  • @TomSteele93
    @TomSteele93 5 ปีที่แล้ว +2

    This is fascinating stuff! It is certainly an incredible example of awesome engineering!

  • @rajmagan8568
    @rajmagan8568 5 ปีที่แล้ว

    Amazing animation of world class engineering.

  • @richardruby8866
    @richardruby8866 6 ปีที่แล้ว +2

    Such a shame that due to the costs, nations would choose the slower 2-5 ft per hour drilling-rate TBM over the Main Beam, which could drill out more than 30 ft per hour. And with such a fast TBM, and with GPS, and two TBMs able to start at both ends and each only having to complete half the tunnel before the drilling is complete, extreme long tunnels, such as one that would link Ireland and England, would take only a matter of years to drill. And while the water is extremely deep where such tunnels had been proposed, such as from Ireland to England (500+ ft, well a bored tunnel in Norway extends 940 ft below sea level. So a tunnel from Ireland to England is achievable.

  • @annapabreu
    @annapabreu 2 ปีที่แล้ว

    Interesting, there is no pre-cast segments lining for this kind of tunnelling method?

    • @TheRobbinsCo
      @TheRobbinsCo  2 ปีที่แล้ว

      Hi, thanks for your question. That's correct, Main Beam (aka Open Type) machines are in most cases not used with a tunnel lining. We have provided Main Beam TBMs where invert segments are placed behind the machine, or a concrete floor is poured behind the machine. We have also used steel plate liners with our Main Beams. Check out more info here: www.robbinstbm.com/products/tunnel-boring-machines/main-beam/

  • @basudevshee1006
    @basudevshee1006 ปีที่แล้ว

    SIR my name basudev shee. My qulifaction HIGHER SECENDARY+ITI ELECTRICIAN NCVT BOARD. SIR PLEASE I JOIN ROBBINS TUNNELS.