28km of Light Rail | Eglinton Crosstown Progress Fall 2024

แชร์
ฝัง
  • เผยแพร่เมื่อ 1 ธ.ค. 2024

ความคิดเห็น • 119

  • @alankingchiu
    @alankingchiu 6 วันที่ผ่านมา +57

    Line 5 will open when our grandkids have grandkids.

    • @KM-qx2qi
      @KM-qx2qi 4 วันที่ผ่านมา +1

      True!!!

  • @TheRandCrews
    @TheRandCrews 5 วันที่ผ่านมา +48

    man if Mike Harris didn’t let the construction of a tunnel at Eglinton West be filled in even if the line was cancelled, the Crosstown would’ve been a subway with these major grade separation and having smaller tunnels.
    Funny that a store in Eglinton Square for wall designs for a subway stations that will never get built in Scarborough while also having served by almost three surface stops. That weird island in between O’Connor, Eglinton, and Victoria Park would’ve been a perfect bus interchange station

    • @nathanpaterson9916
      @nathanpaterson9916 5 วันที่ผ่านมา +1

      Kennedy’s looking great. also excited to see how eglinton west, and eglinton Yonge end up looking

    • @harps1974
      @harps1974 2 วันที่ผ่านมา

      TheRandcrews
      You’re a Jackass

  • @Jacorywoohoo
    @Jacorywoohoo 6 วันที่ผ่านมา +83

    This needs to hurry up and open.

    • @ryanramjag6365
      @ryanramjag6365 5 วันที่ผ่านมา +1

      Ok

    • @tommywong3147
      @tommywong3147 5 วันที่ผ่านมา +3

      It still hasn't opened? I thought it was opened 2 years ago?? Was there corruption?

  • @plantguy240
    @plantguy240 5 วันที่ผ่านมา +36

    pretty sure the narrator was 2 years old when they started building this thing.

    • @jimhuynh9135
      @jimhuynh9135 2 วันที่ผ่านมา

      when the narrator retire. The project will still be on going

  • @stephen9609
    @stephen9609 6 วันที่ผ่านมา +47

    So the plaza at Mt Dennis for the unopened line, is being ripped up, so that they can build the extension of an unopened line. You literally can't make this shit up...

    • @Dynamics416
      @Dynamics416 6 วันที่ผ่านมา +10

      You really can't.

    • @thefellows8484
      @thefellows8484 5 วันที่ผ่านมา +13

      But metrolinx can.

    • @Ajibolaa
      @Ajibolaa 3 วันที่ผ่านมา

      They took so long that they had created a better route in the time they wasted 😂😂😂😂 construction will never end in Ontario 😂😭

    • @Ajibolaa
      @Ajibolaa 3 วันที่ผ่านมา

      @@thefellows8484😂

  • @morganjo2002
    @morganjo2002 5 วันที่ผ่านมา +30

    The true start date of this mess was in the mid-90's when then-premier Harris cancelled the Eglinton subway - I remember driving around a series of holes that were already dug for that project which is really this project.

    • @XandateOfHeaven
      @XandateOfHeaven 5 วันที่ผ่านมา +10

      Jesus Christ, I remember when Mike Harris closed my elementary School decades ago. I can't believe we're still dealing with his bullshit.

    • @morganjo2002
      @morganjo2002 5 วันที่ผ่านมา +4

      @@XandateOfHeaven Thanks for that info - there's also the mess called Hwy. 407 - Harris basically gave it to the builder and that's why tolls are too high to get most drivers to use it instead of Hwy 401.

    • @EVIL-C
      @EVIL-C 4 วันที่ผ่านมา

      @@XandateOfHeaven ​ @morganjo2002 Harris truly was the worst. 30 years later, we're STILL being negatively effected by his bullshit. Politics matters, people. Next to go must be slug ford.

    • @EVIL-C
      @EVIL-C 4 วันที่ผ่านมา +1

      @@morganjo2002 Harris truly was the worst.

    • @sammavitae114
      @sammavitae114 4 วันที่ผ่านมา

      @@EVIL-CAnd now he’s chairman of long term care homes.. shutting public options and super charging private care homes so that boomers won’t have any money to pass onto their kids.

  • @Dynamics416
    @Dynamics416 6 วันที่ผ่านมา +10

    Thanks for the update, Jamie. Another well done video. Line 5 looks solid, just frustrating it still isn't opened yet for people to use.

  • @ant8504
    @ant8504 5 วันที่ผ่านมา +13

    there has been signage going up announcing that the bus route changes for this line are taking effect soon, hopefully this indicates we're approaching that last 3 month window

  • @jimeditorial
    @jimeditorial 4 วันที่ผ่านมา +6

    Shocking that no one will be held responsible for this mess

    • @nanaokyere7141
      @nanaokyere7141 4 วันที่ผ่านมา

      Doug Ford and his corruption team will make sure nobody gets touched or be held responsible for this for sure.

  • @jdurk
    @jdurk 6 วันที่ผ่านมา +12

    The notif dropped right as I was thinking of this 😂

  • @Fallentc
    @Fallentc 59 นาทีที่ผ่านมา +1

    When does the city expects to award the West Expansion? Is WestEx consortium the same group that is constructing the East portion?

  • @avalons343
    @avalons343 6 วันที่ผ่านมา +4

    Great video! been waiting for an update for a while.

  • @blava3155
    @blava3155 6 วันที่ผ่านมา +3

    Thanks for the video! Very detailed and comprehensive.

  • @bored1ca
    @bored1ca 5 วันที่ผ่านมา +9

    At the rate they're going, the Toronto Maple Leafs might win the Stanley Cup before this opens...

    • @geofflepper3207
      @geofflepper3207 2 วันที่ผ่านมา +1

      Now you're going too far.
      Lol.

    • @bored1ca
      @bored1ca 2 วันที่ผ่านมา

      @@geofflepper3207 🤣🤣🤣🤣🤣

  • @carlinthomas9482
    @carlinthomas9482 5 วันที่ผ่านมา +7

    Unpopular opinion: The eastern surface portion of the line should probably be shut down at some point in the future if it proves too slow and rebuilt fully grade separated with some of the close stops being removed (IE: Hakimi-Lebovic).

    • @nanaokyere7141
      @nanaokyere7141 4 วันที่ผ่านมา +4

      Not unpopular, logical. The surface section in Scarborough could be as slow as Spadina streetcars. I just don't understand why the city REFUSES to give the TTC signal priority, when this section should be rapid and not running at turtle neck speed.

    • @carlinthomas9482
      @carlinthomas9482 4 วันที่ผ่านมา +4

      @@nanaokyere7141 Thanks. I used to ride the Eglinton bus on that portion, the bus was so slow and the new LRT will probably be nearly as slow as the bus. The people in that area deserve rapid transit.

  • @zoolander0700
    @zoolander0700 วันที่ผ่านมา

    Thank you for making this update video

  • @carrrlooooo
    @carrrlooooo 5 วันที่ผ่านมา +6

    This is embarrassing and disgraceful. Only in this country do you see this kind of rubbish planning and construction that what we call the third world is excelling at. Fantastic video you put together. Keep up this amazing work. Its better than what our 'experts' are capable of doing

  • @katey9547
    @katey9547 5 วันที่ผ่านมา +5

    All these 15 stations are near the finish line

  • @nanaokyere7141
    @nanaokyere7141 4 วันที่ผ่านมา +1

    We NEED to protest this line ASAP. No more delays or excuses. Also, when this line opens, they need to fire the CEO of Metrolinx, Phil Verster. We've been waiting 14 YEARS and in that same time span, his pay has gone up SIGNIFICANTLY. Ridiculous and insulting.

  • @davidhughes6048
    @davidhughes6048 3 วันที่ผ่านมา

    Looking forward to my ashes being carried on the inaugural run!

  • @wvxwho
    @wvxwho 3 วันที่ผ่านมา

    Extremely informative and well done video!

  • @BmanTheChamp
    @BmanTheChamp 5 วันที่ผ่านมา +1

    Great, we can look forward to this extension opening in 2075.

  • @hdlim8753
    @hdlim8753 4 วันที่ผ่านมา +1

    this line started construction in year 2011. I'd be very happy if this rail start operating in year 2111.

  • @ernestdunphy7027
    @ernestdunphy7027 5 วันที่ผ่านมา +4

    When is this blanking thing opening!

  • @nelsoncarvalho6338
    @nelsoncarvalho6338 4 วันที่ผ่านมา +1

    The project that never ends.

    • @jamesdmack
      @jamesdmack 4 วันที่ผ่านมา +1

      It just goes on and on my friend

  • @vidthreenorth4007
    @vidthreenorth4007 5 วันที่ผ่านมา +3

    This video shows a lot of bike lanes, which have become controversial lately. Doug Ford is getting rid of them. I think it is still too early to decide this. Covid-19 has changed transportation usage since about 2020. That's only four years ago -- not enough to evaluate long term effects.

    • @my2iu
      @my2iu วันที่ผ่านมา +1

      The bike lanes on Eglinton didn’t affect car traffic because there hasn’t been any significant car traffic on Eglinton for 10 years. The Crosstown construction made it impractical for anyone to drive on Eglinton.

    • @my2iu
      @my2iu วันที่ผ่านมา

      Also, the city plan was to move all car traffic onto a new adjacent road to the north.

  • @thymadness
    @thymadness 4 วันที่ผ่านมา

    Your video was informative and useful. Than you

  • @TheHk1966
    @TheHk1966 3 วันที่ผ่านมา

    Quick summary: no progress yet but check with us in 5 years time. Thank you and have a great day.

  • @thomasrobinson8336
    @thomasrobinson8336 5 วันที่ผ่านมา +1

    Hey TT Great video. Soon Maybe soon it will be finished

  • @wklis
    @wklis 4 วันที่ผ่านมา

    Because of national and provincial security, the opening date of the first section of Line 5 is withheld, unless you have the needed security clearance.

  • @quantum1953
    @quantum1953 วันที่ผ่านมา

    It's insane the time it's taking to build this thing. Montreal did 70 kilometers and double the station, and two-thirds are already in service. They started at the same time.

  • @pizzamizza2375
    @pizzamizza2375 5 วันที่ผ่านมา +2

    Ah 14 years and still not done

  • @yuconghu2365
    @yuconghu2365 6 วันที่ผ่านมา +1

    I don’t understand why on the surface the transit signal turns red before regular traffic light and does that mean partial TSP will just make it more or less the same frequency as the regular light

  • @80s90smovies.
    @80s90smovies. 4 วันที่ผ่านมา +1

    will open just before the world ends

  • @pacman3556
    @pacman3556 5 วันที่ผ่านมา +6

    They have been testing the trains for over a year now but nobody can ride them yet because that little piece of sidewalk 50ft away from the trains on the other side of the street needs to be dug up and rebuilt every couple of weeks. People just can't ride the train if that little piece of sidewalk is just not right

  • @sammavitae114
    @sammavitae114 4 วันที่ผ่านมา

    By the way the only subway project that was completed on time and under budget was the Sheppard line… completed by TTC only.. no private contractors in charge.

  • @WebVid
    @WebVid 6 วันที่ผ่านมา +1

    Thank you very much Transitthinker. I’m really grateful for your videos.
    Q: Any idea when construction will start on the the GO station at Caledonia? Is there a commitment to building it?

    • @transitthinker
      @transitthinker  5 วันที่ผ่านมา

      Currently I think the plan is to add a single platform soon, double tracking, and the second platform will happen later

  • @whatsitgoingtobetheneh
    @whatsitgoingtobetheneh 5 วันที่ผ่านมา +2

    There is no accountability, and therefore no repercussions for the lack of transparency.
    This project is a cash cow for some lucky people who aren't in any way incentivized to hasten the completion.

    • @EvelynSaungikar
      @EvelynSaungikar 4 วันที่ผ่านมา

      But, good lifetime employment for a lucky few! I expect that people who were apprentices when the project started will be able to retire from it, never having worked anywhere else!

  • @DavidHalverson
    @DavidHalverson 4 วันที่ผ่านมา

    The Eglinton Crosstown Light Rail Transit Network has now taken over a decade to complete. Line 1 subway system which is longer was completed in only 8 years and is 8.3 km in length and its operational. Metrolinx is taking the city and the province for all it can get in money. Expect an increase in transit fares for the Greater Toronto Area.

  • @ctf6420
    @ctf6420 5 วันที่ผ่านมา +1

    What map are you using for the video? It looks cool with future line plans and wayfinding standards

    • @transitthinker
      @transitthinker  5 วันที่ผ่านมา +1

      Working on a more major future map of the Toronto area, used part of it for the video

  • @thespanishinquisiton8306
    @thespanishinquisiton8306 5 วันที่ผ่านมา

    I don't think you can confidently assert that the surface section of line 5 will be faster than the bus it's replacing. Finch West is now expected to be just as fast as the bus on that corridor was before construction started, of course with half as many stops, dedicated lanes, and signal priority, which are all lacking for the bus. And in general, surface trams have a pretty hard average speed limit of 19km/h, with very few systems exceeding that value

  • @lemonlizard1
    @lemonlizard1 5 วันที่ผ่านมา +1

    I really hope the lack of transparency on metrolinx's side is just a one-time thing

    • @my2iu
      @my2iu วันที่ผ่านมา

      Doug Ford ran an entire election campaign where none of the PC candidates were allowed to talk to the press or their constituents. He ran with no platform, no promises besides lowering the gas tax, and didn’t talk to anyone. I think the lack of transparency is here to stay.

  • @pacman3556
    @pacman3556 5 วันที่ผ่านมา +4

    Science Center stop needs to be renamed---- so we are looking at another 5 years for completion with an extra cost of $500M

    • @EvelynSaungikar
      @EvelynSaungikar 4 วันที่ผ่านมา

      Probably something Aboriginal.

  • @andrewlehmann292
    @andrewlehmann292 4 วันที่ผ่านมา

    Could we just force the damn line to open??? Its more finished then line 1 and 2.

  • @johnnylee7064
    @johnnylee7064 4 วันที่ผ่านมา

    It takes so many years to build a subway in a big city. So interesting😂

  • @Qwerty_Iop
    @Qwerty_Iop 2 วันที่ผ่านมา

    You should check out the Finch west LRT

  • @richardc8795
    @richardc8795 5 วันที่ผ่านมา +1

    So this video only serves to taunt us with something that is still not open. Thanks.

  • @karagi101
    @karagi101 5 วันที่ผ่านมา

    One thing that hasn’t changed is it still hasn’t opened after 5 years over its planned opening and the fact we have no clue why it hasn’t opened or when it will open.

    • @marmaly
      @marmaly 4 วันที่ผ่านมา

      Tracks are sinking at Yonge Stn

    • @karagi101
      @karagi101 4 วันที่ผ่านมา

      @ Can you provide a little more detail?

  • @SirThomas1212
    @SirThomas1212 2 วันที่ผ่านมา

    Metrolink is trying to make history, avg building 2km per year completed.

  • @thevikasnam
    @thevikasnam 5 วันที่ผ่านมา +3

    This crap is never opening.

  • @TagumpayManalo
    @TagumpayManalo 3 วันที่ผ่านมา

    i thought they are retiring this now after 14 years in the making including testing LOL

  • @CarlosSensei-q5d
    @CarlosSensei-q5d 3 วันที่ผ่านมา

    Public money sitting there for years. By the time we use it its time to be renovated and updated. Open up at least some of the grass areas outside and sitting areas inside for the public that funded it.

  • @mikedrown2721
    @mikedrown2721 6 วันที่ผ่านมา +8

    The narrator has the "Question Mark Explanation Syndrome"

    • @karagi101
      @karagi101 5 วันที่ผ่านมา +2

      Yes. The way she speaks is as if every sentence is a question.

  • @gregorymckenna6609
    @gregorymckenna6609 4 วันที่ผ่านมา

    Now scheduled to open in 2038

  • @EvelynSaungikar
    @EvelynSaungikar 4 วันที่ผ่านมา

    Can’t at least part of it open? If the whole thing has to wait until all the stations are open, it will never open.

  • @sniffybear2500
    @sniffybear2500 วันที่ผ่านมา

    Remember when they could build a railroad across the whole country in 5 years….And with mostly just humans and draft animals?

  • @brucemacneil
    @brucemacneil 5 วันที่ผ่านมา +1

    The lasting embarrassment of Rob and Doug Ford. A real shame.

  • @stefxc
    @stefxc 6 วันที่ผ่านมา +1

    🔥🔥🔥🔥🔥🔥🔥🔥🔥🔥🔥 !!!EPIC VIDEO!!! 🗣🗣🗣🗣🗣🗣🗣🗣🗣🗣🗣

  • @lassepeterson2740
    @lassepeterson2740 4 วันที่ผ่านมา

    Well lookit the size of the buildings and concrete . A little more of a modest train track coulda cost less and be built sooner .

  • @tristanridley1601
    @tristanridley1601 5 วันที่ผ่านมา +1

    Some parts of phase 1 are already starting to look run down. It's so ridiculous. Don't we pay private companies like this SPECIFICALLY because they're supposed to have prior experience and avoid these kind of delays?

  • @TagumpayManalo
    @TagumpayManalo วันที่ผ่านมา

    end of service life loll

  • @BBP081
    @BBP081 2 วันที่ผ่านมา

    Why do I need to rely on intrepid TH-camrs for information on these projects and not the city?

  • @StephenSmith-zp7pf
    @StephenSmith-zp7pf 3 วันที่ผ่านมา

    What a joke. They built the entire Chunnel in 6.9 years

  • @roblue2647
    @roblue2647 2 วันที่ผ่านมา

    NORTH AMERICA/CANADA, reason for “SLOWER BUILS, IS CORRUPTION!”
    Also “NO CHARGES FOR DELAY OF COMPLETION!”
    CHINA would have completed MANY-MANY KILOMETRES IN JUST A FEW MONTHS.
    WHY?

  • @Eloise-j8s
    @Eloise-j8s 4 วันที่ผ่านมา

    15 years construction, absolutely pathetic, projects like this would have been completed in 2-3 years in Europe and Asia.

  • @privateuser5447
    @privateuser5447 4 วันที่ผ่านมา

    Good info but sounds like speaker has a mouthful of marbles

  • @lc8850
    @lc8850 4 วันที่ผ่านมา +2

    Toronto sucks.

    • @EVIL-C
      @EVIL-C 4 วันที่ผ่านมา

      Then leave.

  • @jamesgrahamrobinson3077
    @jamesgrahamrobinson3077 4 วันที่ผ่านมา

    The British & French built th chunnel 50.46km under the English channel in only 6 years.
    The Eglinton LRT is shorter and has already taken twice as long.
    Someone needs to be fired, Metrolinx is a total waste.

  • @nevilletaylor9761
    @nevilletaylor9761 4 วันที่ผ่านมา

    This project is a complete embarrassment to all Torontonians, many years late, billions over budget and still inoperable. The same applies to the new and also inoperable Finch LRT. Meanwhile the same obviously incompetent provincially owned contractor Metrolinx has started building the subway extension known as the Ontario line. This project is already over budget and expected to be years late. How do we get out of the circle of incompetence? Firing Premier Doug Ford at the next election would be a good place to start.

  • @nahshonimmanuel1704
    @nahshonimmanuel1704 2 วันที่ผ่านมา

    Should have been completely underground and used trains, Torontos planners are country bumpkins with no idea what type of infrastructure is required🤦🏾‍♂️

  • @torccchaser6712
    @torccchaser6712 4 วันที่ผ่านมา +1

    its a joke since 2011

  • @Bigredfitnessmoshe
    @Bigredfitnessmoshe 2 วันที่ผ่านมา

    28km of light fail

  • @harps1974
    @harps1974 2 วันที่ผ่านมา

    What a joke, hope people are getting FIRED after this?!

  • @peterjaniceforan3080
    @peterjaniceforan3080 5 วันที่ผ่านมา

    🚈👍

  • @youbetcha6880
    @youbetcha6880 5 วันที่ผ่านมา

    The whole western extension should be above ground.

    • @andrewpark7242
      @andrewpark7242 5 วันที่ผ่านมา

      People in Dougie riding would be pist hence the underground section in the west

  • @steweslaxe-ts6fg
    @steweslaxe-ts6fg 2 วันที่ผ่านมา

    toronto is a living hell