    In this video, we are explaining the RATE ANALYSIS of EARTHWORK EXCAVATION
    Session covers :
    1. BOQ and AOR explanation ( Earthwork excavation: DAR no: 2.6.1)
    2. Client Analysis of Rate and their standard output coefficient.
    3. Contractor Rate analysis as per as Market Rate and CPWD AOR 2019
    4. Time calculation to complete earthwork excavation with resources available at contractor site with respect to AOR output and coefficient.
    which is very important for all civil engineers for the preparation of BOQ, at the time of tender bidding quotation time from the contractor side, and at the time of Bill Preparation.
    Rate Analysis: It is a determination of construction work’s activities cost per Unit wise including the contractor profit+water charge + tax% + misc.
    Earthwork excavation rate analysis on the basis of CPWD AOR 2019.
    In this session, we describe a detailed analysis of Rate, CPWD 2019 in detail.
    the standard output of Hydraulic Excavator = 30 cum per hour
    standard working hours in a day = 8 hours
    in 1 day total excavation = 8*30cum = 240 cum
    for 1 cum, Hydraulic excavator will take how many days?
    8 hours ( 1day )=240 cum
    1 cum = ( 1 day /240 )
    0.0041 day
    10 cum = 0.041 day
    for 10 cum excavation, Hydraulic Excavator takes 0.041 day
    Why rate analysis is important?
    Rate analysis is important because of the following reason:
    1. Client required to do rate analysis for the preparation of BOQ (Bill of Quantities )
    2. Contractor required to do rate analysis for the tender bidding or Rate quotation against the client BOQ rates
    3. Contractor required to do rate analysis for the bill preparation time.
    In rate analysis, we calculate the involvement of Material, Manpower, Machineries total cost including water, electricity charge +Contractor profit + tax + misc. as a grand total cost for particular activities following to divide the total grand cost of activity by total quantity of activity or item.
    The requirement to do Rate Analysis :
    1. BOQ
    2. AOR ( Analysis of Rate )
    3. Market Rate
    #civilengineer
    #Quantitysurveyor
    #siteEngineer
    #rateanalysis
    #client
    #contractor
    #civilengineering
    #rateanalysis
    #Construction
    #buildingProject
    #QuantitySurveyor
    #billingengineering
    #Analysisofrate
    #EarthworkExcavation
    #excavationRateAnalysis
    #ExcavationRateAnalysis
    Related videos :
    • What is RATE ANALYSIS ... what is Rate Analysis?
    Download NOW: Reinforce Civil Engineers Learning App
    👉🏻Android App Version: play.google.co...
    👉🏻IOS Version: apps.apple.com...
    Org code : avywj
    👉🏻Web Version: https:web.reinforceqs...
    For assistance and Queries you may call or whatsapp at +919711155585 , 9958731610
    For more updates join us
    Telegram Channel: t.me/joinchat/...
    Call or WhatsApp at +919711155585
    Follow Us on; Facebook : / reinforceqstpl
    Instagram : / reinforce_qst
    Twitter : / reinforce_qstpl

ความคิดเห็น • 91

  • @adityapatra6834
    @adityapatra6834 3 ปีที่แล้ว +5

    Till now days I have read BOQ rate only, but today I Learned it's calculation method. Thank you Sir.

  • @gunvitsingh3371
    @gunvitsingh3371 3 ปีที่แล้ว +4

    Best Faculty For Rate Analysis Need More Lectures From This Institute

  • @rishijha4209
    @rishijha4209 3 ปีที่แล้ว +5

    Different class among all others. Always easy to understand through your lecture

  • @ddwibedi1
    @ddwibedi1 3 ปีที่แล้ว +3

    Best lecture on earth work rate analysis

  • @kunalarora5699
    @kunalarora5699 3 ปีที่แล้ว +3

    Best topic in best way of lecture

  • @nahidakhtar-od2qo
    @nahidakhtar-od2qo 7 หลายเดือนก่อน +1

    Nishant sir is the best planning teacher

  • @ermdsaif1992
    @ermdsaif1992 3 ปีที่แล้ว +3

    Your teaching way i never saw like this. Be a civil engg i can say best professional inst. Is reinforce....thanks sir for share a great knowledge to here.

  • @shilpapant3224
    @shilpapant3224 3 ปีที่แล้ว +3

    Easiest explanation sir.Thank you sir

  • @govindsoni5095
    @govindsoni5095 3 ปีที่แล้ว +3

    Nice to see rate analysis for excavation

  • @vikramkaushik3176
    @vikramkaushik3176 3 ปีที่แล้ว +3

    Sir i watched complete 43minute session .very informative

  • @rakeshkumaryadav1025
    @rakeshkumaryadav1025 3 ปีที่แล้ว +8

    8/240=.033, आप द्वारा .0041बताया गया है।

    • @ReinforceInstitute
      @ReinforceInstitute  3 ปีที่แล้ว +6

      rakesh , 8 hours ( 1 day ) ,,,,,, so 1/240 = 0.0041 day..... for 10 m3 = 0.041day

    • @ReinforceInstitute
      @ReinforceInstitute  3 ปีที่แล้ว +4

      Thanks for your concern
      Regards

    • @rakeshkumaryadav1025
      @rakeshkumaryadav1025 3 ปีที่แล้ว +1

      @@ReinforceInstitute Right sir.Thank You

    • @ReinforceInstitute
      @ReinforceInstitute  3 ปีที่แล้ว +2

      @@rakeshkumaryadav1025 welcome.. Keep watching
      Thanks

  • @shahidbhat3475
    @shahidbhat3475 3 ปีที่แล้ว +3

    Best teacher and Best training institute ❤️

  • @priyankatrivedi1820
    @priyankatrivedi1820 3 ปีที่แล้ว +1

    Your teaching skill is the best 👍👍

  • @girishgiri2620
    @girishgiri2620 3 ปีที่แล้ว +1

    Awesome sir can I easily understand

  • @piyushchauhan4381
    @piyushchauhan4381 3 ปีที่แล้ว +3

    Awesome Sir 🙏

  • @mohdsaleem-dt7qp
    @mohdsaleem-dt7qp 4 หลายเดือนก่อน

    very informative video, explained in detail.

  • @souravsutradhar6260
    @souravsutradhar6260 3 ปีที่แล้ว +3

    Awesome 👍👏

  • @MPKUMBAR
    @MPKUMBAR 6 หลายเดือนก่อน

    Excelent sir

  • @FactsTezNilesh
    @FactsTezNilesh 2 ปีที่แล้ว

    I am so happy . thank you so much SIR , thank you for taking this video .

  • @shashankaswal9715
    @shashankaswal9715 2 ปีที่แล้ว

    For me this channel is blessing🙏🏻

  • @MyWorld-dw7wd
    @MyWorld-dw7wd ปีที่แล้ว

    Nice video

  • @archanathakur3832
    @archanathakur3832 ปีที่แล้ว +1

    At around 14:10 in this video you had divided 8 by 240 it should be 1/240 as we are considering 1 cum excavation in how many days not hours

  • @alam443
    @alam443 ปีที่แล้ว

    Very simple Sir, Thanks

  • @shivrajsinghgurjar9886
    @shivrajsinghgurjar9886 2 ปีที่แล้ว

    I like this session so much

  • @karmveersingh6616
    @karmveersingh6616 2 ปีที่แล้ว

    Good decision and excellent explanation sir

  • @nareshpillai3449
    @nareshpillai3449 2 ปีที่แล้ว

    सर नमस्कार, बहुत अच्छा सर ।

  • @Unknown16547
    @Unknown16547 2 ปีที่แล้ว

    Wonderful session

  • @funtuber4078
    @funtuber4078 2 ปีที่แล้ว

    Best lecture sir 🙏

  • @amitka1234
    @amitka1234 ปีที่แล้ว

    Very nice.

  • @awadheshkumarmaurya2818
    @awadheshkumarmaurya2818 11 หลายเดือนก่อน

    thanks sir for analysis, please a make video on DBM AND B.M analysis, where Tipper cartage on plant lead, I could not understand the logic on DATA BOOK.

  • @tanmoyghoshal19
    @tanmoyghoshal19 2 ปีที่แล้ว +1

    Can you explain what will mate & collies will do?

  • @digitalbharat1576
    @digitalbharat1576 2 ปีที่แล้ว

    Very very helpful vedio

  • @SANDEEPKUMAR-mh4we
    @SANDEEPKUMAR-mh4we ปีที่แล้ว

    Awesome..

  • @archanathakur3832
    @archanathakur3832 ปีที่แล้ว +1

    My 2 queries are:
    (i) When the 10 cum is already been excavated by machine then y deployment of labour for same qty of excavation is taken in calculation.
    Work is overlapping when it is already done by machinery.
    In item particular's its already mentioned mechanical means *or* manual means then why by both means it's rate is calculated
    If done by machinery, dressing and loading excavated materials can be done by labours but u told in this calculation labours also doing excavation of 10 cum.
    *1 work by both ways and adding up both ways, why not separately.*
    (ii) Why Contractor profit is calculated after gst addition?

    • @ReinforceInstitute
      @ReinforceInstitute  ปีที่แล้ว +1

      1.in excavation work done by means of mechanical also labours are also involved for compaction or deposition purpose.
      Gst is not any profit it's tax imposition by the govt.
      As a contractor side you have to considered as your contractor profit in every items as govt. /Client also includes the contractor profit in their rate analysis (BOQ) .
      BECAUSE we are doing rate analysis also for bidding against client rates .
      Thanks

    • @archanathakur3832
      @archanathakur3832 ปีที่แล้ว

      Exactly sir my query was same, its tax imposition by Government then why after adding up both (GST & Amount obtained from rates calculation) the contractor profit is lastly calculated over both. It would have been calculated on final rate amount obtained exclusive of gst.

  • @sachinparashar4974
    @sachinparashar4974 2 ปีที่แล้ว

    Helpful..🙏❤️

  • @sanjaykamdar7054
    @sanjaykamdar7054 2 ปีที่แล้ว

    Best video.please make rate analysis for other items too. 🙏🙏

  • @civilsiteknowledge3261
    @civilsiteknowledge3261 2 ปีที่แล้ว

    Very helpful sir god bless you
    Sir plz make vedio for BBS all type structure and quality control for highway

  • @ashishsihorecivilengineera5399
    @ashishsihorecivilengineera5399 2 ปีที่แล้ว

    Thankyou sir ji

  • @804Lover-win
    @804Lover-win ปีที่แล้ว

    Sir excellent one think you.can explain tractor and blade quantity...

  • @rajveer.272
    @rajveer.272 ปีที่แล้ว

    Surplus of dispusal ka rate includes hota yaa alag se hota tu kya condition hoti plz.explane

  • @prasannapradhan3371
    @prasannapradhan3371 20 วันที่ผ่านมา

    Which. Collection market rate?

  • @yashovardhansingh3817
    @yashovardhansingh3817 2 ปีที่แล้ว

    Super

  • @gautamkumarsingh1700
    @gautamkumarsingh1700 2 หลายเดือนก่อน

    8 hour daily excavator run hoga then 80 litre diesel consumption hoga aur uska cost @ ₹90 per litre=7200 aur govt excavator+ driver+diesel mila kar just 7000 deti hai???

  • @LalitKumar-xw4yh
    @LalitKumar-xw4yh 2 ปีที่แล้ว

    According to your calculation
    Working hour 8days avg.
    Then excavator cost =8*12800=102400
    Loader =8*8000=64000
    Mate =8*(4*500)=16000
    Coolie =8*(6*400)=19200
    Sum of these
    [102400+64000+16000+19200]=201600= घाटे का सौदा

  • @sharadbarman6491
    @sharadbarman6491 3 ปีที่แล้ว +1

    Sir jab machinery work se excavation hoga to cookie and mate kyo involve ho rahe hai ?

    • @ReinforceInstitute
      @ReinforceInstitute  3 ปีที่แล้ว

      for proper dumping of excavated soil

    • @manjunathmalipatel8249
      @manjunathmalipatel8249 2 ปีที่แล้ว

      sir can u clarify Mate and coolie considered on which category of work .Mate and coolie for dumping (helper of machinery) or for some other work like dressing or for somewhere manual excavation required.if we considered this labour for machinery helper it is ok for taking an avg ,but if we considered labour perticularly for earth work,time calculation average will not work I think .because the coefficient for manpower and material will be different.

  • @VikramSingh-fe2so
    @VikramSingh-fe2so ปีที่แล้ว

    Canal ka kaam kis price par le

  • @karanparihar6392
    @karanparihar6392 หลายเดือนก่อน

    Rate analysis Electrical Planing ka banao sir

  • @Abhishekkumar-lu1le
    @Abhishekkumar-lu1le 3 หลายเดือนก่อน

    Sir earthwork ka rate analysis karaiye please

  • @sabiransari2842
    @sabiransari2842 ปีที่แล้ว

    Rate analysis me water charges kyo add karte hai

  • @regalgamingyt2829
    @regalgamingyt2829 ปีที่แล้ว +1

    Sir can u please make a video on additional lift as per cpwd... For trenches and pits

  • @prasannapradhan3371
    @prasannapradhan3371 20 วันที่ผ่านมา

    Market rate kaha milega

  • @Civilengineermahendrakumar
    @Civilengineermahendrakumar ปีที่แล้ว

    Only Survey Wrok ka Rate pr video bnaiye sir am Senior Surveyor 8years experience

  • @amanpathan9730
    @amanpathan9730 2 ปีที่แล้ว

    Ye mate and coolie ka coefficient kaise aaya
    pls explain

  • @tetheronegaming820
    @tetheronegaming820 2 ปีที่แล้ว

    Bhai 10m3 ka 1818.302 ko 10 se divide karne pe 181.302 aana chahiye max after digit round off would be 181.30 or 181.3 n not 181.35

  • @civilengineers5794
    @civilengineers5794 6 หลายเดือนก่อน

    Hello Sir , Ye DAR 2023 me 10m3 ka 0.080 per day ho gya hae ... ye kese hua hae ?? jbki 1 hour excavator 30 cum hi hae ?? or coolie or mate ka bhi 0.04 &0.06 ho gya hae ..
    How ??

  • @hokhetoachumi2063
    @hokhetoachumi2063 9 หลายเดือนก่อน +1

    8/240 IS 0.03333

  • @satyamjoshi5132
    @satyamjoshi5132 3 ปีที่แล้ว +1

    What is difference between AOR and SOR?

    • @ReinforceInstitute
      @ReinforceInstitute  3 ปีที่แล้ว +2

      SOR stands for Schedule of Rates , In SOR government rates of item is given while AOR stands for Analysis of Rate in which how the rate of particular item came , the detailed rate analysis of particular item which will be given in SOR , In SOR only item rate is given but in AOR the detail rate analysis of that item will be.
      Regards
      Thanks

    • @shababimran
      @shababimran 2 ปีที่แล้ว

      @@ReinforceInstitute Sir..how you fix the rate of excavator and loader to be 7k and 5k??bcz it varies from state to state

  • @syedaamir9997
    @syedaamir9997 ปีที่แล้ว

    Bhaibaap jabardast teaching vjrte hu pls no apna dijiye

  • @vikasranaut5605
    @vikasranaut5605 5 หลายเดือนก่อน

    I have a question sir
    How 8/240 = 0.0041 it's 0.0333
    In actual
    10/240 = 0.041

  • @abdulrehmancivilengineer1385
    @abdulrehmancivilengineer1385 2 ปีที่แล้ว

    Mujhy samjh nhi ati k jb hm anylasis government k hisab se krty hn to phr estimate ammount se above ya below kesy jaty hy mtlb jo rate government ka hy hm usi ka anylasis kr rahy hn na k apna khud ka market rate lgaty hn

    • @ReinforceInstitute
      @ReinforceInstitute  2 ปีที่แล้ว

      Coefficient standard govt ka rakhte h rate market rate lgate h if you are working for contractor...but if you are working fr client rate govt ka standard lgate hain ,

  • @user-wj1ug8fz7j
    @user-wj1ug8fz7j 2 หลายเดือนก่อน

    Print date on reels.

  • @maniruddha
    @maniruddha 4 หลายเดือนก่อน

    1) What is the use of Mate and Coolie for excavation with excavator ? They are used only for the final surface dressing of soil. The excavator cant excavate upto the desired level with required accuracy. Then why are you consider 1000 cum or 10 cum of cutting for the Mate and Coolie ? Their volume of excacation should be much less than the volume excavated by the excavator, isn't it ?
    2) You considered 4 Mates with 6 coolies. What is the function of a Mate ? To my knowledge, Mates don't excavate earth. They supervise the work. So, 1 Mate can handle about 30 - 40 Coolies. So, what's the use of 4 Mates with 6 Coolies ?
    Please answer.

  • @1982yogendra
    @1982yogendra 4 หลายเดือนก่อน

    8/240= 0.0333

  • @baljindermavi17
    @baljindermavi17 ปีที่แล้ว

    Hi

  • @moaliali5565
    @moaliali5565 10 หลายเดือนก่อน

    1 chis ko bar bar kiu bol rahe he sir

  • @lifegoeson81122
    @lifegoeson81122 2 ปีที่แล้ว

    Sir its 8/240=0.041.i think its 1/240

  • @munfaidalikhan2339
    @munfaidalikhan2339 ปีที่แล้ว

    Bro 8/240=0.03333

  • @SaifulIslam-fd6gu
    @SaifulIslam-fd6gu 3 ปีที่แล้ว

    Pagol ho kya....par ke suna raha ho... explanation koro....kyu GST 14.06% hua...... instead of 12%

    • @ReinforceInstitute
      @ReinforceInstitute  3 ปีที่แล้ว

      Gst % govern by Government of India not by us.
      Please go throughout the session.
      Why did government imposed 14% Gst ?
      Different Gst % slab for different items that depends upon government.
      Regards

  • @ashishsihorecivilengineera5399
    @ashishsihorecivilengineera5399 2 ปีที่แล้ว

    Nice video

  • @manishpathrod3866
    @manishpathrod3866 2 ปีที่แล้ว +1

    Sir mujha ap ya sheet send kar sakta ha