River Geomorphology (41) - Double low head dam removal and grade control demo
ฝัง
- เผยแพร่เมื่อ 8 ก.ย. 2024
- This clip has no audio. Download the teaching guide at
emriver.com/doc...
Here we see a simple demonstration with two low head dams in place and active
equilibrium bedload transport throughout-- i.e. sediment entering the reach =
sediment leaving it, and there are no zones of net deposition or erosion.
The downstream (yellow) structure is then removed. The bed immediately
adjusts by downcutting. The incision is effectively controlled by the upstream
(blue) structure.
This shows how bedrock control or built structures can prevent incision and
headcutting. In the St. Louis, Missouri area, for example, buried sanitary sewer
lines and other utilities crossing streams often are exposed by incision in this
manner and act as grade controls.
If you enjoy this video please like and subscribe.
Don't forget to click the bell so you get notifications when we upload new videos and live stream.
For more information about our Emriver models and modeling media, visit our website at: emriver.com
Find us on:
Facebook - / littleriverusa
Twitter - / emrivermodel
LinkedIn - / litt. .
Instagram - / emrivermodel
Pinterest - / emrivermodel
I could watch these forever.
Justo el vídeo que necesito para incluirlo en el examen sobre Geomorfología fluvial.
first
and only 😆😆😆
Segundo