Low quality work by BRO. The road should be at least 2.5 lane so that 2 vehicle can ply at random. Road can easily be widened by rock cutting. Progress of work of BRO is very very slow.
@@priyadarshiDas-cx7sc thanks for your opinion. Rock cutting these structures is not recommended in this area and hence this road may never widen. The actual DPN road is parallel to this road which is wide
Low quality work by BRO. Progress of work is very very slow. The road should have been made 2.5 lanes, instead it has been made 1.1 lane by BRO. The road can easily be widened to 2.5 lane by rock cutting. NHAI should be given the task instead of BRO.
Which camera di you user for this recording?
Go Pro Hero 11 Black
Low quality work by BRO. The road should be at least 2.5 lane so that 2 vehicle can ply at random. Road can easily be widened by rock cutting. Progress of work of BRO is very very slow.
@@priyadarshiDas-cx7sc thanks for your opinion. Rock cutting these structures is not recommended in this area and hence this road may never widen. The actual DPN road is parallel to this road which is wide
Low quality work by BRO. Progress of work is very very slow. The road should have been made 2.5 lanes, instead it has been made 1.1 lane by BRO. The road can easily be widened to 2.5 lane by rock cutting. NHAI should be given the task instead of BRO.