KITSEN Fast and Safe Steel H Beam Slab Formwork (3D System)

แชร์
ฝัง
  • เผยแพร่เมื่อ 18 ธ.ค. 2024
  • A new steel H beam slab formwork system coming with early-stripping head to replace the traditional H wood beam which helps to save construction cost and increase work output.
    / how-kitsen-3d-early-st...
    Reasons to use this system:
    --Safety and strong loading capacity, high strength steel beams.
    --High Efficiency and early-stripping, 5-7 days to finish one floor.
    --Longer Span and Good Reliability.
    --Easy to assembly, no bolt needed.
    --Economical, high reuse times of beams, cut new panle cost.
    --Great savings, no need to do plastering.
    --Environment friendly, less use of timer beams.
    --Can be used together with aluminum formwork system.
    KITSEN has been in this line of Scaffold and Formwork with superior quality and moderate price in China for 25 years. Also, we provide OEM and ODM service. So far, lots of our clients get advantages from our products and services. Fully hope you are the one too.
    More details about our company or products, please reach me at jancy@kitsen.com. Thanks in advance!

ความคิดเห็น • 2

  • @barakah8550
    @barakah8550 3 ปีที่แล้ว

    Hallwo mis blease l am aske about beams use in this video what is kind?

  • @barakah8550
    @barakah8550 3 ปีที่แล้ว

    What kind Steel or aluminum or plastic?
    And how much price on m long?