Section B - composite installation of the AM2, AM2S and AM2E from the pre-assessment manual

แชร์
ฝัง
  • เผยแพร่เมื่อ 9 มิ.ย. 2024
  • In this video, I talk you through Section B - Composite Installation
    Maximum time allowed 8hrs 30mins for AM2 and 10hrs for AM2S and AM2E.
    You will be allowed a minimum of 15mins to read this section of the candidate manual and prepare for assessment.
    I start by talking through the COMMON ERRORS secretion and then move on to the wiring of the lighting circuit, with provision of a neutral at each switch.
    I show you how to measure the back of a 90 degree bend in metal conduit, how to find the point where the bender starts bending, and then how to work out and bend a double set to an accessory.
    I then talk about bending a bubble set first, and then bending a 90 degree bend off of that with a 50mm radius/100mm diameter. I’ve just realised that I may have written that wrong in the video 😬
    Then I briefly talk about doubling connectors over and show you what you should be looking for.
    I hope the video helps and next I’ll be moving on to Section B - Inspection, Testing and Certification of the Composite Installation.

ความคิดเห็น • 89

  • @Turbostott
    @Turbostott ปีที่แล้ว +3

    Hi Adrien,
    Amazing that you have taken the time to present this so thoroughly.
    Thankyou for taking the time and hopefully will help in my assessment.
    As a sparky being in the trade for 35 yrs now having to do this to gain accreditation, this is very daunting, like if I had to take my driving test again, I'll have to unlearn some bad habits lol.
    Thanks again, and looking forward to digesting your content.

  • @angelofranklin1
    @angelofranklin1 3 ปีที่แล้ว +9

    Hi Adrian, your input in trying to help people learn is admirable.

  • @zilvinas05
    @zilvinas05 2 ปีที่แล้ว +3

    Super informative and helpful videos, as my am2 exam is coming very soon. Probably best preparation you can find on youtube! Highly recommended to all learners and for people who are working already, to be sure they doing it in right way. All the best of luck Adrian!

  • @georgeweston9024
    @georgeweston9024 2 ปีที่แล้ว +2

    I just recently passed my am2s assessment and want to say thanks. Your videos were very helpful in my preparation.

  • @jacobbrook2019
    @jacobbrook2019 2 ปีที่แล้ว +1

    Passed me AM2S a few week ago, videos are a massive help👍🏻

  • @DaZpy
    @DaZpy 2 ปีที่แล้ว +3

    You also get a wiring diagram for each part of the assessment an overall one for the install then one for each individual section like the DOL starter and such its really helpful i did mine last week and got distinction it was a very intense experience and you have to be on the ball but your videos helped me a lot, i do agree the analogy you use though if your trying to get through the Am2s just watching videos your going to struggle you need to be competent as the time for each section is just enough time you cant really make any mistakes or you haven’t the time to finish although the assessor is really friendly and atmosphere is relaxed theres no pressure from the centre just get through it quick and correct following spec and diagrams and you be fine.

  • @mij.londoner
    @mij.londoner 3 ปีที่แล้ว +8

    I’ve already done my Am2 , but I found your conduit tips useful, taught me a few things which I did but didn’t really know why, monkey see monkey do act, but now there’s clarity 😂
    Would love if you do more conduit videos on 25mm but physically show the procedure if possible.
    Thanks for sharing in general , really helps those who still need to do their Am2 and need tips to help them pass.
    👍🏽👍🏽👍🏽👍🏽

  • @RedaReda-uk9lm
    @RedaReda-uk9lm 3 ปีที่แล้ว +3

    Hi I have been watching all your videos. Very knowledgeable wise man. Well done

    • @Pure_electrical_training
      @Pure_electrical_training  3 ปีที่แล้ว

      Thank you 😁, to be fair I’m just your average electrician, it’s just the trade has been watered down so much that I appear better than I am

  • @MrFriskyWhiskey
    @MrFriskyWhiskey 3 ปีที่แล้ว +3

    Funny thing. I thought this was about a new motorway bypass. Silly me. Great vids :)

  • @muhammedpatan8465
    @muhammedpatan8465 3 ปีที่แล้ว +3

    Thanks for your efforts and learning a lot from your great video, wish you all the best

  • @M8d9R
    @M8d9R ปีที่แล้ว +1

    Hi Adrian, great videos and thank you for making them, a huge help.

  • @AlexK-bm3cr
    @AlexK-bm3cr 3 ปีที่แล้ว +2

    Nice and clear!Great job bud 👍

  • @GSHElectrical
    @GSHElectrical 3 ปีที่แล้ว +7

    Keep up the great work 👍

  • @walggo
    @walggo 3 ปีที่แล้ว +1

    Thanks Adrian you are doing very important education for free well done

  • @Alex-qb8no
    @Alex-qb8no ปีที่แล้ว +1

    Fantastic video so much information, thank you.

  • @shaunpollock1248
    @shaunpollock1248 2 ปีที่แล้ว +1

    I did my AM2 in 1994, and still enjoyed watching this very informative video 👍

  • @luluboxingtv2880
    @luluboxingtv2880 3 ปีที่แล้ว +1

    This was brilliant!!!!!

  • @jimmyflinn8718
    @jimmyflinn8718 3 ปีที่แล้ว +1

    Great video Adrian

  • @TheFella172
    @TheFella172 ปีที่แล้ว +1

    Thanks Adrian, Brent.

  • @sparkyuncut3975
    @sparkyuncut3975 3 ปีที่แล้ว +1

    A honest sparky right here

  • @joshwood4041
    @joshwood4041 2 ปีที่แล้ว

    Hi… I’ve been looking for the video you mentioned on how to put a bubble set and 90 into plastic conduit. I have my AM2 next week so any help would be appreciated?

  • @geraldpapa9126
    @geraldpapa9126 3 ปีที่แล้ว +2

    Hi mate I just join your videos very good explanation to what you doing well done!
    Can you please help me out with the questions for the portfolio please or where can I find them kind regards stay safe

  • @taxisteve60
    @taxisteve60 3 ปีที่แล้ว +1

    This is a great video I'm quit new to metal conduit not much call for it when house bashing would you be able to do a practical video on metal conduit as you explain it better thanks keep the vids coming

    • @Pure_electrical_training
      @Pure_electrical_training  3 ปีที่แล้ว

      I can do, but have you looked at the conduit videos by GSH electrical?
      Let me know how you get on

    • @taxisteve60
      @taxisteve60 3 ปีที่แล้ว

      @@Pure_electrical_training I've watched them but yours makes more sense

  • @geraldelwood9660
    @geraldelwood9660 ปีที่แล้ว +1

    Thanks for all the excellent info.
    One point I would like to clarify. When data cables crosses over Low voltage AC cable in trunking, I've always found it a bit tricky with restricted space. When you mention a "Bridge", is this simply a piece of conduit or similar material, to give added insulation which is rated for "Low voltage" and ensures there is no risk of dangerous voltages appearing on the data cables. I've always assumed that inducted interference cannot be avoided at crossover points, but as the area is so tiny it's not a real problem.

    • @Pure_electrical_training
      @Pure_electrical_training  ปีที่แล้ว

      The bridge is simply a piece of plastic that provides a barrier between the two categories of voltage, to avoid inducing a current.
      I was taught that you can only introduce a voltage of the cables are run parallel to each other, not if they cross over at 90 degrees, but the bridge is required for the AM2, so it’s their requirement

    • @geraldelwood9660
      @geraldelwood9660 ปีที่แล้ว

      @@Pure_electrical_training I suspect the reason is not to avoid inductance (as you say : unlikely) but to mitigate against the risk of a dangerous voltage being transferred onto the data cable - because insulation on data cables is not necessarily designed for 230V as they don't need to be, if run on their own.

  • @jameslong966
    @jameslong966 3 ปีที่แล้ว +1

    I wire my 2 way and intermediate lighting different, I dont bring a neutral to every switch, I'm just wondering in the way you have shown is that a link from Com to L1 in the switch and Com to L2 in the last switch thanks

    • @Pure_electrical_training
      @Pure_electrical_training  3 ปีที่แล้ว +1

      Feed into common on the first switch, L1 and L2 link over to the intermediate, then link into L1 and L2 at the last 2 way, switch wire out of the common on the last switch

    • @sparkyuncut3975
      @sparkyuncut3975 3 ปีที่แล้ว +1

      Lacking neutral at switch common for years, however it's a consideration now to allow smart light switches...but also no ladder required for maintenance.... except for cost consideration... wiring domestic lights in 3 core can allow for easy mods later..but combatted by wireless switches...many solutions

  • @chrissamson6171
    @chrissamson6171 ปีที่แล้ว +1

    Recently done my Am2s and failed certain parts one been the SWA. Now this sort of stuff is my bread and butter and I failed, do you have to identify all of the cores L1 L2 and L3 with brown sleeve? Also the grey in blue for the N?

    • @Pure_electrical_training
      @Pure_electrical_training  ปีที่แล้ว

      What does BS7671 say about identifying 3-phase, as the AM2 will follow the regs

  • @matthewcampbell9956
    @matthewcampbell9956 22 วันที่ผ่านมา

    Is thay lighting diagram correct?

  • @CnC_pro
    @CnC_pro 2 ปีที่แล้ว

    Dear Adrien I want to make a 3/4 size pipe bender using pulley roller, here need two pulley to complete that, would you tell me what are sizes pulley need to make that bender please?

    • @Pure_electrical_training
      @Pure_electrical_training  2 ปีที่แล้ว

      Apologies, I’m not sure I understand the question.
      You are making a pipe bender for galvanised conduit, I don’t quite understand what the pulley is for…
      Is it for the bending part

  • @donellsmith8372
    @donellsmith8372 3 ปีที่แล้ว +1

    I guess with the metal conduit, whether you do the 90 degree bend first or the double set, really depends on how long you need the other side of the 90 to be. Else when bending the conduit, it might hit the floor before you can get it to 90 degrees 🤔
    Also with regards to cuts and marks on the former to determine the back of bend, I've never had a problem with achieving the exact measurement this way, however it only works when you place the conduit in the opposite way to how you do with the engineer square i.e. the measured end is the one being bent. That being said I only ever work with 25mm conduit, so couldn't be certain that the same is true for 20mm 🤷‍♂️
    But for sure, my preference is doing the 90 first.

    • @Pure_electrical_training
      @Pure_electrical_training  2 ปีที่แล้ว

      You could always put the conduit on the bottom of the bender and bend upwards

  • @david1977m
    @david1977m 3 หลายเดือนก่อน

    As someone who did the 2365 route before the NVQ, and as such have to do the AM2 don’t I get to play with any conduit? I know I got tested in conduit at L2 but I like playing with conduit plus the L2 conduit with the running coupler is an easier than what you are showing, it just seems silly that there is a difference.

  • @aahmed678
    @aahmed678 2 ปีที่แล้ว +1

    Hi mate can you show a demonstration of the conduit bending?

    • @Pure_electrical_training
      @Pure_electrical_training  2 ปีที่แล้ว +1

      I have a video in the pipe line, please bear with me 😬

    • @aahmed678
      @aahmed678 2 ปีที่แล้ว

      @@Pure_electrical_training cheers mate, got am2s coming up in May, your videos are very useful👊

  • @sean1325
    @sean1325 2 ปีที่แล้ว +1

    Felt like I could do bends before I watched this now i feel like i dont have a clue 😂

  • @powercoolmarine6322
    @powercoolmarine6322 2 ปีที่แล้ว +1

    Hi Adrian, I watched your vid on being qualified or not - and putting your hand above the parapet - how’s that going ?
    I am in the beginning of a course and am becoming slightly concerned … is there a contact number to have a quick chat? Cheers! Michael

  • @DaleMarriott1337
    @DaleMarriott1337 3 ปีที่แล้ว +1

    Does anyone know if there is conduit on the AM2 I'm planning on doing this soon however I've not touched any conduit in ages.

    • @thee.n.v7957
      @thee.n.v7957 3 ปีที่แล้ว +1

      No all containment is pre done on the am2 all you do is the wiring
      I think the am2S has conduit bends in it

    • @Pure_electrical_training
      @Pure_electrical_training  3 ปีที่แล้ว +1

      I’ve heard that people who complete the AM2 without conduit, may have to do an update on containment later on 😬
      Have a look into it, it may be worth calling NET

    • @Pure_electrical_training
      @Pure_electrical_training  3 ปีที่แล้ว +1

      I’ve heard that people who complete the AM2 without conduit, may have to do a containment update later on 😬
      Have a look into and call NET, let me know what you find out 🤝

    • @DaleMarriott1337
      @DaleMarriott1337 3 ปีที่แล้ว

      @@Pure_electrical_training I'm pretty decent with containment anyway it's just the conduit. I've done it for about 2 weeks in three years.

    • @luluboxingtv2880
      @luluboxingtv2880 3 ปีที่แล้ว

      @@Pure_electrical_training I have an just about to start nvq and they stated if I have already done the am2 I will have to do an extra. Section to compensate the am2E so you are correct

  • @joellaight
    @joellaight ปีที่แล้ว +1

    When it comes to selecting protective devices, I believe you're given the cable size and type and you are supposed to select and fit the correct breaker based on cable size? I dont believe the spec tells you which breaker to fit???

    • @Pure_electrical_training
      @Pure_electrical_training  ปีที่แล้ว

      Have you done the AM2, as the feedback I’ve had tells you to follow the spec 👌

    • @joellaight
      @joellaight ปีที่แล้ว

      @@Pure_electrical_training I preparing for it. The prep course I'm doing has a section on how to select the protective device with the Ib

  • @dj6596
    @dj6596 2 ปีที่แล้ว

    Can you check out your intermediate wiring as it doesn't look correct to me. on the new type of intermediates the L1 are on the top and the L2 at the bottom. I would wire the L1 & L2 from the switch on the power side to the top L1 & L1 respectively and then wire on the lamp side L1 & L2 to the bottom L2 & L2 respectively depending on if you wanted all the the switches to be in the off or on position.
    I'm afraid if I followed wiring diagram that wouldn't work.

    • @Pure_electrical_training
      @Pure_electrical_training  2 ปีที่แล้ว

      I’ve checked the drawing and it’s correct 😁
      What brand of intermediate are you using?

    • @dj6596
      @dj6596 2 ปีที่แล้ว

      @@Pure_electrical_training I use the BG British General so you could be correct i suppose each brand work in different ways. I will have to buy different brands to see if this is the case. What brand does your diagram represent so I can see for myself.
      Thanks I enjoy your lessons I've not done the Am2 just did the 2391.

    • @Pure_electrical_training
      @Pure_electrical_training  2 ปีที่แล้ว

      @@dj6596 Is the 2391 the only qualification you have, as that is purely for testing

    • @dj6596
      @dj6596 2 ปีที่แล้ว

      @@Pure_electrical_training level 2&3 2356 and 18th edition

  • @kieranthomas3530
    @kieranthomas3530 9 หลายเดือนก่อน

    Is the AM2 assessment just wiring I’ve been told all containment has been done for you

    • @Pure_electrical_training
      @Pure_electrical_training  9 หลายเดือนก่อน +1

      If you look on the NET website it explains everything you need to know.
      AM2 has no containment installation.
      AM2S and AM2E have a small piece of metal and plastic conduit installation.
      www.netservices.org.uk/am2-versions/

  • @Sparkybyfifty
    @Sparkybyfifty ปีที่แล้ว +2

    I don't get why you have to use the supplied tools? Surely you get used to using your own tools and that will add additional stress if you are suddenly presented with tooling that has been ragged by other students in the past!

    • @Pure_electrical_training
      @Pure_electrical_training  ปีที่แล้ว

      It’s so that all learners get the same experience and fairness.
      Some people might not be able to afford decent kit and that would put them at a disadvantage

  • @piotrlobacz
    @piotrlobacz ปีที่แล้ว +1

    Sounds like these are pretty silly and basic mistakes to make taking in account 4 years of apprenticeship or at least 3 years of training.

    • @Pure_electrical_training
      @Pure_electrical_training  ปีที่แล้ว +1

      Indeed, but some people get nervous or just aren’t good in exam situations.
      Other times, people are put forward who really shouldn’t be as they just aren’t ready, or had sufficient training.
      A lot of the time you cannot blame the individual as they are trusting the system to ensure that they are in a good position.
      Unfortunately, there are a lot of people who make money from cutting corners or cheating the systems in place and the AM2 is at the very end of the production line, so they see the end results.

    • @Pure_electrical_training
      @Pure_electrical_training  ปีที่แล้ว

      Indeed, but some people get nervous or just aren’t good in exam situations.
      Other times, people are put forward who really shouldn’t be as they just aren’t ready, or had sufficient training.
      A lot of the time you cannot blame the individual as they are trusting the system to ensure that they are in a good position.
      Unfortunately, there are a lot of people who make money from cutting corners or cheating the systems in place and the AM2 is at the very end of the production line, so they see the end results.

  • @vlad516
    @vlad516 2 ปีที่แล้ว +1

    Ah, brits. One can rely on you guys to turn a 12 week course into years of legislation and bullshit