Nice explanation. Thank you. Our Bukkapatnam tank is filled. Ground water level improved. This is a boon for people to grow horticulture crops with their bore wells. Thanks again. - m n murthy, Kothacheruvu
Thanks Bro, nice to see the presentation for HNSS project.Since the announcement of this project i was eager to see the complete project map. I am from @Kadiri town near the cherlopalli reservoir(Inaugurated in March 2019), this was my dream since childhood to see canals passing through kadiri, Thanks to Allah. after that thanks to YS Rajasekhar reddy
Your explanation is apt and can make public about awareness of the projects by which they should be able of atleast drinking water if not complete estimated irrigation and can judge themselves from fake news being propagated by the main stream news network business house's according to their convenience.
Thank you very much for your lucid explanation. I belong to Kothacheruvu which gets water from the main canal near puttaparthi. We don't depend on rains in kolar area now. Thanks to HNSS.
At 11:50, the Neeva branch canal connects the Krishna river to Neeva river near Chittoor. Not sure if this part is completed yet (Sept 2023). But this is the beauty of this 550 km long canal. It is connects Handri (Krishna tributary) river to Neeva river in Chittoor. Without this detailed demo, it is hard to find this information. Great job.
Excellent and detailed presentation on HNSS. Ralayaseema largest canal. You must be a either preparing for civils or a civil engineer. 😃There are lot of technical details too.
హంద్రీ. నివా. ప్రాజెక్టు గురించి చాలా మంచి విషయాలు తెలిపినందుకు మీ ఛానెల్ వారికీ ధన్యవాదములు Ap లో ఉన్న ఇతర నీటి ప్రాజెక్టు ల గురించి వీడియో ద్వారా మీ ఛానల్ లో ప్రసారం చేయాలి
Explanation is very good regarding the whole project, and this is very old project and available since 30 yrs. Can you explain what is the status now, and what are the missing things in overall project, how much efforts required to complete this project.
Namasthe brother,most important video topic in my life ,because my dream is GANGA KAVERI CANAL ,preliminary and main work completed UPTO KUPPAM small works are in pending near BYREDI PALLI , as a civil engineer l am appriciating about this GREAT WORK towards our society,when you are explaining i saw myself in you ,when you are explaining POLAVARAM PROJECT -CHINTALAPUDI- VYKUNTA PURAM BARRAGE also. I am from PALAMANER , on FEB 4TH water passes in PUNGANUR and MAR 5th water passes towards KUPPAM.Have a pleasent day brother
Luthachitkalaya Yagneswara Manikanta Sai Depala excellent question sir - but you should know the laws of geography and soil . As Mr Swamy said the water just started entering from the last six months . When ever you get the rain water in drought areas - the water evaporates faster than the normal delta places and the same law applies here - those are drought lands from the last 40 years . One single flow of water cannot change anything . It takes at least 3 to 5 full runs of water through canals to get the water levels up and to get the enough moisture in fields - hope that helps . Peace .
Good work bro (maa oru chittur to Gudiyatham road andra tamil nadu chek post dhagara vasthundi akadiki e project water vasthundha please tell me bro naa ooru devalam.)
what is the tentative date when the Adavipalli reservoir gets the water. whatever you are mentioning is the plan and if you know/ mention what is the status of up to where which reservoir the work completed will be more meaningful . The planning was done 10 to 15 years ago and if the work is not being taken up what is the use of having all of your videos. I appreciate your effort to explain so clearly about the project and if the execution is not taking place then no use of of all of these....
Next rayalaseema ku bhavugolikanga samudhratheera prantham endhuku ledhu ane vishayam meedha mana freedom fighter pingali venkaiyya gaaru cherchinchaaru ee topic meedha hindi channel lo oka video kuda undhi nenu aa video ni chusaanu kaani naaku fluent hindi lo aa video lo em chepthunnaaru anedhi artham chesukoovadam raavatledhu please e topic meedha meeru telugu lo oka full video cheyyandi sir ok please 🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏.
JAI jawan jai kisan jai Bharat Jai AMARAVATI JAI POLAVARAM PROJECT JAI VELUGONDA PROJECT JAI MAJOR IRRIGATION PROJECT'S JAI METRO RAILS PROJECT IN AP CITIES JAI PRODUCTIVITY DEVELOPMENT IN AP CITIES ❤️❤️❤️👍🙏🙏
Nandyal Native pakka rayalaseema who Design ed i appreciated that engineer's expertness kind explanation need where both rivers meet ithink that hundry rever appears always dry when it fills when it flows can you explain the source the water draw from srisilam dam at what level of storage the extra water drawn please explain this is also
Iam from punganur all revers are over flowing but still we are suffering with draft , not sure why governament not trying to fill the lakes using handriniva project
Some items of this project in Chittoor district are not completed so that water is not reaching to designated reservoirs. Due to sevier drought, drinking water in villages is still problem. Rytos are struggling for water to their agricultural fields.Rainfall here is very low and all MI tanks are empty almost.Government is requested to focus on this matter as time went wrong in previous government.
అన్న హంద్రీనీవా ఇప్పుడు చిత్తూరు జిల్లా కుప్పం శాంతిపురం రామకుప్పం ఈ మండలాలకు చాలా అవసరం వర్షాలు లేక ఎక్కువ మంది రైతులు ఆత్మహత్యలు చేసుకుంటున్నారు అంతా సొంత ఊర్లో వదిలేసి బయటకు పనులకు వెళుతున్నారు
E project epudu complete avthundhi.... Ma uru dharmavaram.... Ma mandalaniki water vadhalaka 20 years avthandi...cheruvulu borelu anni yendipoyyayi....
0:00 to 5:15 - project details, 5:16 to 8:04 - phase1 diagram explanation, 8:05 to 12:45 - phase2 diagram explantion, 12:46 to 16:16 - whole project map explanation
Nuv super bro
How much of this project is completed? Expected date of completion?
Diagram pdf pettandi
రాయలసీమ వున్న అన్నీ dams చేయండి. మీ video బాగుంది.
Good explanation.అలాగే reservoirs పేర్లు చెప్పేటప్పుడు అవి ఏ జిల్లాల్లో ఉన్నాయో కూడా చెప్తుంటే ఇంకా బాగా అర్థం అవుతుంది.Thankyou.
Right bro
చాలా విపులంగా వివరించారు.
మీ విషయ పరిజ్ఞానం అమోఘం.
Very nice information video very good keep it up 👌👍.
చాలా బాగా చెప్పారు. ఒక్కసారి మీరు టూర్ వేసి అన్నీి వరుసగా జలాశయాలు, టెన్నేల్స్ వీడియో లో చూపించంది.
Thappakunda 😃
Only then we can have complete clarity on the subject
Yes bro we need to know how these things work.
@@heybrotelugu plz send how Kundu river feeding from Bhanakacherla regulator
చాలా చక్కటి వివరణ ఇచ్చావు. Thank you very much.
Nice explanation. Thank you. Our Bukkapatnam tank is filled. Ground water level improved.
This is a boon for people to grow horticulture crops with their bore wells. Thanks again.
- m n murthy, Kothacheruvu
Entha baaga vivarichavayya suuuuper nuvvu chaala peddha thanks shathamanam bavathi shathayu.....
Thanks Bro, nice to see the presentation for HNSS project.Since the announcement of this project i was eager to see the complete project map. I am from @Kadiri town near the cherlopalli reservoir(Inaugurated in March 2019), this was my dream since childhood to see canals passing through kadiri, Thanks to Allah. after that thanks to YS Rajasekhar reddy
Your explanation is apt and can make public about awareness of the projects by which they should be able of atleast drinking water if not complete estimated irrigation and can judge themselves from fake news being propagated by the main stream news network business house's according to their convenience.
CBN swift pace chesadu works.
KIA daggara Gollapalli reservoir chusa nenu.
current govt neglected irrigation completely.
Thank you very much for your lucid explanation. I belong to Kothacheruvu which gets water from the main canal near puttaparthi.
We don't depend on rains in kolar area now. Thanks to HNSS.
Super explanation brother..రాయలసీమలో ఉన్న మిగతా ప్రాజెక్టులు గురించి కూడా వీడియోలు చేయండి బ్రదర్.
Wonderful presentation Every citizen of AP should see this and get educated.
Excelent detailed technical infirmation. Thank u.
Thanks broo video chala clarity ga chaisaru
My pleasure
At 11:50, the Neeva branch canal connects the Krishna river to Neeva river near Chittoor. Not sure if this part is completed yet (Sept 2023). But this is the beauty of this 550 km long canal. It is connects Handri (Krishna tributary) river to Neeva river in Chittoor. Without this detailed demo, it is hard to find this information. Great job.
చాలా చక్కగా వివరించారు
నేను ప్రొద్దుటూరు కడప జిల్లా. Thank you for your detail explanation.
Super editing and well explained about all. Tq
Thank you so much 🙂
Excellent and detailed presentation on HNSS. Ralayaseema largest canal. You must be a either preparing for civils or a civil engineer. 😃There are lot of technical details too.
I think he is civil engineering graduate
బయ్య చాలా బాగా ఎక్సప్లైన్ చేశారు tq .అలాగే మాది అగలి మండల కోడిపల్లి ka బార్డర్.మన చేరువులకు నీళ్లు ఎలా వస్తాయే కుంచెం వివరంగా చప్ప0డి 🙏🙏.
I am from Neeva branch canal region from piler town.super explanation bro.
Super Sir explanation and good information Sir
మిమ్మల్ని అభినందిస్తున్నాను. బాగా చెప్పారు
హంద్రీ. నివా. ప్రాజెక్టు గురించి చాలా మంచి విషయాలు తెలిపినందుకు మీ ఛానెల్ వారికీ ధన్యవాదములు
Ap లో ఉన్న ఇతర నీటి ప్రాజెక్టు ల గురించి
వీడియో ద్వారా మీ ఛానల్ లో ప్రసారం చేయాలి
కర్నూలు జిల్లా లోని సిద్ధేశ్వర ప్రాజెక్టు నిర్మాణం ద్వారా ముచ్చుమర్రి ప్రజలలో ఆనందం ఎప్పుడూ చూస్తామొ , 1952 సంవత్సరం క్రితం నాటి కళ ఎప్పుడూ నేరువేరునో
Great stidy and good information bro..
I don't know what is the connection b/w Pothireddy padu project and HNSS..
can you please reply..!!
Very good analysis.Thank you.
Explanation is very good regarding the whole project, and this is very old project and available since 30 yrs. Can you explain what is the status now, and what are the missing things in overall project, how much efforts required to complete this project.
Excellent explanation.. very informative
Good, you're always excellent.
Namasthe brother,most important video topic in my life ,because my dream is GANGA KAVERI CANAL ,preliminary and main work completed UPTO KUPPAM small works are in pending near BYREDI PALLI , as a civil engineer l am appriciating about this GREAT WORK towards our society,when you are explaining i saw myself in you ,when you are explaining POLAVARAM PROJECT -CHINTALAPUDI- VYKUNTA PURAM BARRAGE also. I am from PALAMANER , on FEB 4TH water passes in PUNGANUR and MAR 5th water passes towards KUPPAM.Have a pleasent day brother
Then why still drought existing on rayalaseema
Luthachitkalaya Yagneswara Manikanta Sai Depala excellent question sir - but you should know the laws of geography and soil . As Mr Swamy said the water just started entering from the last six months . When ever you get the rain water in drought areas - the water evaporates faster than the normal delta places and the same law applies here - those are drought lands from the last 40 years . One single flow of water cannot change anything . It takes at least 3 to 5 full runs of water through canals to get the water levels up and to get the enough moisture in fields - hope that helps . Peace .
Super bro... Good explanation..
Good work bro (maa oru chittur to Gudiyatham road andra tamil nadu chek post dhagara vasthundi akadiki e project water vasthundha please tell me bro naa ooru devalam.)
Very nice . Clear naration Bro. Congrats.
Super brother , wonderful explanation....subscribed the channel looking for more updates on this
what is the tentative date when the Adavipalli reservoir gets the water. whatever you are mentioning is the plan and if you know/ mention what is the status of up to where which reservoir the work completed will be more meaningful . The planning was done 10 to 15 years ago and if the work is not being taken up what is the use of having all of your videos. I appreciate your effort to explain so clearly about the project and if the execution is not taking place then no use of of all of these....
Hi bro, maadhi kuppam area, vedio lo information chalaa bagachepparu 🤝🤝🤝
Thank u so much andi
dhanyavadhalu tammudu.
Mudigubba mandal lo vunna Yogi vemana resarvoyar gurinchi cheppaledu bro
Next rayalaseema ku bhavugolikanga samudhratheera prantham endhuku ledhu ane vishayam meedha mana freedom fighter pingali venkaiyya gaaru cherchinchaaru ee topic meedha hindi channel lo oka video kuda undhi nenu aa video ni chusaanu kaani naaku fluent hindi lo aa video lo em chepthunnaaru anedhi artham chesukoovadam raavatledhu please e topic meedha meeru telugu lo oka full video cheyyandi sir ok please 🙏🙏🙏🙏🙏🙏🙏🙏🙏🙏.
Thank you bro. Nice info.
Split video into small groups. Cover district Wise. so that all those district people will be pay more interest to spare their time. Good luck.
Thnk u fr suggestion 😃
Super info bro. Thanks for the vodeo
Thank u sir for information...
Pattikonda
JAI jawan jai kisan jai Bharat Jai AMARAVATI JAI POLAVARAM PROJECT JAI VELUGONDA PROJECT JAI MAJOR IRRIGATION PROJECT'S JAI METRO RAILS PROJECT IN AP CITIES JAI PRODUCTIVITY DEVELOPMENT IN AP CITIES ❤️❤️❤️👍🙏🙏
Nice demo Bro.
Super chepinav po... Rayalaseema 🌾 Biddalaga
Very Very good effort
Good explanation bro
What about yadamari village is covered in h-n project near big-time thanks
Valuable information
You are doing good job bro
Valuable information bro
Credit goes to ysr
Nenu repe 100 punadi rallu vestanu appudu credit anta nade
Nice explanation ....
Thanks for the informetion my village near gudipalle 2nd canol
Kuppamaaa
Thank you bro, Madakasira nunchi
Nandyal Native pakka rayalaseema who Design ed i appreciated that engineer's expertness kind explanation need where both rivers meet ithink that hundry rever appears always dry when it fills when it flows can you explain the source the water draw from srisilam dam at what level of storage the extra water drawn please explain this is also
Thank you very much sir, Jai Hind
thanks for sharing info 🙏
What is the flow capacity of main canal and branch canal and distributors in cusecs.
Very good.
Excellent vedeo. Pls do an vedeo showing the status of this project
గొల్లపల్లి రిజర్వాయర్ కెపాసిటీ:0.46tmcft, చేర్లోపల్లే కెపాసిటీ:1.6tmcft
Great presentation! From Adivipalli Resorvoir to Kalyani Dam Branch canal will be there as I know. Can you please include that in your presentation?
But you forgot how many cusecs lifting from malyala and mucchumarri lift irrigation scheme. please provide that information also
Super.... sir
Iam from punganur all revers are over flowing but still we are suffering with draft , not sure why governament not trying to fill the lakes using handriniva project
Some items of this project in Chittoor district are not completed so that water is not reaching to designated reservoirs. Due to sevier drought, drinking water in villages is still problem. Rytos are struggling for water to their agricultural fields.Rainfall here is very low and all MI tanks are empty almost.Government is requested to focus on this matter as time went wrong in previous government.
Anantapur good video Sir.
పత్తికొండ మండలం హోసూరు గ్రామం గుండ కాలువ వెళ్లింది ... మా అమ్మమ్మ గారి ఊరు
1tmc= 12000cusecs flow /day into reservoir
Superb explanation.... bro
ఏ సీఎం స్టాట్ చేశాడు ❤❤❤❤
Kindly let us know the Actual status of this project and also please do a video on Babu Jagjeevan Ram Uttrandhra Srujala Sravanthi Project
Very nice explanation
Godd video
Hii bro nice analysis and I'm from a village near adivipalli resorvoir
అన్న హంద్రీనీవా ఇప్పుడు చిత్తూరు జిల్లా కుప్పం శాంతిపురం రామకుప్పం ఈ మండలాలకు చాలా అవసరం వర్షాలు లేక ఎక్కువ మంది రైతులు ఆత్మహత్యలు చేసుకుంటున్నారు అంతా సొంత ఊర్లో వదిలేసి బయటకు పనులకు వెళుతున్నారు
E project epudu complete avthundhi.... Ma uru dharmavaram.... Ma mandalaniki water vadhalaka 20 years avthandi...cheruvulu borelu anni yendipoyyayi....
Nice information bro..
Super
Very nice discribing
Thank you.
Nice information bro
E project valla singanamala ki water vasthaya
Super bro
We wants to know the plan and its details of Godavari and penna river linkage
Sir handri neeva canal present status chepthara.. Please..
Please one more video on HNSS , bro
ఇప్పుడు శ్రీశైలం రిజర్వాయరునుండి హంద్రి నీవా కాలువలో ఎంత దూరం వచ్చిందో చెప్పేవాళ్ళే లేరి ఇది ఏమి అన్యాయం.
Yemi prayojanam Kunool jilla pakshima prantham niki chukka neeru raavadam ledu e project nundi
Super brother
Very good
So good....
HNSS canal ni 1lac cusecs capicity penchali, velainanni min 100 TMC storage capacity Reservoirs ni kattali, apude mana Rayalaseema karuvuni permanent gaa pogottochu...
Marala dam capacity 0.46 TMC
Cherlopalli 1.425 you interchanged it bro