LRT3 expected to start operations on March 1, 2025, says Loke

แชร์
ฝัง
  • เผยแพร่เมื่อ 3 ก.ค. 2023
  • Transport Minister Anthony Loke said the Light Rail Transit 3 (LRT3), which connects the Johan Setia LRT station in Klang to the Bandar Utama station in Sungai Buloh, is expected to begin operations by March 1, 2025.
    Read more at rb.gy/lglvx
    WATCH MORE: thestartv.com/c/news
    SUBSCRIBE: cutt.ly/TheStar
    LIKE: TheStarOnline

ความคิดเห็น • 88

  • @alphestanley7194
    @alphestanley7194 ปีที่แล้ว +31

    LGE really fucked this project up, never compromise in public infrastructure. 44 sets of 6 cars down to 20 something sets of 3 cars. The reason why it was a 6 car train was so that it can learn from KJL’s failures and to optimise frequency and capacity. At the beginning everything will be smooth, but sooner or later there will be various complications in regards to frequency and capacity

    • @afizi1213
      @afizi1213 5 หลายเดือนก่อน

      yeahh its hard to explain they room is not so big ,and we dont need a pile in middle of road its make the room become narrow

    • @afizi1213
      @afizi1213 2 หลายเดือนก่อน

      at least give that 5 car train is good laa ,we can accept if they connect with it but the number of sets iss suck laa aduhhh lemah laa

  • @keechingchew86
    @keechingchew86 ปีที่แล้ว +17

    Please go check the Rapid bus services
    1. Bus drivers cepat keluar dari mrt terminal cepat balik ke terminal tanpa passengers
    2. Tak suka slow down dekat bas stop
    3. Marah sangat kalau orang slow nak masuk
    4. Slow tunjok mycard
    5. Tak senyum
    6. Bila panggil dia datuk dan terima kasih driver happy je

  • @aljauhar20s24
    @aljauhar20s24 ปีที่แล้ว +25

    Sudahlah scaled down, delayed pulak. Mohon kerajaan hari ini jgn scaled down projek MRT circle line. Yg complaint pasal kenapa tak dimajukan negeri2 lain, FYI, 1/3 penduduk Malaysia bertumpu ke KL termasuklah anak2 yg berasal dari negeri2 lain. Kalau nak dibangunkan MRT atau LRT di bandar2 lain, pastikan dulu jumlah pengguna yg bakal menggunakannya sebab kita tak mahu jadi seperti LRT Palembang.

    • @kesatria_gelap
      @kesatria_gelap ปีที่แล้ว +4

      mcm kat jepun la banyak je rumah2 free dan besar kat pinggir2 bandar..tapi kenapa orang muda sana sanggup duduk dlm tiny house kat tokyo..sebab peluang kerja dan kemudahan lain.

    • @shaqisumari304
      @shaqisumari304 ปีที่แล้ว

      Tapi yang Naik MRT Pjaya pun sendu sedan ajer

    • @naimsukarno9060
      @naimsukarno9060 11 หลายเดือนก่อน +1

      ​@@shaqisumari304biasela tu br nk start..samela MRT1 dulu sendu gak..ble TRX (mall n office) and Merdeka dah bukak..then baru tau sendu ke x

    • @mohdnazrin7150
      @mohdnazrin7150 10 หลายเดือนก่อน +1

      Sedih MRT2 dan LRT3 scale down oleh LGE. 😭😭

    • @afizi1213
      @afizi1213 2 หลายเดือนก่อน

      circle line ni mrt apa pulak bang ,kita dh ada dua mrt yg mahal yg rupa mcm itik pun ada

  • @ViolentCabbage-ym7ko
    @ViolentCabbage-ym7ko ปีที่แล้ว +14

    Scaling down the LRT cars trains from 42 sets of 6 car trains to 22 set of 3 car train is a dumb idea. People will packed like sardines and the frequency of each trains will be longer which defeats the purpose of a light RAPID transit.

    • @bryanyew3673
      @bryanyew3673 ปีที่แล้ว

      I know right, rather taking ktm instead

    • @fendi2785
      @fendi2785 10 หลายเดือนก่อน

      great accountant when handle infrastructure work. chinaman mentality

  • @Fmisch9292
    @Fmisch9292 ปีที่แล้ว +12

    Reducing the station nos. is fine but reducing to 3 cars train?? & only 22 train sets?? Bangang apa
    KL-PJ-Klang area dah la 24 jam busy

    • @zaimy5779
      @zaimy5779 ปีที่แล้ว +1

      tula kalau nk reduce pun atleast either cars dia ataupun train set..ini dua dua kene tros😊😊

    • @afizi1213
      @afizi1213 2 หลายเดือนก่อน

      tulah sebab dia bina lrt 3 ni permulaan nak kurangkan kesesakan laa selain harapkan ktm ,ktm ni area kl sana baru ramai org

  • @chongkienchin2919
    @chongkienchin2919 ปีที่แล้ว +16

    Jasa DSNR tetap dikenang terima kasih bosku. Kerajaan madani nak jadi popular semuanya kerja Dari Najib memang terbaik

    • @thinkerr
      @thinkerr ปีที่แล้ว +1

      Tapi memberi kontrak kepada kronix2 beliau dengan kos yg begitu tinggi. Kalau tidak tukar kerajaan PH dulu...tentunya LRT 3 sudah siap pada kos yg lebih rendah.

    • @aviatripchannel1982
      @aviatripchannel1982 ปีที่แล้ว +1

      @@thinkerrMRCB kroni ?

    • @aviatripchannel1982
      @aviatripchannel1982 ปีที่แล้ว +1

      @@thinkerr zaman bossku train set 6 gerabak lebih 22 stesen. Zaman PH 1.0 Cut jadi 3 gerabak cut stesen jugak… klang shah alam kawasan padat..nak kurangkan traffic congestion federal NKVE & KTM Comuter.

  • @calvinkoay1939
    @calvinkoay1939 ปีที่แล้ว +7

    Very good video. No masks! (people in thumbnail & video) Tomorrow (at of time of comment - from 12 midnight later), one can legally ride a crowded train or bus mask free!

    • @ryanjoseph9644
      @ryanjoseph9644 ปีที่แล้ว +1

      Yay. Thanks to the people in the video and thumbnail for not wearing masks, encouraging people to appreciate now it is time to stop wearing masks in any crowded areas.

    • @calvinkoay1939
      @calvinkoay1939 ปีที่แล้ว +1

      Our choice not to wear masks there just a typical exam duration away (2 hrs) from the time of commenting, 9.45pm July 4th!

    • @ikanmesra
      @ikanmesra วันที่ผ่านมา

      @@ryanjoseph9644 Yo how about insecure people

  • @tengsebastien1270
    @tengsebastien1270 ปีที่แล้ว +7

    It took 9 years to build and start the lrt3😮😢

    • @MrGergasikuat
      @MrGergasikuat ปีที่แล้ว +1

      satu dekat, this means this is a failed project even if it will be finished few years it is due in about 5 years. The capacity of 2 million people with 22 set or 3 car train. How many frequencies will it be when it will start at peak and normal hours? 6-15 minutes didn't last KTM before KVDT is 20 min? 16 billion for 37km is a mess up price WCE is 233km but cost half of it. EDPT Gemas JB 300km just about 10 billion. This is a whole messed up corrupted and idiot project that giving less impact on people but just the T20 companies to fuel up GDP.

    • @naimsukarno9060
      @naimsukarno9060 11 หลายเดือนก่อน +2

      Thanks to LGE sbb cut cost..cut accelaration cost..klu x sbb LGE, 2020 or 2021 (take covid into account) dah siap..dah la dr 6 koc ke 3 koc..power lah PH n LGE 😂😂😂

    • @user-hq3fg1wb4q
      @user-hq3fg1wb4q 4 หลายเดือนก่อน

      So much corruption happening that's why it took so long now with this new government everything move

  • @kesatria_gelap
    @kesatria_gelap ปีที่แล้ว

    dah operasi pastikan servis on-time...company kat malaysia ni banyak masalah displin..cut cost tapi tapi x fikir long term

  • @shaopengtee
    @shaopengtee ปีที่แล้ว +10

    Why set up so many lrt line in Klang valley? Can’t move some lrt line to other state which in dire need such as JB area?

    • @amirism91
      @amirism91 ปีที่แล้ว +2

      JB already has RTS which is kind of LRT connecting JB & Singapore. So no need lo

    • @amirism91
      @amirism91 ปีที่แล้ว +3

      Penang will start this year

    • @Kai-rust
      @Kai-rust ปีที่แล้ว +2

      ​@@rogerortizgonzalez4597 There were plans of building monorail or lrt in Kota Kinabalu, but the plan is still in its early stage, even the route has not yet been decided

    • @rainhazel249
      @rainhazel249 ปีที่แล้ว

      ​@@amirism91why no need lrt In JB...rts is different..what JOHOREAN NEEDS ARE FULL ROUTE FRM JB TOWN TO DIFFERENT ROUTE .....rts JB spore..not enough .and limited distance only

    • @kesatria_gelap
      @kesatria_gelap ปีที่แล้ว

      ​@@rogerortizgonzalez4597population not grow there

  • @muhammadhafiz_h4
    @muhammadhafiz_h4 ปีที่แล้ว

    Sayang kena cut cost dari 42 set 6-car ke 22 set 3-car... Pastu delay lagi.

  • @balankrishnin6589
    @balankrishnin6589 ปีที่แล้ว +2

    Terbaik mb loke

  • @rozianaismail4751
    @rozianaismail4751 ปีที่แล้ว +2

    Terima kasih najibrazak

  • @keechingchew86
    @keechingchew86 ปีที่แล้ว +1

    Focus on THIS LRT go quietly take the "free service and Mrt bus shuttle services" from station to station see
    1. The attitude of the drivers
    2. Smoking eating in the drivers seat
    3. Hanging used jacket at the senior citizen seat
    4. Keep the broom stick under the seat
    5. No smile "ADA IC!" He yelled "masuk! He yell" cepat! He yell!
    6. Driving so fast pass the busstop before you can raise your hand to flag down the bus.. Drive off from the terminal suddenly
    7. Can you go quietly go check acting as a passenger without body guards for a week. No one OK!!?

  • @bl553
    @bl553 ปีที่แล้ว

    Good job.

  • @shaqisumari304
    @shaqisumari304 ปีที่แล้ว

    TQ Atok

  • @jakv.
    @jakv. ปีที่แล้ว +2

    Delayed by 1 year!

  • @keechingchew86
    @keechingchew86 ปีที่แล้ว +6

    KL has mrt LRT why other state don't have

    • @rogerortizgonzalez4597
      @rogerortizgonzalez4597 ปีที่แล้ว

      yes correct,when an LRT for Sabah ,Kota Kinabalu? those states have been abandoned! why no ideas for future development, why keep them poor?

    • @raininoor3169
      @raininoor3169 ปีที่แล้ว +1

      @@rogerortizgonzalez4597go tell ur adun

    • @PadinYusof
      @PadinYusof ปีที่แล้ว

      Cause other states no money.

    • @nick_1551
      @nick_1551 ปีที่แล้ว

      Penang will have one soon. They are now trying to revive the Bayan Lepas LRT project.

    • @rogerortizgonzalez4597
      @rogerortizgonzalez4597 ปีที่แล้ว

      @@PadinYusof -they have money an resources, is just they been robbed by the federal govenrment take all and return 5% only. KL doesnt have OIl.

  • @tlplayz_ytc8501
    @tlplayz_ytc8501 ปีที่แล้ว

    CSR Zhouzjou rolling stock

  • @farizar72yusof27
    @farizar72yusof27 3 หลายเดือนก่อน

    Thanks DSNR...jasamu tetap dikenang.

  • @shafiqsams6094
    @shafiqsams6094 ปีที่แล้ว +1

    Fasa 1 2024 johan setia ke i-City Shah alam Fasa 2 2025 UiTM Shah alam ke bandar utama

  • @afizi1213
    @afizi1213 5 หลายเดือนก่อน

    why you use that design uhhhh i also like the normal train that have big skrin and big glass and its triangle design but if u said its okkk ,i can just give little complain about they time and also they offer

  • @ZacSentinel
    @ZacSentinel 2 หลายเดือนก่อน

    crrc zhuzhou Irv

  • @rtdcproject8075
    @rtdcproject8075 11 หลายเดือนก่อน

    Delayed. Sepatut 2024 1st quarter

  • @MohdAdrian
    @MohdAdrian 3 หลายเดือนก่อน

    22 sets of 3 car sets is really pathetic.

  • @user-wf8wp9sl1b
    @user-wf8wp9sl1b ปีที่แล้ว +1

    Why why why, asyik² dkt area KL je dibangunkan, negeri lain xwujud ke dimata menteri² ni? Mcm mn nak maju klau 1 tempat je jd tumpuan pembangunan. 🗿

    • @jibbsmckenze7555
      @jibbsmckenze7555 ปีที่แล้ว

      Ade ke negeri lain?😜😜😜

    • @user-wf8wp9sl1b
      @user-wf8wp9sl1b ปีที่แล้ว

      @@jibbsmckenze7555 mcm sial perangai, mcm mn la boleh lahir ke dunia. 🗿

    • @princeddienz93
      @princeddienz93 ปีที่แล้ว

      Salahkan orang kita jugak x bersatu padu, banyak je projek2 infrarakyat yang dirancang prev gov tapi disekat/ dibatalkan oleh gov after that.. Tak suka kita tukar la katakan, tapi impak dia kemunduran berpanjangan..

    • @lazymamazolaaa6414
      @lazymamazolaaa6414 ปีที่แล้ว

      semua benda ni kena ada kerjasama antara kerajaan pusat dan kerajaan negeri.. kalau kerajaan negeri xmau bgi kerjasama.. apa menteri ni boleh buat

  • @sharxM16
    @sharxM16 ปีที่แล้ว

    lama nya

  • @user-hq3fg1wb4q
    @user-hq3fg1wb4q 4 หลายเดือนก่อน

    With this new government everything is moving

  • @zrbakhtiar
    @zrbakhtiar หลายเดือนก่อน

    MIMPI !!!

  • @mohdhawari6714
    @mohdhawari6714 ปีที่แล้ว +3

    What about Sabahan & Sarawak? No LRT, No MRT, No Monorail ... the Jalan Raya so poor. Sabah produce 52% of Black Gold gor the Federal.

    • @sharxM16
      @sharxM16 ปีที่แล้ว +3

      kau tanya lah menteri korang diorang yg urus

    • @BillyRazOr2011
      @BillyRazOr2011 ปีที่แล้ว

      You think it's very easy to do? 😂

  • @leecavin9355
    @leecavin9355 ปีที่แล้ว +2

    Lrt 3 bandar Utama klang line start in 2025 march

    • @leecavin9355
      @leecavin9355 ปีที่แล้ว

      20 stn 6 stn is under provisional

    • @leecavin9355
      @leecavin9355 ปีที่แล้ว

      2 stn interchange is bandar Utama change to kajang line mrt & Glenmarie change to lrt line kelana jaya line

    • @leecavin9355
      @leecavin9355 ปีที่แล้ว

      Brt kl klang line no news yet

    • @amirism91
      @amirism91 ปีที่แล้ว +1

      ​@@leecavin9355tunggu LRT siap dulu pikir pasal BRT tu

    • @helmizamboo5913
      @helmizamboo5913 ปีที่แล้ว

      Mngarut lh bkan Feb 2024 .siap sepenuhnye..

  • @MrGergasikuat
    @MrGergasikuat ปีที่แล้ว +2

    satu dekat, this means this is a failed project even if it will be finished few years it is due in about 5 years. The capacity of 2 million people with 22 set or 3 car train. How many frequencies will it be when it will start at peak and normal hours? 6-15 minutes didn't last KTM before KVDT is 20 min? 16 billion for 37km is a mess up price WCE is 233km but cost half of it. EDPT Gemas JB 300km just about 10 billion. This is a whole messed up corrupted and idiot project that giving less impact on people but just the T20 companies to fuel up GDP.

    • @nick_1551
      @nick_1551 ปีที่แล้ว

      Construction for an entire viaduct-based line (& a pair of tunnels near Stadium Shah Alam) has always been more expensive. Both WCE & Gemas-JB EDTP were neither of these. They are mostly on ground level. If you already doubt a 16 billion, 37km LRT line, then how about the 30 billion, 57km MRT (Putrajaya) line?

    • @MrGergasikuat
      @MrGergasikuat ปีที่แล้ว

      @@nick_1551 Same I never understand why it must be 50 billion for MRT3 only a few billion less than ECRL and HSR. That's why I hate to support MRT3 because it is just there to feed T20 companies. 350Km HSR cost only 68billion and ECRL 74Billion for 665km . Imagine how many roads or schools or hospitals can be built for that price tag.

    • @nick_1551
      @nick_1551 ปีที่แล้ว +1

      @@MrGergasikuat precisely because they are all mostly on viaducts, & especially in ECRL's case, lots of tunnels.
      Another case in point: the JB-Singapore RTS. And mind you, SG is paying 61% of that RM10 billion cost as the station (Woodlands North) is underground.

    • @muhammadhafiz_h4
      @muhammadhafiz_h4 ปีที่แล้ว

      @@MrGergasikuatTry riding a bus here in Old Klang Road to Pasar Seni/KL Sentral. You'll see why we need MRT 3.

    • @MrGergasikuat
      @MrGergasikuat ปีที่แล้ว

      @@muhammadhafiz_h4 Might as well BRT, that corridor was already planned with BRT but then big company susah cari makan tak boleh nak cekau.

  • @aungmyintoo4635
    @aungmyintoo4635 ปีที่แล้ว

    The lrt rollingstock looks outdated and cheap.

  • @TheUrbanRebel
    @TheUrbanRebel 11 หลายเดือนก่อน +1

    Ingatkan Mac 2024, rupa2nya 2025...lama lagi lah kot

    • @jackraptor695
      @jackraptor695 11 หลายเดือนก่อน

      Janji hitam putih dicapati 🥲