Oil and Gas Engineering (Part 2) Wellhead and Wellhead Control Panel (WHCP)

แชร์
ฝัง
  • เผยแพร่เมื่อ 21 พ.ค. 2021
  • A Wellhead Platform (WHP) mainly includes an integrated deck, utility systems, wellhead systems, helideck and drilling facilities. At times, it could be linked to Floating, Production, Storage and Offloading (FPSO) vessel or Central Production Platforms (CPP).
    The Christmas tree valves shall be actuated by WHCP with hydraulic supply and these valves shall be operated through the WHT ESD system, using electrical solenoid valves. These solenoid valves shall be part of the WHCP and the Shutdown logic shall be executed at the WHT ESD System.
    Usually, Wellhead Control Panel (WHCP) is place about 100 meters away from the wellhead or Christmas tree and the Hydraulic or Pneumatic output from panel is connected to wellhead through properly sized tubes.
    #Oil and Gas #WHCP # Wellhead #ESD System #SSSV #SCSSV #SSV

ความคิดเห็น • 17

  • @dipakpimple869
    @dipakpimple869 9 วันที่ผ่านมา +1

    Nice

  • @rameshma403
    @rameshma403 11 หลายเดือนก่อน +1

    Very Good. Worth of Information

    • @eFundaChannel
      @eFundaChannel  11 หลายเดือนก่อน

      Thanks for watching eFunda videos and kindly share with others as well so that others can get benefit from these videos. Pls also watch other videos for more information... Thanks.

  • @ryannjorgeora7534
    @ryannjorgeora7534 2 ปีที่แล้ว +1

    Thanks sir for detailed explanation.its help me a lot. Wish for success of your channel

    • @eFundaChannel
      @eFundaChannel  2 ปีที่แล้ว +1

      Thanks for watching eFunda and very happy to know that our videos are really helping viewers, watch all the videos and appreciate if you can share with someone really in need..

  • @rohithsharma9226
    @rohithsharma9226 2 ปีที่แล้ว +1

    Well explained thank you sir

    • @eFundaChannel
      @eFundaChannel  ปีที่แล้ว

      Thanks for watching eFunda vidoes and pls share with others as well so that others can get benefit from these videos.. keep watching eFunda.

  • @njchris1048
    @njchris1048 2 ปีที่แล้ว

    Beautiful

  • @ragesh166
    @ragesh166 2 ปีที่แล้ว

    Thanks🙏🙇

  • @Naveenkumar-yn2je
    @Naveenkumar-yn2je 2 ปีที่แล้ว +1

    Nice explanation Sir 👍
    Thanks very much Sir 🙏

    • @eFundaChannel
      @eFundaChannel  2 ปีที่แล้ว

      Thanks Naveen and appreciate you liked our efforts. Kindly share with others too, so that one can get help to understand various engineering topics.
      Pls LKIE SHARE and SUBSCRIBE to our channel and keep watching eFunda..Thanks

    • @Naveenkumar-yn2je
      @Naveenkumar-yn2je 2 ปีที่แล้ว

      @@eFundaChannel
      Sir we need more videos on OCTG/API products of knowledge and standards.

  • @ahmadfathy8816
    @ahmadfathy8816 2 ปีที่แล้ว +1

    Are there any foreign Certificates in Reservoir engineering and production engineering like IWCF and IADC in Drilling ?

    • @eFundaChannel
      @eFundaChannel  2 ปีที่แล้ว +1

      Yes, across all regions Reservoir engineering / production engineering (IWCF or IADC) certification courses are available. You need to check the required information on internet before pursing. Thanks for watching our channel eFunda and keep sharing our video to someone in need.

  • @lionking101074
    @lionking101074 ปีที่แล้ว +1

    Goof