PILE DRIVING & set up, dock framing #1
ฝัง
- เผยแพร่เมื่อ 16 พ.ย. 2024
- On this project we are working on a new dock with double boathouse under one roof two boatlifts. All the decking will be gray Thru-flow Synthetic decking. All the pilings on this project are piling wrap to prevent bore worm infestation and they are all driven down with a vibratory hammer all dock pilings or 6 inch 20 feet long driven into the soil 9 to 10 feet