Piping Engineering : Valve Testing - body, seat, backseat & seat pneumatic

แชร์
ฝัง
  • เผยแพร่เมื่อ 26 ธ.ค. 2024

ความคิดเห็น • 17

  • @sen-ow7ub
    @sen-ow7ub 2 ปีที่แล้ว +2

    Very nice video you have explained with very basic simple practical explanations I have never seen such a clear video with such explanations. in future we all request you to keep sharing such excellent video.

  • @jose941978
    @jose941978 ปีที่แล้ว +1

    Truly detailed and precise explanation

  • @heshammatoug4860
    @heshammatoug4860 2 ปีที่แล้ว +2

    Hi Gouri
    We need you to explain to us how to inspection test plan for valves
    Thanks 🙏

  • @CarlosAndresRomeroToscano
    @CarlosAndresRomeroToscano ปีที่แล้ว

    Excelente video. Muchas gracias

  • @rajeshmavia5424
    @rajeshmavia5424 2 ปีที่แล้ว +2

    Thank you so much sir.. belated teachers day wishes. For bigger size valves, how we lift weight and test will be done in larger test benches ah sir?

  • @aghilmoghbeli7626
    @aghilmoghbeli7626 2 ปีที่แล้ว +1

    Very good video

  • @akurathinaveenkumar
    @akurathinaveenkumar 5 หลายเดือนก่อน

    Can you please send the drawing of air-hydro test bench... please

  • @rajeshmavia5424
    @rajeshmavia5424 2 ปีที่แล้ว

    Pneumatic pressure 5.5 bar is mandatory sir? Or we can go beyond or reduce this pressure level

  • @ajay_constantine
    @ajay_constantine 6 หลายเดือนก่อน

    Sir during the seat testing shouldn't the valve be in horizontal position? Because even if there is any tiny leak which is in the acceptable range we could identify it easily?

  • @SrinivasArapureddyThammarao
    @SrinivasArapureddyThammarao 8 ชั่วโมงที่ผ่านมา

    Safety ladu testing

  • @raviv9157
    @raviv9157 2 ปีที่แล้ว

    Dear Sir, Why gland bolts are loosed incase of hydro testing which is not going to do when valve installed in the line in the industry?

    • @gourisankarsamanta7670
      @gourisankarsamanta7670  2 ปีที่แล้ว +1

      Gland bolts are loosened only during backseat testing to ensure that there is no leakage through the gland so that at site when the valve is under operation, gland packing can be removed or replaced without closing the valve.

  • @SrinivasArapureddyThammarao
    @SrinivasArapureddyThammarao 8 ชั่วโมงที่ผ่านมา

    No

  • @shika-ri
    @shika-ri 10 หลายเดือนก่อน

    Sir , as per API 598 during shell test valve shall be partially open but your valve is fully open , can you explain why?

    • @gourisankarsamanta7670
      @gourisankarsamanta7670  10 หลายเดือนก่อน +1

      During valve body or shell testing, valve can be kept partially open or full open. Requirement is, valve body and bonnet should be pressurize together.