G+4 building Designing as per DEWA Regulation--- Part-4
ฝัง
- เผยแพร่เมื่อ 2 เม.ย. 2024
- Distribution of light load inside flats and Common Area
Distribution of power load inside Flats and Common Area
Circuit formation of light and power load
HVAC load distribution and circuit formation
Plumbing load
fire fighting load
load schedule preparation of FDB
load schedule preparation of SMDB's.
oad schedule preparation of MDB
SLD preparation
load cand preparation
Voltage drop calculation
stand by Generator Rating Calculation
Transformer size calculations
#dewa #dewa19 #dewa #design #g+4 #regulation2017 #regulation
I appreciate your hard work plz also make same plan according to the ADDC regulation
Thank you sir ...Appreciated
Most welcome
Please make video of all power requirements for a building :eg damper in corridor, csef, cmaf, pressurization fans, fahu , ahu , basement fans, lift power, chiller, all types of pumps,flux outlet for Mep including elv , etc
All will be covered one by one in G+4 building designing video
@@electricalconcept32 please design basement power requirements also
Why did you provide LCP with 150W. LCP should be for Light control right? It's not a load
LCP is a controller which requires 230 volt power supply. It need some power consumption to run its controller timers . Yes some time it could be as less as 25 watt .