hopefully when metro opens it will be much better. Transport dept should start feeder busses from metro station to near by areas to ease the public connectivity. lets make namma bengaluru better.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา

      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @movieteamkannada7669
      @movieteamkannada7669 14 วันที่ผ่านมา

      Namma bengaluru is only for kannadigas. Before calling namma bengaluru first learn kannada

    • @stephendsouza7969
      @stephendsouza7969 14 วันที่ผ่านมา

      @@movieteamkannada7669 hello. Thamma Bengaluru huduga nannu. Born and brought up in Bangalore. Madiwala don Kano. KRV and Jai Karnataka associate. Namma Bengaluru.

    • @hemalpatil2152
      @hemalpatil2152 14 วันที่ผ่านมา

      @@movieteamkannada7669 first you idiots cry about a person not speaking Kannada. Then when someone tries to make Bengaluru their own, you try to gatekeep it by spewing such ignorance. Keep your elitist attitude to yourself and go cry somewhere else.

  • @guruprasadbombore3879
    @guruprasadbombore3879 16 วันที่ผ่านมา +5

    When is the final opening date?

  • @Saif_Ali_Khan_1301
    @Saif_Ali_Khan_1301 15 วันที่ผ่านมา +1

    Well done 👏🏻 that's how reporting should be done in detail and efficient manner. Kudos 👏🏻

  • @darlingdileep3971
    @darlingdileep3971 15 วันที่ผ่านมา

    Fabulous you are doing 😍 fantastic happy to see you 😊❣️ on this way profuctly talking sence good explanation at all thank you

  • @vijayakumarbs8578
    @vijayakumarbs8578 16 วันที่ผ่านมา +6

    Coming from E-City side, there’s no up-ramp to take Ragigudda flyover. This represents a missed opportunity and a failure in design. Without this connectivity, congestion at Silk Board Junction persists.

    • @vishruthkm4675
      @vishruthkm4675 15 วันที่ผ่านมา +3

      There is free left turn hence they might have not considered ramp

    • @PavanKumar-rg8cd
      @PavanKumar-rg8cd 15 วันที่ผ่านมา

      True, even after designed this much big flyover, they missed ramp down/up between Silkboard and ragigudda. A very bad design, or not thinking holistically.

    • @harshaldesai5393
      @harshaldesai5393 15 วันที่ผ่านมา

      I think there is a ramp up right before Silkboard metro station after taking the free left at silk board

    • @yourbff1484
      @yourbff1484 15 วันที่ผ่านมา

      India has free left turn on major roads and it's no brainer to have up ramp

    • @rrarjun8
      @rrarjun8 15 วันที่ผ่านมา

      It's there in the design in front of the silk board gate or just after silk board metro building via btm
      Not yet started the constitution..

  • @viswasparameshiah8680
    @viswasparameshiah8680 15 วันที่ผ่านมา +28

    While this is a great improvement over the existing conditions, Deccan Herald ( @DeccanHerald )should do a video to highlight the atrocities of the private & public buses who stop to pick up passengers at the beginning of the Hosur Road (near to Silk Board junction) leading to Electronic City. Even at 12 in the night there are jams caused by these buses who stop most of the times middle of the road leading to traffic jams and at times I have witnessed people fighting over to pass these buses. Wonder why traffic police department & media is giving a blind eye to this situation.

    • @01abhinavrajput
      @01abhinavrajput 15 วันที่ผ่านมา +2

      Obviously because they dont care. They know nobody will question them. As soon as somebody questions them, there will be many idiots who will ask them to go back to their state.

    • @thenameisrizwan
      @thenameisrizwan 15 วันที่ผ่านมา

      Well said on the private buses thing, they are a nightmare for the road users . Those buses stop in the main carriageway literally blocking one lane completely, and these stops continue till almost after agara lake.. really pathetic state of things

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา

      Completely half information.
      Mostly old information as well.
      Nothing details. TH-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @senthilkumarvenkatachalam2974
      @senthilkumarvenkatachalam2974 15 วันที่ผ่านมา +1

      where should they pickup the passengers then? in hosur?

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      @@senthilkumarvenkatachalam2974 They need to have 2 more new Bus terminals nearby Silkboard area.

  • @nandeeshrai5234
    @nandeeshrai5234 15 วันที่ผ่านมา +2

    Loved the coverage.

  • @sheshadrivenkatadri6427
    @sheshadrivenkatadri6427 14 วันที่ผ่านมา +1

    Kudos and more power to DH for covering topics most relevant to Bangalore!

    • @KResu-nc8bk
      @KResu-nc8bk 10 วันที่ผ่านมา

      Road infrastructure has been completely chaos and messed up by Congress.
      Congress ideas are worse .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      About CONGRESS projects which are senseless.
      1. FYI, Metro tunnel connect to entire city.
      So Tunnel roads are not conducive for entire city.
      whereas entire city road infrastructure is worst of worst.
      2. Tunnels roads are meant to use only a few for certain smaller areas .
      3. Metro tunnel doesn't not create bottleneck in the corner, unlike tunnels.
      Tunnel roads creates messy in the tunnel road corners.
      complete traffic jam in
      the Tunnel corners.
      4. there are many more issues of feasibility
      Best SOLUTION are:
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      Utter nonsense n newsense ideas of Congress

  • @jeethuutube
    @jeethuutube 16 วันที่ผ่านมา +12

    Great! More traffic dumped into silkboard direct

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา

      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @harish123az
      @harish123az 10 วันที่ผ่านมา +1

      How is it "more" traffic? And its not being dumped to silk board, all are avoiding it and going over that to other stops.

    • @madhuguru3130
      @madhuguru3130 8 วันที่ผ่านมา

      @@harish123az Until Electronic city to Marathahalli side is cleared I am thinking this won't solve much because the problem is that route.

    • @harish123az
      @harish123az 7 วันที่ผ่านมา

      @@madhuguru3130 Exactly, I agree, this is focused on the other side which was never a huge problem.

  • @chowdarypothula4233
    @chowdarypothula4233 16 วันที่ผ่านมา +3

    Please make some video on kanakapura ORR junction. Every small road has flyover like delmia circle, JP nagar 6th phase road, devegowda petrol bunk road. I don't know why there is no flyover at kanakpura road. Some footpath extension work has started which decongests the road.

  • @arunkumar-pb8gh
    @arunkumar-pb8gh 10 วันที่ผ่านมา

    Super proud of reporters like you 👌...Factual narration and at the same time keeping it simple . Otherwise the kind of media people today just shout ! shout !! and shout only 😂😂

  • @abhishekn9871
    @abhishekn9871 16 วันที่ผ่านมา +11

    Hope they do something for Goraguntepalya junction as well...

    • @madhusudang8433
      @madhusudang8433 15 วันที่ผ่านมา

      For that u can't build any flyover. Only solution is underground tunnel.for.ring road so.veichles in ring road flow without issue

    • @abhishekn9871
      @abhishekn9871 15 วันที่ผ่านมา +1

      @@madhusudang8433 they could've planned underpass many years ago but they didn't...

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      ​@@madhusudang8433Underground tunnel is Utter nonsense.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      ​​@@madhusudang8433
      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      ​@@abhishekn9871Well said

  • @siddharthtiwari4546
    @siddharthtiwari4546 16 วันที่ผ่านมา +33

    Bangalore is going to change very soon completely after the metro work completion is done
    Traffic congestion will reduce public will be happy to use metro instead of any public transport

    • @shreyass5664
      @shreyass5664 15 วันที่ผ่านมา +4

      DEFINITELY Bengaluru will come out of this traffic issue very soon already it is improved from 2 to 6th position in tom tom index.😊 Let us help the city to solve the traffic issue and bring back its glory which has given life to many people😊❤BLR

    • @siddharthtiwari4546
      @siddharthtiwari4546 15 วันที่ผ่านมา +4

      @@shreyass5664 Yes for sure , I'm not kannada but atleast I can help here to decrease traffic congestion..
      Where atleast ambulance shouldn't get stuck
      We can all take Bengaluru as no.1 city

    • @shreyass5664
      @shreyass5664 15 วันที่ผ่านมา

      @@siddharthtiwari4546 Let us make 1% change in our driving habits like following lane discipline, not stopping on zebra crossing etc it will help in long way.👍A true bengalureans dream is BLR should become like Singapore one day .Let us not waste the 35yrs of hardwork the city has come this level let us all support and help each other and take the city to next level BLR 👍

    • @alexsmart2612
      @alexsmart2612 15 วันที่ผ่านมา

      And unicorns will fly amongst rainbows of colors in a valley of flowers.

    • @siddharthtiwari4546
      @siddharthtiwari4546 15 วันที่ผ่านมา

      @@alexsmart2612 Bengaluru city special flower which is 🪷

  • @satishk759
    @satishk759 15 วันที่ผ่านมา

    Amazing construction hopefully ease traffic congestion and help people to decrease stress and pollution!! Nice presentation 😊

  • @ramalingamdara6262
    @ramalingamdara6262 8 วันที่ผ่านมา +1

    I suggest you to play old situation video and the present one. That keeps viewers recognize benefits and your efforts of covering the event. I congratulate your channel for the efforts.

  • @siddheshshivraj3534
    @siddheshshivraj3534 16 วันที่ผ่านมา +2

    Hopefully it doesnt collapse on itself like many wonderful infrastructure we have.

  • @sohanthkumar6170
    @sohanthkumar6170 15 วันที่ผ่านมา +7

    Bangalore has the best of busses within city. Only thing they need to improve is frequency and timetable. No other state has so many busses for public transport.
    People just want to show off their cars on the road. Especially IT employees go to office in a suv while being alone. Then complain that they have too much traffic. If all employees go to office in 2 wheelers or pool(Indian sentiment will not allow this) this will reduce traffic by 30%. Some companies do not provide cab facilities as well as it is cost for them and bad for business. I can take names of such companies if someone challenges me. Also, WFO is made compulsory atleast for 3 days. Whereas before lockdown also these companies didn't have any fixed WFO days. There was no restriction before on how many days you work from home/office. I think people from govt are forcing companies to make this rule. Collaboration is all bullshit that these companies make up. I know a lot of them who just go to office, swipe and come back. This will just increase revenue for govt. Vehicle registration, rent, property taxes. Growing city= more investments= more options for corruption= more slaves. I have no shame in telling that Bangalore will be home of the homeless and rowdies in future.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา

      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

    • @sugumarmukambikeswaran8449
      @sugumarmukambikeswaran8449 13 วันที่ผ่านมา +1

      But it is only for short distance. For example if you want to go to jayanagar from bannarghatta road there is no straight bus. You have to get down at Gopalakrishnan mall and walk on km to catch bus to jayanahar. There are no buses to cover long distance in bangalore.

    • @KResu-nc8bk
      @KResu-nc8bk 13 วันที่ผ่านมา +1

      @@sugumarmukambikeswaran8449 Exactly. totally nonsense service.

    • @KResu-nc8bk
      @KResu-nc8bk 13 วันที่ผ่านมา +1

      @@sohanthkumar6170 Only you have to say so.

    • @KResu-nc8bk
      @KResu-nc8bk 13 วันที่ผ่านมา +1

      @@sohanthkumar6170 You are naive person

  • @AllMidis
    @AllMidis วันที่ผ่านมา

    I have my colleagues commuting using this Flyover and they feel much relieved

  • @tvm73836
    @tvm73836 15 วันที่ผ่านมา +2

    I hope they have constructed this well and followed all the safety norms. Given the high level of corruption with any Karnataka government the contractors have very little profit margin so they then to cut corners during design and construction

  • @abhiishot2007
    @abhiishot2007 16 วันที่ผ่านมา +5

    Bengaluru will always be full of traffic. Karnataka should start two child policy urgently and tell all companies to stop giving jobs to families having more than 2 kids

    • @ApulicaOfficial
      @ApulicaOfficial 16 วันที่ผ่านมา +7

      what nonsense

    • @rrarjun8
      @rrarjun8 15 วันที่ผ่านมา +2

      Not only Bengaluru,all major cities in India have traffic.. don't blame our Bengaluru..

    • @abhiishot2007
      @abhiishot2007 15 วันที่ผ่านมา

      @@ApulicaOfficial So do u love to get stuck in traffic if u are in an ambulance?

    • @movieteamkannada7669
      @movieteamkannada7669 14 วันที่ผ่านมา +1

      ​@@abhiishot2007first non kannadigas should move out from bengaluru

  • @sauravjaiswal2204
    @sauravjaiswal2204 16 วันที่ผ่านมา +3

    Current congress Freebies rewadi government is worst ..... Busy in making money and appeasements Politics 🤐🤐🤐🤐🤐
    We middle class hard tax payer are not getting anything 🤒🤒🤒🤒

    • @TheRavikumarb
      @TheRavikumarb 15 วันที่ผ่านมา

      Go back to ur place then..

  • @rajeshhs8
    @rajeshhs8 15 วันที่ผ่านมา

    Thank you for the details!! This is more worth waiting all this days😂

  • @nandanbellare6445
    @nandanbellare6445 15 วันที่ผ่านมา

    Informative video, thank you.

  • @prithvi1225
    @prithvi1225 16 วันที่ผ่านมา +3

    All because of non native people

    • @SebinMatthew
      @SebinMatthew 16 วันที่ผ่านมา +1

      This is one country. Even you are not native to Bengaluru. Your ancestors might have come from some rural place to Bengaluru. Just because your family did it a few generations ago does not make you native.

    • @prithvi1225
      @prithvi1225 15 วันที่ผ่านมา

      @@SebinMatthew my ancestors are #KANNADIAGS from here ಬೆಂಗಳೂರು.. yes one country we all are in, but we'll are one family but in a different house's 🏡 yet I don't go to others home's whine about their 🏡... Bengaluru is for Karnataka native people just like howz Cochin is for Kerala, Chennai for Tamil nadu etc.... you learn Kannada pal

    • @madhuguru3130
      @madhuguru3130 8 วันที่ผ่านมา

      Right... people whom you hire because it's too expensive to hire locals.

    • @madhuguru3130
      @madhuguru3130 8 วันที่ผ่านมา

      ​@@prithvi1225 outsiders build this city. Locals only complain about outsiders.

    • @prithvi1225
      @prithvi1225 8 วันที่ผ่านมา

      @@madhuguru3130 that's what people do when they've been hired by native owners

  • @ganeshks9344
    @ganeshks9344 5 วันที่ผ่านมา

    Always DH is covering the bangalore things with very informative

  • @guruprasaddattatribhatt6164
    @guruprasaddattatribhatt6164 15 วันที่ผ่านมา +2

    ಪ್ರಜಾವಾಣಿ ಡೆಕ್ಕನ್ ಹೆರಾಲ್ಡ್ ವಿಡಿಯೋ ಗಳು ವಿವರಣೆ ತುಂಬಾ ಚೆನ್ನಾಗಿರುತ್ತೆ

  • @piyushgaurav4368
    @piyushgaurav4368 15 วันที่ผ่านมา +2

    Hey DH Team , Consider covering the Mayhem/Jam at Balagere road - Limbavali Underpass. It is a huge issue impacting a wide number of population living in Varthur, Balagere Road..

  • @prasulpradeep
    @prasulpradeep 16 วันที่ผ่านมา +1

    Great coverage

  • @PolitiVoyager
    @PolitiVoyager 9 วันที่ผ่านมา

    Finally, a big relief for daily commuters. 👏🎉

  • @girishkumarbkable
    @girishkumarbkable 15 วันที่ผ่านมา

    Awesome coverage by Deccan Herald. I like their details from birds eye view, markings ... very nice. Next Bannerghatta road metro ...please.

  • @sjunjur
    @sjunjur 10 วันที่ผ่านมา

    Silk board junction has improved a lot, I had visited this double decker flyover.

  • @amruthkesari3440
    @amruthkesari3440 11 วันที่ผ่านมา +2

    The emphasis should be on public transport. Unless citizens don't show interest in public transport and keep traveling in their own private vehicles, no flyovers will help. One bus can remove around 20 to 30 vehicles from the road it plies on. Imagine the impact of just 10 buses.
    The government should push people to take public transportation as the primary means of commute. With Metro line almost ready, the government should now think about point to point accessibility. Shared auto/cabs, car pooling and more importantly private buses should be allowed to operate. If women are allowed free bus rides through out the day, I don't think there is going to be much harm in allowing free bus for everyone during peak 2 hours in the morning and another 2 hours in the evening in select routes only.

  • @shaabdulmanan9980
    @shaabdulmanan9980 15 วันที่ผ่านมา +1

    Great work DH

  • @myownperfectdisaster
    @myownperfectdisaster 10 วันที่ผ่านมา +1

    Well done! This is some neat reporting

  • @Mahesh0908-bk3do
    @Mahesh0908-bk3do 11 วันที่ผ่านมา

    Bangalore requires multiple flyovers like these across the city to shed its reputation as a traffic nightmare and reclaim its title as the Garden City. Effective infrastructure improvements can help address the chronic congestion issues and improve the quality of life for its residents.

  • @achuthanp464
    @achuthanp464 15 วันที่ผ่านมา

    Very good. Thanks to the authorities. It saves not only time but also Fuel in lacs of litters.

  • @sachinhj9910
    @sachinhj9910 15 วันที่ผ่านมา +1

    In love with the anchor❤

  • @sampathacharya1285
    @sampathacharya1285 15 วันที่ผ่านมา

    Informative 😊

  • @saikirang210
    @saikirang210 14 วันที่ผ่านมา +1

    These flyovers and metro lines are lifelines for city like Bengaluru where at peak hours it's like a war crossing these junctions... Though being late to get them into progress commuters would be happy atleast it got into action.. Funfact : 6:50 why does that bike rider look like yash😂😂

  • @sawannanjappa1942
    @sawannanjappa1942 15 วันที่ผ่านมา +2

    Nice video…. Showing critics at the end that this double decker flyover has taken 2 years to years to complete….. which also includes a metro line .. was a nice touch …
    Can you please make a video on the flyover being constructed on Ejipura junction…. Where commuters are struggling from a decade to cross Sony world signal …… between those pillars there are called “stone henge” of Bangalore….

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา

      Completely half information.
      Mostly old information as well.
      Nothing details. TH-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

  • @tronzi2131
    @tronzi2131 15 วันที่ผ่านมา +1

    This is what a coverage should look like ❤❤ nice work

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      Completely half information.
      Mostly old information as well.
      Nothing details. TH-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @udbhavibalakrishna3416
      @udbhavibalakrishna3416 13 วันที่ผ่านมา

      Thanks for watching!

  • @anuragpandey2635
    @anuragpandey2635 10 วันที่ผ่านมา

    Really great to see this finally being open.. Great work govt.

  • @manishjha4224
    @manishjha4224 15 วันที่ผ่านมา +1

    Fastest and most exclusive report. Appreciate journalism

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา

      Completely half information.
      Mostly old information as well.
      Nothing details. TH-cam guys covering better information than this media.
      Being in Media , they are not working hard.
      only simply camera and some old information.
      Nothing new data.
      nothing new ideas as well.

    • @udbhavibalakrishna3416
      @udbhavibalakrishna3416 13 วันที่ผ่านมา

      Thanks for watching!

  • @Dnabkhz
    @Dnabkhz 12 วันที่ผ่านมา

    thank you for making video, i love big infra

  • @AppooXevwo
    @AppooXevwo 15 วันที่ผ่านมา +1

    It's not a solution, all near by junctions where these bridge ramps end, will have the same vibe of the infamous silk board junction😅

  • @jatind3
    @jatind3 14 วันที่ผ่านมา

    Excellent video. I travel between Bannerghatta road and HSR so this DD flyover is definitely going to help. Even if half the traffic currently passing thru BTM just to go towards Electronics city/Sarjapur road used this flyover, it will help decongest BTM layout and Silk board signal.

  • @sparshgoil3768
    @sparshgoil3768 15 วันที่ผ่านมา

    Amazing!!!

  • @proteemmukherjee5405
    @proteemmukherjee5405 13 วันที่ผ่านมา

    I travel every day through silk board lol it's just another hour of my day gone lol.. I am used to it now

  • @girishbharatwaj90
    @girishbharatwaj90 10 วันที่ผ่านมา +1

    As far as people have self disciplined driving culture , no bridge or double decker can help the state! 😂

  • @Pradeepmh_vlogs
    @Pradeepmh_vlogs 13 วันที่ผ่านมา +1

    I can go meet my friend from HSR sector 1 to Ragigudda in minutes, which usually takes 30 to 40mins now.

  • @sanjayng3233
    @sanjayng3233 14 วันที่ผ่านมา

    happy to see the new #double decker flyover access.
    now, we can say that crossing of silk board traffic will not be under acheivement category.
    appending vehicles and pollution, even the people also should be concerned about controllong the pollution by using eco frendly vehicles like eletric and bicycles to cummute in the banglore traffic.
    once agian, looking forward to see smooth flow of traffic in and near silkboard junctions

  • @mohanbabupm5778
    @mohanbabupm5778 15 วันที่ผ่านมา

    Useful information by the speaker hefty thanks to the bridge engineers who had deployed the prestressed techniques worked day and night toiled hard which had translated into reality which is there to see for everyone kudos to govt of Karnataka this double decker technology will reduce the traveling time of the bridge users

  • @arunmoh
    @arunmoh 10 วันที่ผ่านมา +1

    today there a huge jam in front of the ecity ramp.. the design should have had a ramp directly connecting to ecity fly over.. i think traffic will only increase

  • @DharaneeshKH
    @DharaneeshKH 15 วันที่ผ่านมา +1

    Excellent report ! And you have such a beautiful smile 😊.. Pleasure to watch your report 👍

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา +1

      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

  • @shankar49677
    @shankar49677 15 วันที่ผ่านมา

    Very much. Coming from outside Bengaluru last week, i left at 5 am so that i cross this junction. While entering i took 3 hours to reach Hennur Road from Electronic City.

  • @vinayak3751
    @vinayak3751 3 วันที่ผ่านมา

    I had fallen down on my bike due to the gravel and sand thrown carelessly on the road for constructing this flyover one year ago. Hope it will be ready soon.

  • @krishnakumarmenon5879
    @krishnakumarmenon5879 13 วันที่ผ่านมา +1

    Well presented and explained by Balakrishnan

  • @robintdaniel
    @robintdaniel วันที่ผ่านมา

    Now there is another strong contestant. Hebbal !!!

  • @kavithadeshpande3383
    @kavithadeshpande3383 15 วันที่ผ่านมา

    Also am in good agreement with Mr. Sharat Ramachandra's and Mr. Viswas Parameshaia's genuine observations.

  • @karthikmurali6012
    @karthikmurali6012 13 วันที่ผ่านมา +1

    So many negative comments. Lets be optimistic 🙂. Been working in Bangalore for 15 yrs now. The people influx is insane. The city was never built for so much people. Lets support the gov and do more from our side also. I see people going to office in innova with just one person driving. Lets do our bit and push the gov to do faster work 😊

    • @madhuguru3130
      @madhuguru3130 8 วันที่ผ่านมา

      Government doing very well banning carpooling apps (yes that was sarcasm). People are negative because whatever little we get in the form of civil infrastructure is late, over budget and misses one or two things.
      Roads are a mess across the city with drilling work constantly ruining good roads. Flyover roads have potholes. Sarajapur Junction has no flyover for traffic going from silk board to marathahalli, so genius traffic policemen opened a lane on the flyover coming from marathahalli to silk board... which is slower than the lower level traffic going through the sarjapur signal.

  • @khajajirazak607
    @khajajirazak607 14 วันที่ผ่านมา

    Beautiful , coverage.

  • @AbhishekSingh-oy5lv
    @AbhishekSingh-oy5lv 15 วันที่ผ่านมา

    This helps, nice video

  • @KaaruMYA
    @KaaruMYA 15 วันที่ผ่านมา

    Definitely it will help in reducing traffic congestion. Waiting to open.

  • @padmanabhas3676
    @padmanabhas3676 15 วันที่ผ่านมา

    Informative video

  • @SKhan-nh1ko
    @SKhan-nh1ko 2 วันที่ผ่านมา

    Thanks to Karnataka Govt for solving this issue

  • @Jash3811
    @Jash3811 11 วันที่ผ่านมา +1

    Huge jam will be at exit ...never ending

  • @virupakshagowda8375
    @virupakshagowda8375 15 วันที่ผ่านมา

    Yes it really helps and reduces traffic load in CSB junction

  • @nsksaiuday1861
    @nsksaiuday1861 3 วันที่ผ่านมา

    Honestly I am not sure how much its going to reduce the traffic, but certainly it will reduce the commute time towards electronic city and HSR layout

  • @rajavishnuvardhana6830
    @rajavishnuvardhana6830 15 วันที่ผ่านมา +1

    God please make it soon❤

  • @adthya9209
    @adthya9209 15 วันที่ผ่านมา +1

    I hope all 600 series BMTC will use this ramp to turn right at silk board towards Hosur road .. during peak hours the jam often goes for 30mins+

    • @EeyyWakee
      @EeyyWakee 15 วันที่ผ่านมา

      I think I saw a height restriction barrier, so buses won’t go on the flyover.

  • @noorulameen4605
    @noorulameen4605 11 วันที่ผ่านมา

    Execulent coverage well done

  • @arjunkg7207
    @arjunkg7207 4 วันที่ผ่านมา +1

    The anchor is cute though! :P

  • @vageeshajm990
    @vageeshajm990 14 วันที่ผ่านมา

    Constructing flyover is 4 years. Waiting to be inaugurated is another 4 years. Damn!

  • @pradyumnarahul
    @pradyumnarahul 14 วันที่ผ่านมา

    After 4-5 years, traffic will adapt and we will all go back to the same old traffic problems.

  • @pandian.esakki
    @pandian.esakki 12 วันที่ผ่านมา

    Excellent news, waiting for the opening!

  • @Boykajjk
    @Boykajjk 14 วันที่ผ่านมา

    You guys amazing❤

  • @parthppopat
    @parthppopat 15 วันที่ผ่านมา

    I was born in Bengaluru & I live in Mumbai, no doubt who I will be voting for again in MH, BMC & 2029 😊

  • @kiranks1984
    @kiranks1984 14 วันที่ผ่านมา

    nice one DH! Surprised that no ramp for entry from BTM towards ragigudda....the ramp from hsr to btm seems redundant at the same time....time will tell...and ofcourse like few have already pointed it out, ragigudda and banashankari signal will be the new bottlenecks

  • @brahmawarrior5424
    @brahmawarrior5424 13 วันที่ผ่านมา

    I lived in Bangalore in 2003-2005 and the Silk Board Junction wait time used to be 45 minutes

  • @devduttprasad4021
    @devduttprasad4021 15 วันที่ผ่านมา +1

    20 years i have gone through that hell called csb junction hope it's opened ASAP

    • @KResu-nc8bk
      @KResu-nc8bk 15 วันที่ผ่านมา

      Congress idea are worst .
      they stopped NICE ROAD PROJECT.
      They even stopped peripheral ring road for 3 to 4 decades .
      Instead of new bangalore n 3 more ring road, the Congress wants only old bangalore.
      they will squeeze another 2+ crore population in this same old bangalore.
      uther nonsense n newsense.

  • @Deadpool-jy2pv
    @Deadpool-jy2pv 15 วันที่ผ่านมา

    Entry ramp needs to be provided from btm layout toward the hsr layout