Lab 03 Layout 2: Identifying and Reducing (Muda) Waste by Improving Workplace Layout
ฝัง
- เผยแพร่เมื่อ 16 ต.ค. 2024
- This lab demonstration clarifies these lean manufacturing related concepts:
The 5 S (The effect of violating 5 S in a warehouse is shown)
Muda, mura, and muri
The muda audit form
The workplace layout and its effect on muda, mura, and muri
Spaghetti diagram
Travel chart
The following is the link for layout 1:
• Lab 03 Layout 1: Ident...
The following is the link for layout 3:
• Lab 03 Layout 3: Ident...