How to Estimate Equipment Cost In Construction Projects

แชร์
ฝัง
  • เผยแพร่เมื่อ 25 ก.ค. 2024
  • In this video I explain how to calculate the cost of equipment in construction projects, including all associated cost to the equipment used in construction projects such as acquiring cost, operator cost, fuel cost and any miscellaneous cost related to the equipment in the project.
    Labor cost estimation video: • Labor cost estimation ...
    You can enroll to our complete Quantity Surveying and Cost Estimation online courses from these below links:
    **Cost Estimation Course:
    cost-engineering-professional...
    **Procurement Course:
    cost-engineering-professional...
    If you would like to see takeoff content similar to our course for free , please visit our TH-cam channel:
    / @cepqs
    If you would like to join our Facebook page where we discuss everything related to quantity surveying and cost estimation:
    / costengpro

ความคิดเห็น • 34

  • @musasabri2317
    @musasabri2317 2 ปีที่แล้ว +1

    ماشاء الله عليك مهندس عادل .شرح وافي و كافي

  • @karimaboshosha2201
    @karimaboshosha2201 ปีที่แล้ว

    انا بدور عليك من زمان والله ، شكرا للمحتوي العالمي❤

    • @CEPQS
      @CEPQS  ปีที่แล้ว

      اشكرك و اتمنى لك التوفيق

  • @wajirabandara4876
    @wajirabandara4876 2 ปีที่แล้ว +2

    Dear Sir: Lesson is very useful and thank you so much

    • @CEPQS
      @CEPQS  2 ปีที่แล้ว

      Thanks a lot 🙏 and wish you all the best.

  • @faisaldilshad6765
    @faisaldilshad6765 2 ปีที่แล้ว +1

    Your videos are always very informative.
    Thanks

    • @CEPQS
      @CEPQS  2 ปีที่แล้ว

      Thank you brother. You always support and really thanks a lot for that ❤️. Hope you are doing well.

  • @nrnik604
    @nrnik604 2 ปีที่แล้ว +1

    Great video, thanks

    • @CEPQS
      @CEPQS  2 ปีที่แล้ว

      Thank you 🙏🙂

  • @udaysinghyadav6160
    @udaysinghyadav6160 7 หลายเดือนก่อน

    Sir, thanks a lot for Sharing your experience in such a easy and informative way.

  • @solidjasonlaz
    @solidjasonlaz 2 ปีที่แล้ว +1

    Very Informative video. Keep doing more video like this. 👍

    • @CEPQS
      @CEPQS  2 ปีที่แล้ว

      Thank you bro 😊❤️

  • @financepies1073
    @financepies1073 2 ปีที่แล้ว +3

    Hi. Great work.but TVM you have mentioned in 9:25 is vice versa. money shall lose value by time due to discounting present value concept

    • @CEPQS
      @CEPQS  2 ปีที่แล้ว +1

      True 👍 I’ll cover that concept in separate video. And thanks a lot for watching and support ❤️

  • @chilufyachristopher9804
    @chilufyachristopher9804 2 ปีที่แล้ว +1

    Thank you very much.✌✌

    • @CEPQS
      @CEPQS  2 ปีที่แล้ว

      Thank you brother 🙏, hope you enjoyed the video.

  • @yowmamen4767
    @yowmamen4767 2 ปีที่แล้ว +4

    Hello! Can you also make a discussion or tutorials on how to give a cost price when you are a general contractor and get a subcontractor for the project.

    • @CEPQS
      @CEPQS  2 ปีที่แล้ว

      Hello and thank you for watching 👍. Sure I can do that for you. Do you have any suggestions on which subcontract package you want me to discuss ??

    • @yowmamen4767
      @yowmamen4767 2 ปีที่แล้ว +1

      @@CEPQS I want a fire protection scope of work if you can. But if not anything you want for the benefit of everyone.

  • @nkululekoshaunthusi4893
    @nkululekoshaunthusi4893 ปีที่แล้ว

    Hi Ahmed, thanks for such a useful video. With regards to the items of calculating excavation rate, what happens if you are hiring an excavator and not buying it, what will change in the formula?

  • @buddikagayan1159
    @buddikagayan1159 2 ปีที่แล้ว

    Hi, Sir Can I have an Excel sheet related to the above video. Thank You.

  • @vinothshalabha3200
    @vinothshalabha3200 2 ปีที่แล้ว

    Interim payment 1 bill and final bill excel .can u send .one more videos explanation with excel sheet .I can download

  • @vinothshalabha3200
    @vinothshalabha3200 2 ปีที่แล้ว +1

    Can u send excel sheet prepare payment certificate for project

    • @CEPQS
      @CEPQS  2 ปีที่แล้ว

      Yeah sure, mail me on info@costengpro.com 👍

    • @vinothshalabha3200
      @vinothshalabha3200 2 ปีที่แล้ว +1

      I sent mail to you.pls send as soon as possible.i m waiting for your reply

    • @CEPQS
      @CEPQS  2 ปีที่แล้ว

      Excel sent :)

  • @AceCPAsBookkeeping
    @AceCPAsBookkeeping หลายเดือนก่อน

    TLDR: Equipment cost estimation in construction projects involves factoring in various annual costs and considering the time value of money for future resale, in order to determine the total cost of equipment and make informed decisions about acquiring and using it.
    00:00 💰 Equipment cost estimation includes purchase price and annual cost per year, which can be calculated by dividing the loss of money over the years by the number of years.
    01:33 💰 Equipment cost estimation in construction projects includes factoring in operator cost, fuel cost, and service/maintenance costs per year.
    03:01 💡 Equipment costs in construction projects include maintenance, insurance, and company overhead, with total annual costs including equipment, operator, fuel, service, and miscellaneous expenses.
    04:38 💰 The total cost of equipment in a construction project is determined by the annual cost and the productivity of the machine.
    06:02 💡 The excavation rate for the excavator is 1.65 dirhams per cubic meter, not accounting for loading or disposal costs.
    07:09 🚜 Excavation subcontractors need to ensure constant work for their equipment, while main contractors should carefully consider the need for equipment before acquiring it.
    08:24 💰 Calculate the cost of equipment in construction based on annual cost and usage, and consider the time value of money for future resale.
    09:33 🏗 Pay close attention to the time value of money, especially in high inflation countries, but in low inflation countries like where I am, it will not affect calculations much.

  • @lekanwusu1912
    @lekanwusu1912 2 ปีที่แล้ว +1

    Your video is good, but you talk too fast. Try reducing the speed of your teaching for people to understand better.

    • @CEPQS
      @CEPQS  2 ปีที่แล้ว

      Thank you for watching and I promise I’ll do my best to make it more clear 😊👍

  • @muslehosama5168
    @muslehosama5168 ปีที่แล้ว

    After 5 years the value of 100000 is less than today .

    • @CEPQS
      @CEPQS  ปีที่แล้ว

      Correct

    • @CEPQS
      @CEPQS  ปีที่แล้ว

      But if you plan to have 5% interest on them every year then after five years they will be more than 100000 👍

    • @CEPQS
      @CEPQS  ปีที่แล้ว

      Future value = present value x (1 + i)^n
      Where i is the interest rate and n is the number of years