Marr M2480D Installation on Brisbane's Kangaroo Point Bridge

แชร์
ฝัง
  • เผยแพร่เมื่อ 25 ก.พ. 2023
  • Brisbane, Australia - Marr Contracting has been awarded the subcontract for specialized heavy lifting services on the Kangaroo Point Bridge. Spanning 460 meters, the bridge will be among the world's longest span cable-stayed pedestrian bridges.
    Marr's M2480D Heavy Lift Luffing tower crane installed on a platform in the middle of Brisbane River, is key to lifting heavy components including the180-tonne pre-fabricated mast head to 95 meters - an engineering feat that would have been impossible using crawler cranes.
    KEY HIGHLIGHTS:
    ⦿ 460m long cable-stayed pedestrian bridge in Brisbane.
    ⦿ Utilizing Marr's M2480D tower crane to complete heavy lifts weighing up to 180 tonnes.
    ⦿ Collaborative project with the BESIX Watpac-led Connect Brisbane consortium and Robert Bird Group engineers.
    ABOUT MARR CONTRACTING:
    Marr Contracting specializes in innovative heavy lifting craneage solutions that improve productivity, safety and efficiency on complex major infrastructure projects including bridge construction.
    LEARN MORE:
    ➡ Explore Marr's capability and experience in developing specialist solutions for bridge construction here: www.marr.com.a...
    #marrcontracting #kangaroopointgreenbridge #brisbaneconstruction #heavylifting #infrastructureprojects #craneinnovation #BESIXWatpac #ConnectBrisbane #engineering #towercranes #modularconstruction #robertbirdgroup

ความคิดเห็น •