Tree work / Grapple Madness!
ฝัง
- เผยแพร่เมื่อ 30 มี.ค. 2024
- 1) See signal from grapple loader truck that he needs a cut because a log is too long to fit in the truck.
2) Stop swinging incoming log from BIK 126
3) Scale logs, maybe dodge a repositioning log, alert operator with 5 chainsaw revs you are about to cut.
4) Cut log at desired length balancing on other logs.
5) Get out of way of incoming log
6) Collect camera.
38 seconds