It has been refreshing for us to keep watching your videos on TH-cam for the past few weeks.We all kindly request you to keep making and posting such piping related videos and at least you should post more than one video per day.
Nailed it sir. But for seat test test and backseat test you have written 1.5times instead of 1.2. very happy to post videos often.my humble you to Keep on continuing
Thank you Sir for new and very nice videos I am very happy with this videos, please prepare a video about valve trimes and trim materials. Best regards
Thank you for the video. Beautiful one. For backseat test of gate or globe valve, the valve should have a back seat bush and the valve should be in fully open condition. With spindle chamfered portion mating with back seat bush in fully open condition.
We are learnt well about the valve testing , like body testing, pressure testing or seat leakage test. And backseat test exclusive for gate valve and globe valve. Thanks lot sir. Please make more videos.
The amazing explanation i have never seen such kind of explanation before. Awesome thanks, sir. Please could you explain some of the valves identify Field Valve Test .These valves should be tested on site also as per Aramco STD. may be the reason for double checking, there is the possibility of valves may be slightly damaged during the transportation or any other reason. Do you have any idea or experience about such kind of critical valve should be tested in site. Even if already done all the tests in Shop. Please explain verbally. Thanks, sir may be below the valve please explain this under site test TSO control valves, crude recycle PV, min flow recycle valves, suction KODs LCV, hot oil ring spill back CV), MOVs that are used for equipment or train/system isolation they must be tested. Testing shall include at least the DBB and not only single valve. please dedicated post on this topic. thanks
After purchasing the valves from the vendor and keeping them in warehouse for six months, we are not able to install them at the site due delay of activities , in this situation if more than 6 months, the valve whether need to test again before installing to site.
It has been refreshing for us to keep watching your videos on TH-cam for the past few weeks.We all kindly request you to keep making and posting such piping related videos and at least you should post more than one video per day.
very useful....i was doubtful with back seat testing....now its clear
Nailed it sir. But for seat test test and backseat test you have written 1.5times instead of 1.2. very happy to post videos often.my humble you to Keep on continuing
Thank you Sir for new and very nice videos
I am very happy with this videos, please prepare a video about valve trimes and trim materials.
Best regards
Good explanations & easy to understand pratically.
Thank you for the video. Beautiful one.
For backseat test of gate or globe valve, the valve should have a back seat bush and the valve should be in fully open condition. With spindle chamfered portion mating with back seat bush in fully open condition.
I humbly request you to keep posting more piping related videos. Thanks
We are learnt well about the valve testing , like body testing, pressure testing or seat leakage test. And backseat test exclusive for gate valve and globe valve. Thanks lot sir. Please make more videos.
Awesome explain about the pressure testing for GV. thanks you so much
Very informative
Sir your this video helped me a lot to understand
Wonderful explanation...!!
Brilliant explanation.
The amazing explanation i have never seen such kind of explanation before. Awesome thanks, sir. Please could you explain some of the valves identify Field Valve Test .These valves should be tested on site also as per Aramco STD. may be the reason for double checking, there is the possibility of valves may be slightly damaged during the transportation or any other reason. Do you have any idea or experience about such kind of critical valve should be tested in site. Even if already done all the tests in Shop. Please explain verbally. Thanks, sir may be below the valve please explain this under site test TSO control valves, crude recycle PV, min flow recycle valves, suction KODs LCV, hot oil ring spill back CV), MOVs that are used for equipment or train/system isolation they must be tested. Testing shall include at least the DBB and not only single valve. please dedicated post on this topic. thanks
Very useful
What is control valve Seat leakage Calculation Formula.
Sir plz explain the procedure of Hydro DBB (double block & bleed ) test
How clamping pressure of a valve is determined from shell test pressure ?
Good description
After purchasing the valves from the vendor and keeping them in warehouse for six months, we are not able to install them at the site due delay of activities , in this situation if more than 6 months, the valve whether need to test again before installing to site.
Can piston lift check valve be used in Cryogenic flow ?
Yes, can be used.
Dear sir, kindly please share that chart testing which is you highlighted 🙏🙏
Useful
Thank you sir
Thanks