Mifflin Solid Waste Transfer Station tipping floor repair.

แชร์
ฝัง
  • เผยแพร่เมื่อ 5 ก.ย. 2024
  • A previous emery topping had failed and the owners wanted a more durability surface for their tip floor. 6,000 sq.ft. of floor was milled (to remove the remaining emery topping) then was overlayed with EucoFloor 404 over a weekend. Floor returned to service 6 am Monday morning. Infrastructure Repair Service, LLC out of Lincoln Park, NJ did the work.

ความคิดเห็น •