    Professor Wait, for the "raising the pipe" spreadsheet section, can I input a logic in column E(starting from cell E15 in your spreadsheet): if column D(accumulated volume) < 12705, column F (H depth)= 0; else column F(H depth)= Pond depth - X offset height? What is the logic in those key cells in your spreadsheet? Thanks.

  • @hunainshoukatsoomro2057
    @hunainshoukatsoomro2057 2 ปีที่แล้ว

    Thank you sir for uploading this video it really helps me, I am your online student from Pakistan

    • @IsaacWait
      @IsaacWait  2 ปีที่แล้ว +1

      Thanks for your comment, Hunain - glad to hear that you are joining us remotely. Best regards from West Virginia.

  • @nourelislamlounis3328
    @nourelislamlounis3328 2 ปีที่แล้ว

    thx alot sir as always
    u can't iamgine how much those are usefull for me ( even if am still an urban hydraulic engineer and not even working ) hehehe but still those are somethings we don't study at univ ...

    • @IsaacWait
      @IsaacWait  2 ปีที่แล้ว

      Thanks Nour -- hope you are doing well!