Foss Maritime Dock Construction | 36" Temporary Casing | Pacific Foundation
ฝัง
- เผยแพร่เมื่อ 20 ต.ค. 2024
- In this project, Pacific Foundation and Foss Maritime are collaborating to pre-bore shafts for a new dock construction along the Columbia River, one of the world's most challenging waterways. Using a barge-mounted BG24H, Pacific is installing 36" temporary casing and grout to support the new permanent dock piles.