ไม่สามารถเล่นวิดีโอนี้
ขออภัยในความไม่สะดวก

Replacing a double glazed unit (externally glazed)

แชร์
ฝัง
  • เผยแพร่เมื่อ 1 ก.ค. 2018
  • I hadn't replaced a double glazed unit before. In the first 5 minutes I talk through what I did and found out as I worked on the job. Skip this if you just want to see some clips and then you can go back to the start if you think the extra info will help you.

ความคิดเห็น • 8

  • @darrenpauling6155
    @darrenpauling6155 3 ปีที่แล้ว +3

    Why on earth did you cut the video where it actually showed you taking out the beading. Almost exactly the same beading i'm having a problem with. Except my is a full door unit thats been in place for at least 22 years. At this moment i can see myself damagin the UPVC, either the beading or the frame. At this moment i'm thinking about using packers to slowly prise the beading from opening. Anyway how did you finaly get the first beading open????????

    • @christhomas9753
      @christhomas9753 3 ปีที่แล้ว

      Take the rubber gasket out from the inside of the window, this helps with the beading being removed as you can move the unit slightly

    • @darrenpauling6155
      @darrenpauling6155 3 ปีที่แล้ว

      @@christhomas9753 Cheers Chris, figured it out a few months ago. Now need the proper beading for the UPVC as the old stuff is brittle and useless. Thanks again anyway

    • @NAFO_Badger_Brigade
      @NAFO_Badger_Brigade ปีที่แล้ว +1

      ​@@darrenpauling6155did u have much luck finding replacement beading!

  • @johnmurray9422
    @johnmurray9422 3 ปีที่แล้ว +1

    had to fast forward to avoid 5 minutes of hesitant waffle so I could get to the bit that matters

  • @atommachine
    @atommachine 2 ปีที่แล้ว +2

    need the first bead you cut it. pointless video.

  • @PaulSmith-up4mo
    @PaulSmith-up4mo 3 ปีที่แล้ว +2

    Not very good