Is the E5 Shinkansen Train Cancelled for Indian Bullet Train ?

แชร์
ฝัง

ความคิดเห็น • 394

  • @rollsroyce4249
    @rollsroyce4249 3 หลายเดือนก่อน +244

    The government can make whatever train it wants on other routes but Delhi to Mumbai should be a Shinkansen Bullet train running at 300kmph or higher only.

    • @its.Sarthak101
      @its.Sarthak101 3 หลายเดือนก่อน +19

      Or any Indian 300kmph+ train

    • @kabir1934
      @kabir1934 3 หลายเดือนก่อน +38

      ​@@its.Sarthak101No, not possible to build so fast, use Shinkansen e5 and have technology transfer, which Japan is offering

    • @mummy5490
      @mummy5490 3 หลายเดือนก่อน +20

      ​@@kabir1934 India can make if it want, look at china, how they copied japanese nd build their own bullet train

    • @biswajitpattanaik5800
      @biswajitpattanaik5800 3 หลายเดือนก่อน +18

      Sorry will have to disagree! Both E5 & Indian HSR can be run, as is the norm all around the world. E5 as a premium & fast service & Indian HSR as affordable & frequent service. by gaining experience running on MAHSR line, Indian HSR cane further improved & can be used for better overall utilization of the infra!
      Why limit the possibility by having such short sighted views.

    • @biswajitpattanaik5800
      @biswajitpattanaik5800 3 หลายเดือนก่อน +2

      @@kabir1934 Transfer Tech is not 100% nor involves Know Why & only Know How! No country transfers their HSR tech, nor France or Germany nor Japan nor China etc... will have to develop core tech by yourselves.

  • @lodatuhemeini2809
    @lodatuhemeini2809 3 หลายเดือนก่อน +271

    Ham pagal ni h bhaiya hmara dimag kharab hai- indians internet ke 14de

    • @himanshusingh-st7xi
      @himanshusingh-st7xi 2 หลายเดือนก่อน

      Meanwhile Pakistanis blowing lpg's in their balloon (without safe mechanisms) n proper toilets n then lecture indians about sanitations🤡

    • @deepjyotibhattacharjee4582
      @deepjyotibhattacharjee4582 2 หลายเดือนก่อน

      😂

    • @Theabyss456
      @Theabyss456 หลายเดือนก่อน +1

      Yes especially on twitter

  • @fobudomh
    @fobudomh 3 หลายเดือนก่อน +132

    1) Japanese trains are coming
    2) Technology transfer is I think supposed to happen. And I think we cannot export the trains manufactured through their technology.
    3) So India is trying to develop its own high speed trains
    4) We would need 100s of high speed trains. So better to develop our own train sets as its cheaper than importing.

    • @PrinceSingh95577
      @PrinceSingh95577 3 หลายเดือนก่อน +15

      But they are making on steel body not on aluminum so I think they should go for aluminium body train so that once 250 kmph train built then we can increase speed of trains in next version to 300 and with time to 350.........

    • @user-maymay2002
      @user-maymay2002 3 หลายเดือนก่อน +14

      @@PrinceSingh95577 that requires heavy R&D and capital input. A developing nation like India can't afford to do that so easily right away. we'll have to rely on imports until the railway ministry gets adequate budgets to manage this.

    • @PrinceSingh95577
      @PrinceSingh95577 3 หลายเดือนก่อน +8

      @@user-maymay2002 but they already have tender of vande Bharat with aluminium body with 220 speed which was unfortunately cancelled..... but for this kind of high-speed train....they should go for aluminium body.... various foreign companies are there with technology....they can collaborate with any of them....even Alstom can also help them because they are already making various trains of aluminium body for standard gauge

    • @kabir1934
      @kabir1934 3 หลายเดือนก่อน +7

      I don't care, I want Japanese Shinkansen e5 here, we will need too much time to built our own

    • @fobudomh
      @fobudomh 3 หลายเดือนก่อน +1

      @@PrinceSingh95577 We dont have the capability to shape aluminium.

  • @tigeri2336
    @tigeri2336 3 หลายเดือนก่อน +156

    I love this so called dictatorship under PM Modi...

    • @victorbar-s5c
      @victorbar-s5c 3 หลายเดือนก่อน

      Maybe you prefer dictatorship of that drug freak muslim Gandhi

    • @GI_MARDUNGA_DUNGA
      @GI_MARDUNGA_DUNGA 3 หลายเดือนก่อน

      If modi's dictatorship could be possible then it won't take us 8 yrs to just occupy land for bullet train projects.

    • @BabluBangalid
      @BabluBangalid 2 หลายเดือนก่อน +1

      S/he's not your slave to do as you direct​@@The-RealDracula

    • @Adrian11405EMUTrain
      @Adrian11405EMUTrain 2 หลายเดือนก่อน +19

      ​@@The-RealDraculaIf you enjoy staying in Pakistan, don't come here , stay there

    • @adithyaarun8465
      @adithyaarun8465 9 วันที่ผ่านมา

      fr is this is a dictatorship, i am loving it

  • @mayurcharniya8785
    @mayurcharniya8785 3 หลายเดือนก่อน +22

    we are lucky to have channels like you , for trusted news source

  • @desiavengersofficial580
    @desiavengersofficial580 3 หลายเดือนก่อน +175

    E5 hi ayega ❤

    • @ViratKohli-wy2sk
      @ViratKohli-wy2sk 3 หลายเดือนก่อน +15

      Latest generation aana chahiye yaar😢

    • @desiavengersofficial580
      @desiavengersofficial580 3 หลายเดือนก่อน +18

      @@ViratKohli-wy2sk latest hi ayega, Agreement me likha hua hai

    • @ViratKohli-wy2sk
      @ViratKohli-wy2sk 3 หลายเดือนก่อน +1

      Okay then no problem 😅​@@desiavengersofficial580

    • @oggyandro
      @oggyandro 3 หลายเดือนก่อน +3

      @@ViratKohli-wy2skE5 is the latest

    • @ViratKohli-wy2sk
      @ViratKohli-wy2sk 3 หลายเดือนก่อน +5

      @@oggyandro E7 hai shayad

  • @biswajitpattanaik5800
    @biswajitpattanaik5800 3 หลายเดือนก่อน +20

    1) Indian HSR Train will come
    2) E5 will be there
    People need to understand both can be used on, be it Indian or E5, why be so short sighted.

  • @abhisheksarkar1390
    @abhisheksarkar1390 3 หลายเดือนก่อน +8

    In Japan Shinkansen run at270kmph on most of the tracks... only from Utsunomiya to Moriyoka, Hayabusa reaches 320kmph

  • @musictherapyeditz6G
    @musictherapyeditz6G 3 หลายเดือนก่อน +67

    Bharat should develop 250km semi high speed broad gauge trains for railways Vande Bharat 2.0 and also develop or replace old tracks which can handle 250km speed.❤

    • @vedantgawade1226
      @vedantgawade1226 3 หลายเดือนก่อน +12

      Currently India is working for 250kmph tracks

    • @djhack007
      @djhack007 3 หลายเดือนก่อน +7

      Not possible to broad gauge maximum 160 km speed handle
      Standard gauge track par use hogi

    • @slender5738
      @slender5738 3 หลายเดือนก่อน

      ​@@djhack007bhai kabhi Spanish train ka naam suna hai Iberian gauge par chlti hai broad gauge jaisa hai woh

    • @anonymous-gz4ru
      @anonymous-gz4ru 3 หลายเดือนก่อน

      ab toh sare elevated tracks karo yar

    • @IndianGeek5589
      @IndianGeek5589 3 หลายเดือนก่อน +1

      @@djhack007 who said? 😂 Spanish have run 300+ on BG

  • @selfishsam143
    @selfishsam143 3 หลายเดือนก่อน +12

    Thanks bro for sharing real information ❤

  • @markosev.s286
    @markosev.s286 3 หลายเดือนก่อน +6

    India should build high speed trains it's own to gain knowledge and experience. If we relay on other countries we will forever depent on them

    • @bismayparida2115
      @bismayparida2115 2 หลายเดือนก่อน

      We are making them at BEML Bangalore, old news

  • @abhijeettripathi565
    @abhijeettripathi565 3 หลายเดือนก่อน +2

    Thanks for making this video. This clarification was very much needed for everyone. This was a much needed video to clear all the doubts.

  • @DocPrakhar
    @DocPrakhar 3 หลายเดือนก่อน +8

    I think E5 should be throughout the Diamond Quadrilateral and then for other connecting routes, we can use the slower 250 kph ( it must be operatinally 250 kph though) trains. All top 15 cities of india must be connected by 320 kph shinkansen. We could even ask to run 360kph Alfa X train, if the track allows.

  • @VeerChandija
    @VeerChandija 3 หลายเดือนก่อน +35

    Cancel karo e5 aur latest alpha x train lo japan se jo ki 400kmh ki spped se chalti hai 😊

    • @user-maymay2002
      @user-maymay2002 3 หลายเดือนก่อน +15

      Tracks ka kharcha bhi utna hi badega. power generation and grid lines bhi alternatively change karni padegi. Aur already kafi kaam ho chuka hai is cheez pe. so e5 cancel nahi kar sakte itne easily. kara bhi tho uske equivalent hi train leni padegi

    • @VeerChandija
      @VeerChandija 3 หลายเดือนก่อน +10

      @@user-maymay2002 Bhai alpha x bhi e5 technology par based hai aur tracks 450kmph tak capable hai

    • @ChiSa123
      @ChiSa123 3 หลายเดือนก่อน +1

      Uske liye tracks change karne nahi padhenge?!

    • @VeerChandija
      @VeerChandija 3 หลายเดือนก่อน +3

      @@ChiSa123 no both run on standard gauge

    • @AmanYadav1110-fy4nf
      @AmanYadav1110-fy4nf 3 หลายเดือนก่อน +5

      ​@@VeerChandijaafford kar loge 😂😂

  • @HonestSatish
    @HonestSatish 3 หลายเดือนก่อน +5

    👌🏻Bahot badhiya explaination @powertrain. Just need to suppliment that after Mumbai Ahmedabad bullet train project, we have 10 more corridors defined for high speed. India cannot financially and technologically afford to import trains for it. So this local push is likely to make those corridors viable amd independant. Nagpur Mumbai might actually run on Medha BEML supplied bullet train running at 250-280 kmph.

  • @devamjani8041
    @devamjani8041 3 หลายเดือนก่อน +32

    Will Bharat get technology transfer of Shinkansen like china did ?

    • @ChiSa123
      @ChiSa123 3 หลายเดือนก่อน +13

      Haan!

    • @sanatanotaku8194
      @sanatanotaku8194 3 หลายเดือนก่อน +5

      Yes.

    • @lunaticfringe7199
      @lunaticfringe7199 3 หลายเดือนก่อน

      china just copied it and made it advanced

    • @ComptetiveApproach
      @ComptetiveApproach 3 หลายเดือนก่อน

      Nhi hoga Japanese chutiya nhi he😅

    • @sambitranjan9584
      @sambitranjan9584 3 หลายเดือนก่อน +1

      ​@@ChiSa123 NO .... India will NOT get Shinkanshen technology. It will develop it's high speed rail indigenously.

  • @shubhamsaurabh3475
    @shubhamsaurabh3475 3 หลายเดือนก่อน +3

    Clarification k liye thanx bro aur jo bkvash kr rhe the unka muh bnd krne k liye....👍

  • @suprashank
    @suprashank 3 หลายเดือนก่อน +5

    Bhai make sure your channel is secure. Many big channels are getting cyber attacked

  • @kousikghosh7850
    @kousikghosh7850 2 หลายเดือนก่อน +2

    Awesome news ❤❤

  • @user-NOTexist
    @user-NOTexist 3 หลายเดือนก่อน +5

    Vande Bharat to baby step hai Indian Railways ka revolution lane me to aishe projects 10-15 saal lenge and imagine dusri sarkar aa jaye fir aise projects ko band kar de to?

  • @liuyizhi71
    @liuyizhi71 10 วันที่ผ่านมา +1

    Only passed here by to highlight that Indonesian HSR is already working

  • @n3xu5s-e7z
    @n3xu5s-e7z 3 หลายเดือนก่อน

    Thank you for clarifying this issue i was very disappointed when some news websites stated that shinkansen might not be coming to india due to high cost!

  • @ojayadev
    @ojayadev 2 หลายเดือนก่อน

    Much needed clarification. Thanks

  • @Usb-ls5rq
    @Usb-ls5rq 3 หลายเดือนก่อน +1

    The standard gauge track will be perfect for high speed trains, as it would help to achieve more stability than broad gauge tracks, as center of gravity will be more closer to both sides in a standard gauge train or bogey than a broad gauge tain set or bogey, which will be helpful for handling curves in high speed.

  • @VanshSingh-b1i
    @VanshSingh-b1i หลายเดือนก่อน

    Thanks for this information ❤ love from punjab ❤

  • @headhunter895
    @headhunter895 3 หลายเดือนก่อน +3

    You have not mentioned about e5 shinkanshen price negotiation, which has failed. The news was confirmed by the gov themselves.

    • @jaguarunleashed4935
      @jaguarunleashed4935 3 หลายเดือนก่อน +1

      Still on going i think. Whr has the govt confirmed that E5 sets wont be imported ?

    • @SaurabhRautIR
      @SaurabhRautIR 2 หลายเดือนก่อน +1

      Source of news de bhai. Dekhu to konsa govt confirmation hai jo khud NHSRCL ko nahi pata

  • @IndianGeek5589
    @IndianGeek5589 3 หลายเดือนก่อน +9

    But don't you think effort should instead have been put in developing 200-250kmph BROAD GUAGE capable train, given the IR network. Also BG 220kmph test track is being built in Rajasthan

    • @its.Sarthak101
      @its.Sarthak101 3 หลายเดือนก่อน +5

      Broad gauge can't handle high speed trains on curves that good as a standard gauge train. That is the reason the majority of the countries with high speed trains use standard gauge. Also to increase speed track alignment would also need to be changed and make it as straight as possible. So it is better to just make a new alignment with standard gauge for maximum efficiency.

    • @IndianGeek5589
      @IndianGeek5589 3 หลายเดือนก่อน +2

      @@its.Sarthak101 making new broad guage track is better than making new standard guage track, because then you can reuse existing stations, depots and also small sections of existing track, for interoperability. For example, if you upgrade just a core section of a trunk line, all the trains running on that line(provided compatible rolling stock) can benefit, whereas same is not true in Standard Guage, and everything has to be done from scratch.

    • @vofficial170
      @vofficial170 3 หลายเดือนก่อน +3

      ​@@IndianGeek5589 naa bro current train density bohot zyada hai tracks par Kitne saare mega block lene padenge i can't even comprehend that

    • @IndianGeek5589
      @IndianGeek5589 3 หลายเดือนก่อน

      @@vofficial170 new tracks should be built of course both for high speed and also for relieving density.

    • @vofficial170
      @vofficial170 3 หลายเดือนก่อน

      @@IndianGeek5589 that might work . Current network ko dheere dheere karte rahe upgrade aur jaha pe tracks ko straight kiya jaa sake waha pe hojaye. New high speed tracks are necessary warna isi upgrade ki vicious cycle mei fas jayenge

  • @shubham9578
    @shubham9578 3 หลายเดือนก่อน +2

    askpt - How is Vande Metro a Metro if it is operating just once during the day, up and down the route? Shouldn't there be a plan for operating multiple rakes frequently like long-distance suburban trains?

  • @prateekchaudhary8188
    @prateekchaudhary8188 3 หลายเดือนก่อน

    Thanks for clearing my doubts

  • @musictherapyeditz6G
    @musictherapyeditz6G 3 หลายเดือนก่อน +5

    Why do we not make maglev trains not bullet trains for high speed ??

    • @amongushighlights872
      @amongushighlights872 3 หลายเดือนก่อน +4

      Too expensive for India today

    • @vofficial170
      @vofficial170 3 หลายเดือนก่อน +14

      Cost aap apne bank account se de dena 😂 china toh bohot tezi se banata hai cheeze toh maglev train kyu nhi bana rha iska main reason hai cost.

    • @guardiansofgalaxy664
      @guardiansofgalaxy664 3 หลายเดือนก่อน

      ​@@vofficial170china maglev train does not have toilets😂

    • @Iamprotrust-di6bn
      @Iamprotrust-di6bn 3 หลายเดือนก่อน

      ​@@vofficial170and china has made its rail system mostly by taking loan so no comparison

    • @Iamprotrust-di6bn
      @Iamprotrust-di6bn 3 หลายเดือนก่อน

      ​@@amongushighlights872Fr

  • @vedantgawade1226
    @vedantgawade1226 3 หลายเดือนก่อน

    Mai chahta tha ki iss topic par yeh video bane kyuki jab bhi bullet train ki baat aati hai to comments mai log mil jaate hai kehte hue ki e5 cancel ho gayi ,bharat ko e5 ki hi jarurat hai,etc.

  • @adityagajjar3118
    @adityagajjar3118 3 หลายเดือนก่อน +3

    Shinkasen is coming atleast for this corridor since infrastructure is made for bullet train and not any other high speed train.

    • @navan1087
      @navan1087 2 หลายเดือนก่อน

      Bullet train and high speed train both are same.Same infra can handle any standard gauge high speed take.

    • @adityagajjar3118
      @adityagajjar3118 2 หลายเดือนก่อน

      @@navan1087 in France high speed train run on normal tacks. Shinkasen can't which is called bullet train avtar 1.

    • @navan1087
      @navan1087 2 หลายเดือนก่อน

      @@adityagajjar3118 Actually no one makes a high speed track just to be operated with a particular train set.Bullet train is just a japanese fancy name for high speed train.Indian HSR infra is trainset agnostic(as in anywhere) and we can run siemens, TGV,Alstom, CRRC or any other trains set with out any issue.Can you tell me the reason why your claiming that Indian HSR is Shinkensen centric in case if i am missing something?

    • @navan1087
      @navan1087 2 หลายเดือนก่อน

      @@adityagajjar3118 and what is normal track?

    • @adityagajjar3118
      @adityagajjar3118 2 หลายเดือนก่อน

      @@navan1087 Shinkasen run on specialized tracks . High speed trains run on tracks capable of withstanding speed 300-350 kmph.

  • @sunilkumarsingh3239
    @sunilkumarsingh3239 3 หลายเดือนก่อน +1

    Thank you bro for clear

  • @973sss
    @973sss 3 หลายเดือนก่อน +21

    Non technical & bina dimag wale & intentionally propaganda chalane ke liye aaj kal kahi gadhe social media pe aa gaye he.
    jinko na research efforts karna hai, na baato ki samajh hai, na cross check karna hai
    bas adhi adhri baate sun ke viewership & breaking news ke naam pe gobar felana hai.
    jisme kahi main news media & kahi print media ke bhi aadhe dimaag wale log bhi Shamil hai.
    Hamare yaha kahi saare news channel & newspapers me bina dimaag ke sansani felane ke liye abb kuchh bhi dikhaya & likha jaata hai.
    news paper ke editor columns me bhi aaj kal paid news & fake propaganda felaya jaata hai.
    Isi ke karan India ki media ki credibility hi nahi rahi.
    kuchh log bada achcha kaam kar rahe he likin ase juthe news wale paglo ki wajah se unn logo pe bhi log doubt karte he.

    • @himanshusingh-st7xi
      @himanshusingh-st7xi 2 หลายเดือนก่อน

      Abe to baat kya h

    • @nerrailwaygorakhpur7173
      @nerrailwaygorakhpur7173 2 หลายเดือนก่อน

      Gyani baba thoda Aaj tk, abp news channels ko boliye
      Jake puchiye unse ki kis base pe apne jhutha khabar chalaya

  • @mrrandom347
    @mrrandom347 2 หลายเดือนก่อน

    Thanks for clearing this doubt i thought this train will run instead of E-5

  • @Kimgjungunofficial
    @Kimgjungunofficial 2 หลายเดือนก่อน +1

    Bullet train project complete in 2027-2028

  • @xdfdf_
    @xdfdf_ 3 หลายเดือนก่อน +2

    @PowerTrain could what is your opinion on the fact that bengaluru pune mumbai which is a very important corridor has not be considered for bullet train???

    • @johnchrist-cn8ql
      @johnchrist-cn8ql 3 หลายเดือนก่อน +4

      sahayadri ghats says hello

    • @Adi-oc2hd
      @Adi-oc2hd 3 หลายเดือนก่อน +4

      Bcz Mumbai Pune Hyderabad was considered over it. Hyderabad and Bangalore may be connected afterwards.

    • @its.Sarthak101
      @its.Sarthak101 3 หลายเดือนก่อน +1

      Because Delhi Mumbai is the most important route and Mumbai Ahemdabad is a part of it.

    • @hard-crackers1227
      @hard-crackers1227 3 หลายเดือนก่อน +1

      Be it Mumbai-Pune-Bengaluru expressway or HSR, the biggest roadblock in this is Gujarat First policy,
      so as long as the current government is in power at the Centre, this does not seem to be happening.
      If there is a change in power at the Centre, then Congress can definitely pay attention to this.

    • @vofficial170
      @vofficial170 3 หลายเดือนก่อน +6

      ​​​@@hard-crackers1227yeah sure 😂 that party doesn't even bothered to provide basic necessities like toilets and you are expecting them to build bullet trains in the ghat section .

  • @hAbhibhi
    @hAbhibhi 3 หลายเดือนก่อน

    thanks for clearing it out

  • @nish6106
    @nish6106 3 หลายเดือนก่อน +2

    You cannot expect that people will do research and comment, this is the responsibility of the govt and ministry to come forward and give clarification on why they are ordering a train.

    • @DetCoAnimeFan
      @DetCoAnimeFan 3 หลายเดือนก่อน +5

      Its literally a google search away! How long will you blame government? They will also talk about this on twitter mainly, and lazy people won't even bother to find the tweet.

    • @nish6106
      @nish6106 3 หลายเดือนก่อน +2

      @@DetCoAnimeFan This attitude will make the BJP loose elections. People are stupid and literally will not do research, this doesn't mean you must blame them the govt must actively make effort to educate ppl. Same problems exist around negative opinions on Vande Bharat and I feel the ministry has not done enough to educate the ppl.

    • @saketchaturvedi1073
      @saketchaturvedi1073 3 หลายเดือนก่อน +1

      ​@@nish6106 tum initiative lelo and start educating

    • @DetCoAnimeFan
      @DetCoAnimeFan 3 หลายเดือนก่อน

      @@nish6106 Let them loose then... honestly if people are so handicapped that they can't even do a google search then we deserve nothing better than that ass party called CONgress

    • @PuneetSP
      @PuneetSP หลายเดือนก่อน

      ​@@nish6106 no way, government can never clarify each query of 1.4billion people.
      Citizens have to take responsibility, if not help govt. At least help oneself.

  • @AvishkarPatel-sk5ee
    @AvishkarPatel-sk5ee 3 หลายเดือนก่อน

    Nice info
    I think government should also clarifie this

  • @mileshul
    @mileshul 3 หลายเดือนก่อน +4

    Mereko ko tension ho rha hai ki Red wali ayegi ya Cyan wali ayegi 😂

    • @arushsinha9251
      @arushsinha9251 2 หลายเดือนก่อน +1

      🤣shayad cyan😅

    • @warti4080
      @warti4080 22 วันที่ผ่านมา +1

      kya pata orange aa jaye

  • @pankajikhe4425
    @pankajikhe4425 3 หลายเดือนก่อน +2

    I only don't like only one thing about this project it's taking too much time ye bane tabhi baki ke bullet train route approved honge 🙌🏻 muzy koi interest nahiy China se competition krene ka but logon ko aachi service melni chiye

  • @shubhamsaini4770
    @shubhamsaini4770 3 หลายเดือนก่อน +1

    Jaldi chalo bullet mujhe baithna hai😭😭😭😭

  • @alpha4502
    @alpha4502 3 หลายเดือนก่อน +2

    Want shinkansen Tsubasa E8 or something like fressiarossa,HS2

  • @erg0pr0xy
    @erg0pr0xy 3 หลายเดือนก่อน

    Any update on K Rail?

  • @pranavtambatkar8455
    @pranavtambatkar8455 3 หลายเดือนก่อน

    Its a time for india to improve trian service and at the same time subsidise them for common people .....

  • @machinemafia2616
    @machinemafia2616 2 หลายเดือนก่อน

    Great 👍

  • @kushajagarwal9761
    @kushajagarwal9761 3 หลายเดือนก่อน

    Thanks for clarifying

  • @vijaygamer3742
    @vijaygamer3742 3 หลายเดือนก่อน +1

    Indian own 250km bullet train is making in benguluru it's real guys

  • @vijaygamer3742
    @vijaygamer3742 3 หลายเดือนก่อน +1

    E5 serious bullet train are not cancel the project total project cost 70billion dollers india buying 18 bullet train so indian and japan collaboration not stop we should wait E5 bullet train will reach in 2026 in india this infromation is real not fake guys trust me❤❤❤

  • @user-j7y9wIl
    @user-j7y9wIl 3 หลายเดือนก่อน +18

    German company Siemens ki ICE4 mujhe jyada attractive aur beautiful train lagti hai,,, Japanese train ka naak bada Ajeeb sa lagta hai Donald duck 🦆 🦆 🦆 type ka

    • @mayankbiswas777
      @mayankbiswas777 3 หลายเดือนก่อน +4

      😂😂😂😂

    • @satchitanand8606
      @satchitanand8606 3 หลายเดือนก่อน +4

      Tgv is the most beautiful

    • @suprashank
      @suprashank 3 หลายเดือนก่อน

      Hahaha I agree

    • @ChiSa123
      @ChiSa123 3 หลายเดือนก่อน +2

      Japanese train ki naak aur speed dono Siemens ki train se badi hi! 😂
      Sirf France ki TGV match up karti hain.

    • @itcell5628
      @itcell5628 3 หลายเดือนก่อน

      KTX Cheyong Ryong aur Frecciaorossa 1000 ko dekh lo wo jyada acchi aur modern hai

  • @alterlons3292
    @alterlons3292 2 หลายเดือนก่อน +1

    Stop with the misconception.... India has already agreed for E5 series only... They have already been given the loan of 4000 crore.... How tf can they change the order?

  • @SohamSinha633
    @SohamSinha633 3 หลายเดือนก่อน +1

    Kolkata-Delhi me kon sa train chale ga e5 or 250 kmph wala

    • @djhack007
      @djhack007 3 หลายเดือนก่อน

      Made in india 250 km chale gi not loan condition like Aamdavad to Mumbai

  • @abhishekmohan2594
    @abhishekmohan2594 3 หลายเดือนก่อน +1

    Order at least 6 trainsets of e5 series

  • @weiguan4518
    @weiguan4518 3 หลายเดือนก่อน +1

    Japan 320km √。350Km/h ×

  • @lakshmananrajjk1989
    @lakshmananrajjk1989 3 หลายเดือนก่อน +1

    All TAXES EARNINGS REVENUES etc etc etc.etc etc.etc.etc of poor and middle class peoples dumped in gujarat

  • @shreyas_dubey
    @shreyas_dubey 3 หลายเดือนก่อน +1

    Shinkansen trains are beauty

  • @sudu916
    @sudu916 3 หลายเดือนก่อน

    We should construction of other routes as soon as possible!

  • @SkpalTube
    @SkpalTube 3 หลายเดือนก่อน

    I posted the exact question a few days back😅

  • @victorbar-s5c
    @victorbar-s5c 3 หลายเดือนก่อน

    Main question should be how to stop boulders on tracks.

    • @tanmaysrivatsa8550
      @tanmaysrivatsa8550 3 หลายเดือนก่อน

      Bullet train system will be similar to metro train it will either be on bridge or underground and if it will be in ground like Indian Railway then it will be full fencing that no one can cross

  • @YADNESHRANE-mt9jz
    @YADNESHRANE-mt9jz 3 หลายเดือนก่อน +1

    What about technology transfer of E5 series Shinkansen to India?

    • @vofficial170
      @vofficial170 3 หลายเดือนก่อน +1

      That will happen eventually but we will not be able to export those trains.

    • @nilanjanpramanik3587
      @nilanjanpramanik3587 3 หลายเดือนก่อน +1

      No need..bullet train tech. Are not that tough

    • @djhack007
      @djhack007 3 หลายเดือนก่อน

      Future mey Only assemble in india

  • @obito______
    @obito______ 2 หลายเดือนก่อน +1

    Chinese launched Meglev with +600km/h 3 years ago already bring that train....
    Japan's 600km/h meglev is still on experimental stage [ before u bark ]*

    • @rohityo8729
      @rohityo8729 หลายเดือนก่อน +1

      Bhai Chinese nahi german technology hai woh 😂😂😂

  • @bijoylaha7245
    @bijoylaha7245 2 หลายเดือนก่อน +1

    Bullet train 500km per hours

  • @JH09SUMIT
    @JH09SUMIT 2 หลายเดือนก่อน

    Even the Vande bharat can reach 200+ kmph, provided better track. Making 250+ kmph trains is not at all a tough job for India.

  • @sanchitwadehra
    @sanchitwadehra 3 หลายเดือนก่อน

    dhanyavad

  • @mehtapramod23
    @mehtapramod23 2 หลายเดือนก่อน

    ALL. FUTURE RAIL SHOULD BE HIGH SPEED IF WE WANT TO BE SUPER POWER UP TO 2047

  • @abhinandanmukherjee8256
    @abhinandanmukherjee8256 3 หลายเดือนก่อน

    The new 250 KMPH train has to be compatible with J-Slab to run on MAHSR track.

  • @adityavardhansingh3501
    @adityavardhansingh3501 3 หลายเดือนก่อน +1

    WE NEED E5 ONLY

    • @SS-fu6tu
      @SS-fu6tu 3 หลายเดือนก่อน

      No we need Alfa X

  • @Steve-so7uk
    @Steve-so7uk 2 หลายเดือนก่อน

    Yes I think the Japanese is going to cry hard because India is not going to purchase the E5.😊😊😊😊 I really feel sad for Japan now.

    • @VidhyaGawali
      @VidhyaGawali 17 วันที่ผ่านมา +1

      No shinkasen going to come but for only Mumbai ahmedabad route not for other routes for other routes made in India bullet trains

    • @Steve-so7uk
      @Steve-so7uk 17 วันที่ผ่านมา

      @VidhyaGawali okay let's see the evidence later whether the E5 or Indian own HSR which I think is also good to try.

  • @SanataniParth1
    @SanataniParth1 3 หลายเดือนก่อน

    जय भारत जय श्रीराम 🇮🇳🚩

  • @bijoylaha7245
    @bijoylaha7245 2 หลายเดือนก่อน +1

    India bullet train 500 km per hour

  • @PHOENIXFTW.
    @PHOENIXFTW. 2 หลายเดือนก่อน

    Ab jb ye bullet train ajaegi fir kuch log bolenege iss paise se hospital or school banwa lete isse badiya

  • @mnmmnnmmnn
    @mnmmnnmmnn 3 หลายเดือนก่อน +2

    chinese bullet train ki window bhi badi h or speed bhi 350 h😢

    • @bismayparida2115
      @bismayparida2115 2 หลายเดือนก่อน +3

      Bhai china me speed reduce ho gayi hai 350 se 300 tak kyu ki track condition bahut sare area me bure condition mein hai aur train vibration ho raha hai zor zor se.... Thoda china insider dekho.

    • @mnmmnnmmnn
      @mnmmnnmmnn 2 หลายเดือนก่อน +1

      @@bismayparida2115 bhai aap dekho passanger parmveer ki video vo khud baitha h, 350kmph thi speed
      431 se 300kmph maglev train ki hui h jo 36km jati h

    • @bismayparida2115
      @bismayparida2115 2 หลายเดือนก่อน

      @@mnmmnnmmnn Oh sorry mistake...

  • @sambitranjan9584
    @sambitranjan9584 3 หลายเดือนก่อน +1

    We should Request China for High Speed Trains 😢
    They have the World's Largest Network of High-speed Rails, even way faster than Japan 🗾

  • @divyanshameta9516
    @divyanshameta9516 2 หลายเดือนก่อน

    Vo trains, RDSO ke test tracks ke liye bana rhe honge, jo rajsthan ke shamabhar lake me bn rha hai, vo 220 250 kmph ka trst track hai kafi kaam ho chuka hai vha, aur vha test ke results ke base pr, kayi indian railway ki main lines jese chanai mumbai hubali delhi ko, upgrad kiya jayega, silver lines (250kmph) janki bullet trains 320kmph ki goldan lines ki category me dal rakhi hai

  • @IamRohitPatil
    @IamRohitPatil 19 วันที่ผ่านมา

    Hame 500km/hr wali trains bhi banani chahiye

  • @dinsdxb5214
    @dinsdxb5214 2 หลายเดือนก่อน

    Small correction beml will built train sets which will run at 250 kmph not 220 and it will be tested at 280 kmph. Anything below 250 it's not high speed train. Pls do your home work properly.

  • @NJBJ007
    @NJBJ007 2 หลายเดือนก่อน

    The entire project will not be completed before 2032

  • @latvialava6644
    @latvialava6644 3 หลายเดือนก่อน +1

    250km toh hum uhe Vande Bharat ko aur Improve or kucx changes krke nikal lnge 😂

  • @sujatabarman8940
    @sujatabarman8940 หลายเดือนก่อน

    If we'd be successful to build 220 kmph operational speed train,we need not bullet train now as bullet trains are highly expensive, so our common people will not afford it, if we see ,Mumbai to Amedabad Bullet train's project ,we have to expense 1 lakh, 10 crore Rupees to make only 508 km bullet train's infrastructure, think ,how big ammount ! ,if we waste so huge money only to make 508 km railway , then see, if want to build 2400 km bullet train's infrastructure, how much ammount needed ? We can build for atleast 10/20 vande bharat train's infrastructure at the same money, but i don't mean, we need not bullet trains, we need its after 10 yrs later when our economy will be more strong, Jai.Hind, jaiBharat.

  • @ArchsStanton
    @ArchsStanton หลายเดือนก่อน

    1:03 *IS HIGH SPEED TRAIN NETWORK IN CHINA.*

  • @vishalparmar5786
    @vishalparmar5786 3 หลายเดือนก่อน +1

    🎉🎉

  • @djhack007
    @djhack007 3 หลายเดือนก่อน +2

    Jica loan condition hai ki Aamdavad to Mumbai route pey Bid khali Japan ki company hi karegi kawasaki or Hitachi (uchiha is joke) operating E5 shinkansen bullet train 🚅
    E5 shinkansen bullet train operating only Aamdavad to Mumbai or Delhi to Mumbai
    Making standard gauge track india High speed train top speed 280 kmbut operating Speed 250km🚄 hogi megha engineering infrastructure aur or BEML body manufacturing karengi
    Only testing Aamdavad to Mumbai not operating
    Ha but next route pey banglore to chennai standard gauge making india train chale gi 250km speed par not loan condition

  • @CringeUltimatum
    @CringeUltimatum 3 หลายเดือนก่อน

    Japan ne aise hi low interest pe loan nhi diya tha

  • @nareshjagdale6900
    @nareshjagdale6900 2 หลายเดือนก่อน

    Need Japan Shinkasen E5 Bullet train

  • @anandsuralkar2947
    @anandsuralkar2947 3 หลายเดือนก่อน +1

    dhruv rathe fans are those .
    does india need bullet train?

  • @ayushc5704
    @ayushc5704 3 หลายเดือนก่อน +1

    Shayad kerala ka silver line mei use ho sakta hai

    • @jaguarunleashed4935
      @jaguarunleashed4935 3 หลายเดือนก่อน

      2008 se sun raha hu silverline. Kab banegi yeh silverline

    • @whereismohit
      @whereismohit 3 หลายเดือนก่อน

      It’s canceled or long term shelved

  • @notenigma4850
    @notenigma4850 3 หลายเดือนก่อน +1

    So we are not able to reverse engineer japanese bullet trains shame

    • @Iamprotrust-di6bn
      @Iamprotrust-di6bn 3 หลายเดือนก่อน +1

      One word for you you are dumb

    • @bmology
      @bmology 3 หลายเดือนก่อน +1

      ​@@Iamprotrust-di6bnhe is from congress it cell

    • @Iamprotrust-di6bn
      @Iamprotrust-di6bn 3 หลายเดือนก่อน

      @@bmology fr

  • @anupk8973
    @anupk8973 3 หลายเดือนก่อน

    A small country like South Korea has developed it’s own high-speed train but the mighty Indian state cannot develop it’s own HSR!

    • @Jeevaji14
      @Jeevaji14 3 หลายเดือนก่อน

      India can develop Ambani adani,but bullet train and development are out of the syllabus

    • @sagarshrivastava375
      @sagarshrivastava375 3 หลายเดือนก่อน

      ​@@Jeevaji14a geye chamche saale 😂😂

    • @sagarshrivastava375
      @sagarshrivastava375 3 หลายเดือนก่อน

      10 saal phele khaa the babu ??

    • @anupk8973
      @anupk8973 3 หลายเดือนก่อน

      @@sagarshrivastava375 Sagar Babu, the 1st Rajdhani Express started on 1st March 1969 and completed the journey from New Delhi to Howrah in 17 hours and 20 minutes. After 55 years It takes the same time officially (actual time may be more). Give up the Congress period, what's the achievement of Modi Govt. Don't be an Andhbhakt.

    • @Neoluddism
      @Neoluddism 2 หลายเดือนก่อน

      ​​@@anupk8973haha ugly rajdhani express made of ICF trash is achievement of congress

  • @basaiahable
    @basaiahable 2 หลายเดือนก่อน

    Investment on train is waste. Invest on 10 line 14 lines roads. Future will be back to road with Driverless cars and anybody can travel anywhere in their own vehicle and also live in that vehicle but it should electrical vehicle

  • @GI_MARDUNGA_DUNGA
    @GI_MARDUNGA_DUNGA 3 หลายเดือนก่อน +3

    India ke logo ko apne uprr bharosa bilkul bhi nhi hai. Jab tak hum log technology import krrte rhenge tab tak humara kuch nii hoskta.
    Frr baad mei khenge china ko dehko😂. Bhai china ne bhi kabhi 50km/h ki train se start kiya tha, communism me govt ka full control hota hai land occupy se lekrr business tak. India me land occupy krrte krrte 8, 9 saal lag jaate hai firr last me land owner court me case bhi file krr deta hai🎉

    • @尹政贤
      @尹政贤 3 หลายเดือนก่อน

      你随便去问一个中国人,99%的中国人希望他们的土地被占用从而获得高额赔偿。

  • @jayasuriyas2604
    @jayasuriyas2604 3 หลายเดือนก่อน

    Beml train test speed will be 280kmph and operational speed will be 250kmph according to Hindu and Swarajya

    • @SS-fu6tu
      @SS-fu6tu 3 หลายเดือนก่อน

      That is very slow when other countries are building 800km/h trains we will be left behind again.

    • @bismayparida2115
      @bismayparida2115 2 หลายเดือนก่อน

      ​@@SS-fu6tu No country is building 800 kmph train....

  • @christianschofil354
    @christianschofil354 3 หลายเดือนก่อน

    E5 shinkansen toh aayega hi, aur BEML yeh 250-280 chalne wale bhi banayenge trails k liye badme dekhenge kya karna hai vese b 2-3 hrs ka route toh khali nahi rakhenge kyuki 2 trains set banenge 8 coaches k 😅…

    • @nilanjanpramanik3587
      @nilanjanpramanik3587 3 หลายเดือนก่อน +1

      Beml manufacturer but bogey will be designed by icf and electronics by medha

  • @Triiiee24
    @Triiiee24 2 หลายเดือนก่อน

    400-500 hona cahiye

  • @BabluBangalid
    @BabluBangalid 2 หลายเดือนก่อน

    First stop accidents of existing trains.

  • @qwill8254
    @qwill8254 3 หลายเดือนก่อน

    In the long run . E5 is too expensive , requires too much maintenance also they are also designed for. Japanese climate , which is cooler than Indian subcontinent

    • @Iamprotrust-di6bn
      @Iamprotrust-di6bn 3 หลายเดือนก่อน

      Bro why people like you in india so uneducated 🤡

  • @letsrocktheday5322
    @letsrocktheday5322 2 หลายเดือนก่อน

    meanwhile peaceful community planning How to throw rocks on
    bullet train 😒

  • @prathameshkamble3349
    @prathameshkamble3349 3 หลายเดือนก่อน +1

    But 220 isn't too slow for bullet train?

    • @vofficial170
      @vofficial170 3 หลายเดือนก่อน +1

      Nope , 280 capable 250 operational.

    • @GI_MARDUNGA_DUNGA
      @GI_MARDUNGA_DUNGA 3 หลายเดือนก่อน

      😭 guru ji, our fastest train used to run at the speed of 90km/h on indian tracks.
      Isn't it great that we are atleast talking about to develop a train run at 220km/h.
      If we get success in 220km/h, soon we can develop 320km/h trains too. Shinkasen will come!

    • @brijspy
      @brijspy 27 วันที่ผ่านมา

      220 cannot be called as bullet train

  • @rohanpreetsingh4199
    @rohanpreetsingh4199 3 หลายเดือนก่อน

    Bhai Delhi Amritsar bullet train ka kam kab Tak start ho sakta hai

    • @mrshubhamtech9112
      @mrshubhamtech9112 2 หลายเดือนก่อน

      Bhai pehle Mumbai-Ahmedabad route operational hone ke baad hi baaki routes approved honge

  • @shardadevi2727
    @shardadevi2727 3 หลายเดือนก่อน +2

    Ye sab fake video bante hai e5 series ki bullet train ayegi 😂😂😂 sab pagal bante hai logo ko