HEAVY DUTY EQUIPMENTS - Assembling Process All-terrain Crane. Installation of Offshore Wind Farm
ฝัง
- เผยแพร่เมื่อ 17 ส.ค. 2023
- HEAVY DUTY EQUIPMENTS - Assembling Process All-terrain Crane. Installation of Offshore Wind Farm
0:05. Grove GMK-6400 All-Terrain Crane
1:55. AC 1000 Crane Wind Turbines
4:23. SPMTs for Offshore Wind
8:25. Veja Mate Offshore Wind
12:08. Liebherr LR 1600/2W Crane
16:01. Linden Comansa Advantages
18:21. Wikinger Offshore Wind Installation
What does it cost to change all the tires on one of those lol
Brave tern WTIV, basic design Gusto MSC (NL), detail design ICEPRONAV (RO), build Sarjah (UAE)?
Балшой кран
Transport weight of 11te?? Where does that number come from? You need to check your facts.
that is the mega wing stats; had to download the pdf
Ami Bangladesh
Ok 🎉
They built new turbines and now they don’t know where to get gas
they
I hate computer voices.
Da werden wir uns dran gewöhnen müssen. Es scheint für das menschliche Gehirn scheinbar nicht so einfach zu sein, einen Text zu lesen