@@adrianobonaldo8941 actually not on the sand. Just the land very near to the sea. Still soils but very soft. Depth of piling = 36meter. Yes , we did the PDA test. Not sure it’s the same with your country’s Btw , thank you to watching my channel. Hope you enjoy it
@@apertureofconstruction1739 oh yes dei sure. The test usually is carry on by differnt standard but is about the same procedures. I am living in a country where se got frequently earthquacke so every test for new building or bridges involve all the structural manifactures to garantee the quality and the performances according the project everything to reduce the maintence in the future. Good job
My country free of earthquake. I’m from Malaysia. ( Equator Zone ) But the building is designed and endorsed by civil engineer. It’s better and secured. It might be different of method but same procedure. Thank you 😊! At least a positive feedback. Appreciated
👇 SUBSCRIBE TO Aperture Of Construction TH-cam CHANNEL NOW 👇
th-cam.com/channels/P_Az1G815pZLYCkYhrssIA.html
Hi, may I ask why do you apply paint to the welded joint at 1:53 ?
That is curing compound
Bos.1batang paling berapa feet panjang ?
12 meter ( 40 feet )
@@apertureofconstruction1739 tq info bos
Boleh tolong share & support :)
Ada 6meter,9meter dan 12meter
Satu pile piling saiz 150x150 brapa harga ya tuan termasuk delivery?
Zarul Zahari, 150mm 6Meter = Market price = RM 250 per length. Kena tahu deliver kepada mana.
Kos piling biasa berapa? lump sum atau kira berapa batang kalau saiz RC PILE seperti dlm video brp harga?
Ikut batang Dan berapa dalam u nak pile , depth of the piling.
Apa requirement untuk your project ?
@@apertureofconstruction1739ada buat jack in pile tak? Untuk RC250, boleh kasi no contact?
@@simetriconstruction692 keith.tan@tankaichean.com.my
第一次看打庄打到酱快哈哈哈😅
加速 4 倍
Harga satu batang piling brpa boss
Size? Panjang?
12 meter
200 mm
Cucuk cucuk, jumpa minyak bawah tanah. Haha kaye..
The splicing is useless.. it will corrode soon.. better use pipe duct for splicing to be poured with epoxy mortar for protection from corrosion..
Masuk btg no 1, mcm letak saje, turun terus.
Kat mana tu bos?
Kuala Selangor
Bikin rumah ke?
@@jarangpulang471 Ya. Tolong Share keluar terima kasih
Mi God the ground of like a butter
The land & soils at my current site is very soft. Very near to 🌊 sea , it’s a fishery village
Ah ok you are going to build a building on the sand. At the end you carry on with a random test on piles, to the resistance compression value?
@@adrianobonaldo8941 actually not on the sand. Just the land very near to the sea. Still soils but very soft. Depth of piling = 36meter.
Yes , we did the PDA test. Not sure it’s the same with your country’s
Btw , thank you to watching my channel. Hope you enjoy it
@@apertureofconstruction1739 oh yes dei sure. The test usually is carry on by differnt standard but is about the same procedures. I am living in a country where se got frequently earthquacke so every test for new building or bridges involve all the structural manifactures to garantee the quality and the performances according the project everything to reduce the maintence in the future. Good job
My country free of earthquake. I’m from Malaysia. ( Equator Zone )
But the building is designed and endorsed by civil engineer. It’s better and secured.
It might be different of method but same procedure. Thank you 😊! At least a positive feedback. Appreciated
Ahaw
Hi