  • Construction footage from Highway 32 to Skyway along the Bruce Road corridor. Footage begins just south of Highway 32 and continues south to Skyway.
    Bridge crews are working on installing the bottom mat of rebar for the bridge deck and setting the layout for the deck drain. Roadway crews are working on roadway excavation and grading along E 20th St and on the west side of Bruce Road (In between Concord Ave and E 20th St). Curb and gutter are also being placed along the areas just mentioned. Barbed wire fencing is also being installed along E 20th St as part of this project.