Micromine Variogram Modelling 3

แชร์
ฝัง
  • เผยแพร่เมื่อ 28 ธ.ค. 2024

ความคิดเห็น • 8

  • @ruztdaloccozz
    @ruztdaloccozz ปีที่แล้ว

    Theres no leapfrog modeling sir?

    • @ronreid5702
      @ronreid5702  ปีที่แล้ว

      No, these are for Micromine. At the time LF could not do this, perhaps when I get the time I can do some models using Leapfrog.

    • @ruztdaloccozz
      @ruztdaloccozz ปีที่แล้ว

      @@ronreid5702 thank u sir, realy apreciate that u can make leapforg tutorial. I wonder to know about design resolution in leapfrog, in my case i want to model the mined open pit, but the pit model is not precise both using deposit n intrusion, can u help me with that sir? Thanks..

    • @ruztdaloccozz
      @ruztdaloccozz ปีที่แล้ว

      @@ronreid5702 one more thing, in my case the resolution of geological model cant be set to 1, its max at 1.5, theres solution for this case sir?

    • @ronreid5702
      @ronreid5702  ปีที่แล้ว

      @@ruztdaloccozz for leapfrog, the maximum resolution you should use is 1:1000. If the longest edge of the model is 1000m long, 1m is the finest triangle resolution you should use. Better if it is 2 or 5 m, else the model can become too big to handle. It seems like you are trying to get a resolution finer than the software can handle.

    • @ruztdaloccozz
      @ruztdaloccozz ปีที่แล้ว

      @@ronreid5702 okay sir thats my problem, by the way my pit area is 10.000.000m2 its not possible to make resolution 1, maybe do u have the solution to solve this problem sir? Because i need to cut my geological model using open pit design.