How to create add customize and manage roles in primavera p6 | Assign roles to activities in p6 | p6

แชร์
ฝัง
  • เผยแพร่เมื่อ 14 ธ.ค. 2021
  • About Roles
    Roles represent personnel job titles or skills needed to execute projects. Architect, general laborer, quality assurance tester, and an engineer are all examples of possible roles. You can create a standard set of roles that you then assign to labor and non-labor resources and activities for all projects in the organization. You can establish an unlimited number of roles and organize them in a hierarchy for easier management and assignment. The set of roles you assign to an activity defines the activity’s skill requirements. You can also define multiple prices per unit rates and unit per time limits for each role to accurately plan future costs and allocation.
    You can assign one or more roles to individual resources. When you assign roles to a resource, you also indicate their proficiency in that role and identify which role is their primary role. A primary role is the main role the resource is currently performing. The proficiency level describes the resource's skill level in that role.
    Assign roles to activities as you would resource during project schedule and cost planning. When your plans are finalized, you can replace roles with resources, based on each activity’s role and skill requirements.
    Planning - P6 Channel videos Link:
    / planningp6
    80- How to do Earned Values setting admin preferences of primavera p6 | Earned Value Calculations p6 EV
    • How to do Earned Value...
    81- How to do Reports setting admin preferences of primavera p6 | Reports Headers and Footers in p6
    • How to do Reports sett...
    82- How to do Options setting admin preferences of primavera p6 | interval to summarize store spreads
    • How to do Options sett...
    83- How to do Rate types setting admin preferences of primavera p6 | Change Rate types in primavera p6
    • How to do Rate types s...
    84- How to do Industry setting admin preferences of primavera p6 | Select industry in primavera p6 | p6
    • How to do Industry set...
    85- How to use Exception Site List admin preferences of primavera p6 | add online Ural's links in p6
    • How to use Exception S...
    86- How to perform Assistance settings in primavera p6 | User preferences | show hide wizards in p6 |
    • How to perform Assista...
    87- How to perform Application settings in primavera p6 | Customize Startup window of p6 software | p6
    • How to perform Applica...
    88- Resource Analysis settings in primavera p6 | Custom Time Distributed Resource Calculations Intervals
    • Resource Analysis sett...
    89- Resource Assignment and staffing settings in primavera p6 | Retain Lag p6 | Calculations Settings P6
    • Resource Assignment an...
    90- Startup filters settings in primavera p6 | User Preferences Settings Primavera P6 | Planning P6 | P6
    • Startup filters settin...
    91- Explain Difference between delete and dissolve option in primavera p6 | planning p6 | Tips tricks p6
    • Explain Difference bet...
    92- How to use find and replace functions in Primavera p6 | Tips and Tricks primavera p8 | Planning P6 |
    • How to use find and re...
    93- How to use Link Activities function in Primavera p6 to assign relationship | Tips p6 | Planning P6 |
    • How to use Link Activi...
    94- How to show and customize progress line in primavera p6 time scale | Purpose of progress line in p6
    • How to show and custom...
    95- Watch and learn Tab Groups and arrangements in primavera p6 | Display multiple windows at once | p6
    • Watch and learn Tab Gr...
    96- How to track the project matters with the thresholds tool in primavera p6 | Purpose of thresholds |
    • How to track the proje...
    97- How to add prioritize project issues in primavera p6 | issue tracking in p6 | issue to activities p6
    • How to add prioritize ...
    98- How to add manage risks and opportunities in primavera p6 | how to generate risk report in p6 | Tips
    • Video
    99- How to use Tracking for performing schedule cost resource analysis display multiple project in p6
    • How to use Tracking fo...
    100- How to create add customize and manage roles in primavera p6 | Assign roles to activities in p6 | p6
    • How to create add cust...
    #createroles,#Assignroles,#planningp6

ความคิดเห็น •