WHat do you mean? I did not understand your question. Smart pig is only when for a purpose, to collect pipeline internal data, it has no other uses Some normal pig might have sensor to trtace it from outside, thats it.
Great teaching and thank so much. Pls how do I know the type of pig to use and how is the pig coupled and received to avoid too much of product loss assuming operation is on and lastly at what point do I receive the pig and how pls?
Thanks for your query. Selection of PIG depending on the service, type of pipeline (Metallic/ non metallic, coated or uncoated etc. ) purpose of the pigging - many factors. Generally, during construction of pipeline, we use the pig for- 1) cleaning the pipeline (Hard foam Pig with or without Metallic brush, Disk - bi or unidirectional pig with CS brish installed. 2) For filling Water 3) for dewatering, swabbing the pipeline after hydrotest, 4) For mothballing the existing pipeline (cleaning the service waste, 5) For introducing Nitrogen, dry air for lay up to protect the hydrotested pipeline till commissioning, 6) while introducing the service gas or liquid to remove the air/ nitrogen from the pipeline completely or as much as possible.. Actually, when ever you will be exposed to the real work - you will have more detailed knowledge gradually.
It very useful video brother... Could you pleas let me know what is the procedure for pigging pipeline... ASME procedure Please help me what is the procedure can I use for pipeline pigging gas and oil
Pigging a line in construction phase is for internal Cleaning before or after hydrotesting. This will be little different for cleaning the Existing pipeline. What is your requirement?
@@OilandGas-inspection-soumen Line was working ..then stop . Now we need to operating the line a gain .. We need to know what is the procedure required for that.. Befor hydrotest .. Please all the information if possible before band after hydrotes .
A simple yet powerful representation. Cover a wide range of PIG. Thanks a lot 🙏
Helpful & Insightful, thank you for putting this together!
Thank You
Very good presentation in simple language
Very Good Information. Thank you
Thanks for this video
Nice info ✨👍
Excellent🙏🙏Thank you
Tons of thanks, please be with me, gradually i will go through all construction processes.
Excellent my bro, i need your powerpoint that used it in your video
I do not have any powerpoint, These are imy experience collected in the video with some photos with some write up
Can a foam pig with steel brushes be used in a live natural gas pipeline??
can you recommend smart pigs? thanks for the info
WHat do you mean? I did not understand your question. Smart pig is only when for a purpose, to collect pipeline internal data, it has no other uses
Some normal pig might have sensor to trtace it from outside, thats it.
Great teaching and thank so much.
Pls how do I know the type of pig to use and how is the pig coupled and received to avoid too much of product loss assuming operation is on and lastly at what point do I receive the pig and how pls?
Thanks for your query.
Selection of PIG depending on the service, type of pipeline (Metallic/ non metallic, coated or uncoated etc. ) purpose of the pigging - many factors.
Generally, during construction of pipeline, we use the pig for- 1) cleaning the pipeline (Hard foam Pig with or without Metallic brush, Disk - bi or unidirectional pig with CS brish installed.
2) For filling Water 3) for dewatering, swabbing the pipeline after hydrotest, 4) For mothballing the existing pipeline (cleaning the service waste, 5) For introducing Nitrogen, dry air for lay up to protect the hydrotested pipeline till commissioning, 6) while introducing the service gas or liquid to remove the air/ nitrogen from the pipeline completely or as much as possible..
Actually, when ever you will be exposed to the real work - you will have more detailed knowledge gradually.
It very useful video brother...
Could you pleas let me know what is the procedure for pigging pipeline...
ASME procedure
Please help me what is the procedure can I use for pipeline pigging gas and oil
Pigging a line in construction phase is for internal Cleaning before or after hydrotesting. This will be little different for cleaning the Existing pipeline. What is your requirement?
@@OilandGas-inspection-soumen
Line was working ..then stop .
Now we need to operating the line a gain ..
We need to know what is the procedure required for that..
Befor hydrotest ..
Please all the information if possible before band after hydrotes .
Is it possible to do a video regarding open trench pipe laying details in swamp area❤️
Yes Sure, you want to know about the pipe lowering. trenching type of activity, please allow me some time.